Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 11 days TDR #56268276

Bids Are invited for Repair And Overhauling Service - Integrated Service Contract For Cleaning Inspection Repair Maintenance Of Two Nos Of Tanks; Integrated Service Contract For Cleaning Inspection Repair Maintenance Of Two Nos Of Tanks; Yes; Buyer P

Issued by Boards / Undertakings / PSU · Golaghat, Assam
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Jul 2026
11 days left
EMD
3.77 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Golaghat → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bids Are invited for Repair And Overhauling Service - Integrated Service Contract For Cleaning Inspection Repair Maintenance Of Two Nos Of Tanks; Integrated Service Contract For Cleaning Inspection Repair Maintenance Of Two Nos Of Tanks; Yes; Buyer Premises - Cleaning Of Tank Sludge As Per Scope After Handover Of The Tank At Site. , Flange 2To3-150#: Opening Or Box Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost. , Flange 4 To 8-150# : Opening Or Box Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost. , Flange 10 To 14-150# : Opening Or Box Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost. , Flange Above 20 Upto 40-150 # : Opening Or Box Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost. , Flange Above 8To10-300#To600#,Above10to12-300# : Opening Or Boxing Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost , Tank – Dismantling And Erection Of Valvesdismantling And Removal Of Valves/Relief Valves Of Any Size From Tank Piping Including Disconnection Of Flanges, Supports & Fittings; Shifting To Workshop/Warehouse; Loading, Unloading & Transportation; Coordination For Servicing/Repair; Collection And Transportation Of Serviced/Replacement Valves From Workshop/Warehouse To Site; Positioning, Alignment And Erection; Fitment & Tightening Of Flanged Joints With Gaskets/Fasteners; Installation/Adjustment Of Supports; Restoration Of Disturbed Piping/Structures; Cleaning Of Site; Including Provision Of Manpower, Supervision, Tools & Tackles And Execution As Per Eic Instructions. , Tank – Dismantling And Erection Of Relief Valves (Pvrv/Erv)Dismantling And Removal Of Valves/Relief Valves Of Any Size From Tank Piping Including Disconnection Of Flanges, Supports & Fittings; Shifting To Workshop/Warehouse; Loading, Unloading & Transportation; Coordination For Servicing/Repair; Collection And Transportation Of Serviced/Replacement Valves From Workshop/Warehouse To Site; Positioning, Alignment And Erection; Fitment & Tightening Of Flanged Joints With Gaskets/Fasteners; Installation/Adjustment Of Supports; Restoration Of Disturbed Piping/Structures; Cleaning Of Site; Including Provision Of Manpower, Supervision, Tools & Tackles And Execution As Per Eic Instructions. , Tank Plate Repair (Shell, Bottom, Annular, Roof)Removal Of Damaged Shell, Bottom, Annular And Roof Plates By Gouging/Cutting Including Edge Preparation; Cutting, Bending And Grinding Of Carbon Steel Plates (Up To 16 Mm Thick); Handling, Shifting And Transportation From Storage To Site; Fit-Up, Installation And Welding Of New Plates In Accordance With Approved Wps And Relevant Standards Including Necessary Assistance For Testing; Complete With Manpower, Supervision, Tools & Tackles As Per Eic Instructions. , Tank Plate Metal Build-Up / Pitting Repairrestoration Of Corroded And Pitted Tank Plates By Weld Overlay/Metal Build-Up In Identified Areas; Surface Grinding, Dressing And Contour Correction After Welding; Providing Necessary Support During Inspection And Testing; Executed In Accordance With Approved Wps And Eic Instructions Including Deployment Of Manpower, Supervision, Tools, Tackles And Consumables. , Surface Preparation For Inspectionbuffing And Grinding Of Internal Tank Plates To Achieve Required Surface Finish Strictly For Inspection Purposes; Scope Limited To Inspection-Related Surface Preparation Only; Including Manpower, Supervision, Tools & Tackles As Per Eic Instructions. , Patch Plate Repair Works-Shell, Roof, Bottom And Annular Platesrepair Of Localized Pitted Or Reduced Thickness Areas Of Existing Tank Plates By Welding Patch Plates As Per The Instruction Of Eic, Including Cutting, Surface Preparation, Fit-Up, Welding And Finishing As Per Approved Wps And Eic Instructions Including Manpower, Supervision, Tools, Tackles And Consumables. , Repair Of Structural Work-Structural Member, Staircase, Handrail, Rolling Ladder,Platformrepair/Replacement Of Structural Members, Staircases, Handrails, Rolling Ladders And Platforms Including Cutting And Removal Of Damaged Portions, Fabrication, Fit-Up, Alignment, Welding/Bolting, Fixing Of Supports And Fasteners, And Restoration To Serviceable Condition As Per Applicable Codes And Eic Instructions Including Manpower, Tools, Tackles And Consumables. , Replacement Of Wind Girderremoval Of Existing Wind Girders At All Elevations By Gas/Cold Cutting/Grinding Including Associated Fittings And Supports; Shifting Of New Materials To Site With Crane/Handling Assistance; Fabrication And Erection Of New Wind Girders As Per Approved Drawings, Applicable Codes And Standard Engineering Practices/Eic Instruction Including Suplly Of Manpower, Supervision, Tools, Tackles, Consumables. , Roof Drain Replacement Workremoval And Dismantling Of Existing Roof Drain Piping, Spools, Supports And Swivel/Pivot Joints; Transportation Of New Materials To Site With Required Crane/Handling Assistance; Fabrication, Fit-Up And Installation Of New Roof Drain Piping Assembly Including Supports And Swivel/Pivot Joints; Hydrostatic Testing Of Complete Roof Drain System; Complete In All Respects As Per Approved Drawings And Eic Instructions Including Manpower, Supervision, Tools, Tackles And Consumables. , Nozzle Replacement (Roof, Foam Nozzle)Replacement Of Tank Roof And Foam Nozzles Including Marking As Per Approved Drawings; Removal Of Existing Nozzles And Reinforcement Pads; Edge Preparation; Fabrication, Alignment, Fit-Up And Welding Of New Nozzle Assemblies; Weld Finishing; Reconnection Of Associated Piping And Fittings; Restoration Of Supports; Executed As Per Approved Wps, Applicable Codes And Eic Instructions Including Manpower, Tools, Tackles And Consumables. , Steam Coil Replacement Workdismantling And Removal Of Existing Steam Coil Piping And Supports; Fabrication, Installation And Welding Of New Steam Coil Assembly As Per Approved Drawings; Installation Of Supports And Fittings; Hydrostatic Testing And Rectification Of Defects; Executed As Per Approved Wps, Applicable Codes And Eic Instructions Including Manpower, Tools, Tackles And Consumables. , Tank Cooling Line & Foam Line Worksfabrication And Erection Of Tank Cooling And Foam Lines Including Flame Cutting, Bevelling, Pipe Bending, Fit-Up And Welding Of Pipes Of Various Sizes; Execution At All Elevations Including Ground, In-Position And Overhead; Transportation Of Pipes, Flanges And Fittings From Owners Storage To Site; Complete As Per Approved Drawings, Applicable Specifications And Eic Instructions Including Manpower, Tools, Tackles, Gas Cutting Equipment And Safety Arrangements. , Steel Scaffolding Worksproviding, Erecting, Maintaining And Dismantling Rigid And Properly Secured Steel Scaffolding With Working Platforms At Required Locations And Elevations, Including Near Equipment, Structures ; As Per Eic Instructions And Applicable Safety Standards Including Supply Of Materials, Manpower, Tools, Tackles And Safety Accessories. , Fire / Cooling Water System – Deplugging Of Sprinklersdeplugging Of Sprinkler Nozzles Of Tank Cooling Ring System Including Removal Of Choked Sprinkler Heads, Installation Of New Heads/Nozzles Where Required, Bending, Alignment And Proper Fixing To Ensure Correct Spray Pattern; Execution At All Elevations Including Tank Roof, Shell And Cooling Rings; As Per Site Safety Norms And Eic Instructions Including Provision Of Manpower, Tools, Tackles, Scaffolding/Lifting Arrangements And Safety Equipment; Payment On Actual Inch-Meter Basis Per Tank. , Hydrostatic / Pneumatic Testing Workscarrying Out Hydrostatic Testing Of Piping/Tubes And Pneumatic Testing Of Reinforcement Pads At Specified Pressure As Per Approved Procedures; Providing Test Pumps, Gauges And Required Accessories; Attending And Rectifying Leakages Including Re-Testing; Offering System For Inspection And Clearance; Safe Depressurizing After Completion; Executed In Compliance With Applicable Safety Norms And Eic Instructions Including Manpower, Tools And Tackles. , Floating Roof Rim Seal Repair/Replacementrepair Of Primary & Secondary Seal For Floating Roof Tanks At Site Including Shifting Of Materials From Owners Shop To Site Of Errection , Opening Of Tank Manholes , Dismantling Of Damaged Seals , Taking Necessary Measurements ,Accesment Of Required Materials , Removal & Shifting Of Damaged Seal Materials , Hardwares To Earmarked Locations, Erections Of New Seal Materials , Cleaning & Removal Of Unwanted Materials From Inside Of Tank , Box Up Of Manholes Etc(Weather Protection Sheets, Curtains, Nuts, Bolts, And Fasteners Will Be Provided By Nrl As Free-Issue Items) , Piping Work-Process Related (Inside Tank Dyke)Fabrication And Erection Of Process Pipelines Inside Tank Dyke Area Including Transportation Of Free-Issue Materials From Owners Storage To Site; Cutting, Bevelling, Fit-Up, Welding And Alignment At All Elevations; Provision And Installation Of Required Supports; Removal And Disposal/Return Of Unused Materials To Designated Location; Executed As Per Approved Drawings, Applicable Codes And Eic Instructions Including Provision Of Manpower, Consumables, Tools, Tackles, Equipment And Lifting Arrangements , Thickness Gauging , Tank Floor Plate Inspection − Mfl/ Lfet/ Slofec Wfmpt/ Vbt (For Other Activities Likewise) , Copper Grit/Shot Blasting On Steel Surfaces On Location Like Internal Of Intermediate Storage Tanks, , Steel Structures And Other Flat Surfaces To S.A. 2-1/2 Sweedish Specifications In Position At All Heights And Location Excluding Cost Of Scaffolding With All Tools And Plants,Consumables, Labour Etc, Complete In All Respect As Directed By Engineer-In-Charge. Air In The Scope Of Contractor (Contractor Will Have To Make Is Own Arrangement For Compressor With Fuel,Operator Etc. For Arranging Required Air For Blasting.All Other Material And Equipment Like Hopper,Air Filter,Blasting Hose,Air Hose,Copper Grit,Ppe Etc Will Be Under Contractor Scope Of Supply ) , Supply And Application Of Approved Brand Of Paints With Airless Spray Method Including All Tools And Tackles, Consumables, Personal Protective Equipments For Safe Work, Supervision, Etc. To Complete The Work In All Respects As Per Nrl Painting Manual And Direction Of Inspection Deptt And Engineer In Charge Zinc Ethyle Silicate Primer (P1) One Coat @ 70 Micron Dft.Air In The Scope Of Contractor (Contractor Will Have To Make Is Own Arrangement For Compressor With Fuel,Operator Etc. For Arranging Required Air For Spray Painting. , Supply And Application Of Approved Brand Of Paints With Airless Spray Method Including All Tools And Tackles, Consumables, Personal Protective Equipments For Safe Work, Supervision, Etc. To Complete The Work In All Respects As Per Nrl Painting Manual And Direction Of Inspection Deptt And Engineer In Charge Tank Liner (L1) Two Coat @ 125 Micron Per Coat.Air In The Scope Of Contractor (Contractor Will Have To Make Is Own Arrangement For Compressor With Fuel,Operator Etc. For Arranging Required Air For Spray Painting. , Providing And Fixing Box Scaffolding System Up To Seven Story Height Made With 40 Mm Dia M.S. Tube 1.5 M Centre To Centre, Horizontal & Vertical Tubes Joining With Cup & Lock System With M.S. Tubes, M.S. Tube Challies, M.S. Cl S And M.S. Staircase System In The Scaffolding For Working Platform Etc. And Maintaining It In A Serviceable Condition For The Required Duration As Approved And Removing It There After .The Scaffolding System Shall Be Stiffened With Bracings, Runners, Connection With The Building Etc Wherever Required For Inspection Of Work At Required Locations With Essential Safety Features For The Workmen Etc. As Per Directions And Approval Of Engineer-In- Charge .The Volume Of The Scaffolding Shall Be Measured For Payment Purpose . The Payment Will Be Made Once Irrespective Of Duration Of Scaffolding. , Mobilization And Demobilization Of All The Required Equipment, Tool & Tackles, Manpower Etc To/From The Site, As Per Scope Of Of The Tender Document For Oil Recovery From Tank Bottom Sludge And Residual Sludge Removal And Cleaning Services And Tank Inspection

BOQ

Sl. No. Item TitleItem Description
1Cleaning of tank Sludge as per scope after handover of the tank at site.Cleaning of tank Sludge as per scope after handover of the tank at site.
2Flange 2\\"to3\\"-150#: Opening or Box up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra cost.Flange 2\\"to3\\"-150#: Opening or Box up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra cost.
3Flange 4\\" to 8\\"-150# : Opening or Box up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra cost.Flange 4\\" to 8\\"-150# : Opening or Box up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra cost.
4Flange 10\\" to 14\\"-150# : Opening or Box up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra cost.Flange 10\\" to 14\\"-150# : Opening or Box up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra cost.
5Flange above 20\\" upto 40\\"-150 # : Opening or Box up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra cost.Flange above 20\\" upto 40\\"-150 # : Opening or Box up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra cost.
6Flange above 8\\"to10\\"-300#to600#,above10\\"to12\\"-300# : Opening or Boxing up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra costFlange above 8\\"to10\\"-300#to600#,above10\\"to12\\"-300# : Opening or Boxing up of flanges with new gasket; gasket replacement after cleaning of gasket faces < cutting of gasket from sheets wherever required >; inserting or removal of spectacle blind/ tail blind wherever necessary to isolate piping;tank or any other equipment, as required; including supply of tools; tackles and manpower necessary to complete the job up to the satisfaction of Engineer In-Charge. If hot bolting is required it is to be done without any extra cost
7Tank – Dismantling and Erection of ValvesDismantling and removal of valves/relief valves of any size from tank piping including disconnection of flanges, supports & fittings; shifting to Workshop/Warehouse; loading, unloading & transportation; coordination for servicing/repair; collection and transportation of serviced/replacement valves from Workshop/Warehouse to site; positioning, alignment and erection; fitment & tightening of flanged joints with gaskets/fasteners; installation/adjustment of supports; restoration of disturbed piping/structures; cleaning of site; including provision of manpower, supervision, tools & tackles and execution as per EIC instructions.Tank – Dismantling and Erection of ValvesDismantling and removal of valves/relief valves of any size from tank piping including disconnection of flanges, supports & fittings; shifting to Workshop/Warehouse; loading, unloading & transportation; coordination for servicing/repair; collection and transportation of serviced/replacement valves from Workshop/Warehouse to site; positioning, alignment and erection; fitment & tightening of flanged joints with gaskets/fasteners; installation/adjustment of supports; restoration of disturbed piping/structures; cleaning of site; including provision of manpower, supervision, tools & tackles and execution as per EIC instructions.
8Tank – Dismantling and Erection of Relief Valves (PVRV/ERV)Dismantling and removal of valves/relief valves of any size from tank piping including disconnection of flanges, supports & fittings; shifting to Workshop/Warehouse; loading, unloading & transportation; coordination for servicing/repair; collection and transportation of serviced/replacement valves from Workshop/Warehouse to site; positioning, alignment and erection; fitment & tightening of flanged joints with gaskets/fasteners; installation/adjustment of supports; restoration of disturbed piping/structures; cleaning of site; including provision of manpower, supervision, tools & tackles and execution as per EIC instructions.Tank – Dismantling and Erection of Relief Valves (PVRV/ERV)Dismantling and removal of valves/relief valves of any size from tank piping including disconnection of flanges, supports & fittings; shifting to Workshop/Warehouse; loading, unloading & transportation; coordination for servicing/repair; collection and transportation of serviced/replacement valves from Workshop/Warehouse to site; positioning, alignment and erection; fitment & tightening of flanged joints with gaskets/fasteners; installation/adjustment of supports; restoration of disturbed piping/structures; cleaning of site; including provision of manpower, supervision, tools & tackles and execution as per EIC instructions.
9Tank Plate Repair (Shell, Bottom, Annular, Roof)Removal of damaged shell, bottom, annular and roof plates by gouging/cutting including edge preparation; cutting, bending and grinding of carbon steel plates (up to 16 mm thick); handling, shifting and transportation from storage to site; fit-up, installation and welding of new plates in accordance with approved WPS and relevant standards including necessary assistance for testing; complete with manpower, supervision, tools & tackles as per EIC instructions.Tank Plate Repair (Shell, Bottom, Annular, Roof)Removal of damaged shell, bottom, annular and roof plates by gouging/cutting including edge preparation; cutting, bending and grinding of carbon steel plates (up to 16 mm thick); handling, shifting and transportation from storage to site; fit-up, installation and welding of new plates in accordance with approved WPS and relevant standards including necessary assistance for testing; complete with manpower, supervision, tools & tackles as per EIC instructions.
10Tank Plate Metal Build-up / Pitting RepairRestoration of corroded and pitted tank plates by weld overlay/metal build-up in identified areas; surface grinding, dressing and contour correction after welding; providing necessary support during inspection and testing; executed in accordance with approved WPS and EIC instructions including deployment of manpower, supervision, tools, tackles and consumables.Tank Plate Metal Build-up / Pitting RepairRestoration of corroded and pitted tank plates by weld overlay/metal build-up in identified areas; surface grinding, dressing and contour correction after welding; providing necessary support during inspection and testing; executed in accordance with approved WPS and EIC instructions including deployment of manpower, supervision, tools, tackles and consumables.
11Surface Preparation for InspectionBuffing and grinding of internal tank plates to achieve required surface finish strictly for inspection purposes; scope limited to inspection-related surface preparation only; including manpower, supervision, tools & tackles as per EIC instructions.Surface Preparation for InspectionBuffing and grinding of internal tank plates to achieve required surface finish strictly for inspection purposes; scope limited to inspection-related surface preparation only; including manpower, supervision, tools & tackles as per EIC instructions.
12Patch Plate Repair Works-Shell, roof, bottom and annular platesRepair of localized pitted or reduced thickness areas of existing tank plates by welding patch plates as per the instruction of EIC, including cutting, surface preparation, fit-up, welding and finishing as per approved WPS and EIC instructions including manpower, supervision, tools, tackles and consumables.Patch Plate Repair Works-Shell, roof, bottom and annular platesRepair of localized pitted or reduced thickness areas of existing tank plates by welding patch plates as per the instruction of EIC, including cutting, surface preparation, fit-up, welding and finishing as per approved WPS and EIC instructions including manpower, supervision, tools, tackles and consumables.
13Repair of structural work-structural member, staircase, handrail, rolling ladder,platformRepair/replacement of structural members, staircases, handrails, rolling ladders and platforms including cutting and removal of damaged portions, fabrication, fit-up, alignment, welding/bolting, fixing of supports and fasteners, and restoration to serviceable condition as per applicable codes and EIC instructions including manpower, tools, tackles and consumables.Repair of structural work-structural member, staircase, handrail, rolling ladder,platformRepair/replacement of structural members, staircases, handrails, rolling ladders and platforms including cutting and removal of damaged portions, fabrication, fit-up, alignment, welding/bolting, fixing of supports and fasteners, and restoration to serviceable condition as per applicable codes and EIC instructions including manpower, tools, tackles and consumables.
14Replacement of Wind GirderRemoval of existing wind girders at all elevations by gas/cold cutting/grinding including associated fittings and supports; shifting of new materials to site with crane/handling assistance; fabrication and erection of new wind girders as per approved drawings, applicable codes and standard engineering practices/EIC instruction including suplly of manpower, supervision, tools, tackles, consumables.Replacement of Wind GirderRemoval of existing wind girders at all elevations by gas/cold cutting/grinding including associated fittings and supports; shifting of new materials to site with crane/handling assistance; fabrication and erection of new wind girders as per approved drawings, applicable codes and standard engineering practices/EIC instruction including suplly of manpower, supervision, tools, tackles, consumables.
15Roof Drain Replacement WorkRemoval and dismantling of existing roof drain piping, spools, supports and swivel/pivot joints; transportation of new materials to site with required crane/handling assistance; fabrication, fit-up and installation of new roof drain piping assembly including supports and swivel/pivot joints; hydrostatic testing of complete roof drain system; complete in all respects as per approved drawings and EIC instructions including manpower, supervision, tools, tackles and consumables.Roof Drain Replacement WorkRemoval and dismantling of existing roof drain piping, spools, supports and swivel/pivot joints; transportation of new materials to site with required crane/handling assistance; fabrication, fit-up and installation of new roof drain piping assembly including supports and swivel/pivot joints; hydrostatic testing of complete roof drain system; complete in all respects as per approved drawings and EIC instructions including manpower, supervision, tools, tackles and consumables.
16Nozzle Replacement (Roof, Foam Nozzle)Replacement of tank roof and foam nozzles including marking as per approved drawings; removal of existing nozzles and reinforcement pads; edge preparation; fabrication, alignment, fit-up and welding of new nozzle assemblies; weld finishing; reconnection of associated piping and fittings; restoration of supports; executed as per approved WPS, applicable codes and EIC instructions including manpower, tools, tackles and consumables.Nozzle Replacement (Roof, Foam Nozzle)Replacement of tank roof and foam nozzles including marking as per approved drawings; removal of existing nozzles and reinforcement pads; edge preparation; fabrication, alignment, fit-up and welding of new nozzle assemblies; weld finishing; reconnection of associated piping and fittings; restoration of supports; executed as per approved WPS, applicable codes and EIC instructions including manpower, tools, tackles and consumables.
17Steam Coil Replacement WorkDismantling and removal of existing steam coil piping and supports; fabrication, installation and welding of new steam coil assembly as per approved drawings; installation of supports and fittings; hydrostatic testing and rectification of defects; executed as per approved WPS, applicable codes and EIC instructions including manpower, tools, tackles and consumables.Steam Coil Replacement WorkDismantling and removal of existing steam coil piping and supports; fabrication, installation and welding of new steam coil assembly as per approved drawings; installation of supports and fittings; hydrostatic testing and rectification of defects; executed as per approved WPS, applicable codes and EIC instructions including manpower, tools, tackles and consumables.
18Tank Cooling Line & Foam Line WorksFabrication and erection of tank cooling and foam lines including flame cutting, bevelling, pipe bending, fit-up and welding of pipes of various sizes; execution at all elevations including ground, in-position and overhead; transportation of pipes, flanges and fittings from Owner’s storage to site; complete as per approved drawings, applicable specifications and EIC instructions including manpower, tools, tackles, gas cutting equipment and safety arrangements.Tank Cooling Line & Foam Line WorksFabrication and erection of tank cooling and foam lines including flame cutting, bevelling, pipe bending, fit-up and welding of pipes of various sizes; execution at all elevations including ground, in-position and overhead; transportation of pipes, flanges and fittings from Owner’s storage to site; complete as per approved drawings, applicable specifications and EIC instructions including manpower, tools, tackles, gas cutting equipment and safety arrangements.
19Steel Scaffolding WorksProviding, erecting, maintaining and dismantling rigid and properly secured steel scaffolding with working platforms at required locations and elevations, including near equipment, structures ; as per EIC instructions and applicable safety standards including supply of materials, manpower, tools, tackles and safety accessories.Steel Scaffolding WorksProviding, erecting, maintaining and dismantling rigid and properly secured steel scaffolding with working platforms at required locations and elevations, including near equipment, structures ; as per EIC instructions and applicable safety standards including supply of materials, manpower, tools, tackles and safety accessories.
20Fire / Cooling Water System – Deplugging of SprinklersDeplugging of sprinkler nozzles of tank cooling ring system including removal of choked sprinkler heads, installation of new heads/nozzles where required, bending, alignment and proper fixing to ensure correct spray pattern; execution at all elevations including tank roof, shell and cooling rings; as per site safety norms and EIC instructions including provision of manpower, tools, tackles, scaffolding/lifting arrangements and safety equipment; payment on actual inch-meter basis per tank.Fire / Cooling Water System – Deplugging of SprinklersDeplugging of sprinkler nozzles of tank cooling ring system including removal of choked sprinkler heads, installation of new heads/nozzles where required, bending, alignment and proper fixing to ensure correct spray pattern; execution at all elevations including tank roof, shell and cooling rings; as per site safety norms and EIC instructions including provision of manpower, tools, tackles, scaffolding/lifting arrangements and safety equipment; payment on actual inch-meter basis per tank.
21Hydrostatic / Pneumatic Testing WorksCarrying out hydrostatic testing of piping/tubes and pneumatic testing of reinforcement pads at specified pressure as per approved procedures; providing test pumps, gauges and required accessories; attending and rectifying leakages including re-testing; offering system for inspection and clearance; safe depressurizing after completion; executed in compliance with applicable safety norms and EIC instructions including manpower, tools and tackles.Hydrostatic / Pneumatic Testing WorksCarrying out hydrostatic testing of piping/tubes and pneumatic testing of reinforcement pads at specified pressure as per approved procedures; providing test pumps, gauges and required accessories; attending and rectifying leakages including re-testing; offering system for inspection and clearance; safe depressurizing after completion; executed in compliance with applicable safety norms and EIC instructions including manpower, tools and tackles.
22Floating roof rim seal repair/replacementRepair of Primary & Secondary Seal For Floating Roof tanks at site including shifting of materials from owner's shop to site of errection , opening of tank manholes , dismantling of damaged seals , taking necessary measurements ,accesment of required materials , removal & shifting of damaged seal materials , hardwares to earmarked locations, erections of new seal materials , cleaning & removal of unwanted materials from inside of tank , box up of manholes etc(Weather protection sheets, curtains, nuts, bolts, and fasteners will be provided by NRL as free-issue items)Floating roof rim seal repair/replacementRepair of Primary & Secondary Seal For Floating Roof tanks at site including shifting of materials from owner's shop to site of errection , opening of tank manholes , dismantling of damaged seals , taking necessary measurements ,accesment of required materials , removal & shifting of damaged seal materials , hardwares to earmarked locations, erections of new seal materials , cleaning & removal of unwanted materials from inside of tank , box up of manholes etc(Weather protection sheets, curtains, nuts, bolts, and fasteners will be provided by NRL as free-issue items)
23Piping work-Process related (Inside tank dyke)Fabrication and erection of process pipelines inside tank Dyke area including transportation of free-issue materials from Owner’s storage to site; cutting, bevelling, fit-up, welding and alignment at all elevations; provision and installation of required supports; removal and disposal/return of unused materials to designated location; executed as per approved drawings, applicable codes and EIC instructions including provision of manpower, consumables, tools, tackles, equipment and lifting arrangementsPiping work-Process related (Inside tank dyke)Fabrication and erection of process pipelines inside tank Dyke area including transportation of free-issue materials from Owner’s storage to site; cutting, bevelling, fit-up, welding and alignment at all elevations; provision and installation of required supports; removal and disposal/return of unused materials to designated location; executed as per approved drawings, applicable codes and EIC instructions including provision of manpower, consumables, tools, tackles, equipment and lifting arrangements
24Thickness gaugingThickness gauging
25Tank floor plate inspection − MFL/ LFET/ SLOFEC WFMPT/ VBT (for other activities likewise)Tank floor plate inspection − MFL/ LFET/ SLOFEC WFMPT/ VBT (for other activities likewise)
26Copper Grit/shot blasting on steel surfaces on location like internal of intermediate storage tanks, , steel structures and other flat surfaces to S.A. 2-1/2 sweedish specifications in position at all heights and location excluding cost of scaffolding with all tools and plants,consumables, labour etc, complete in all respect as directed by Engineer-in-charge. Air in the scope of contractor (contractor will have to make is own arrangement for compressor with fuel,operator etc. for arranging required air for blasting.All other material and equipment like Hopper,air filter,blasting hose,air hose,copper grit,PPE etc will be under contractor scope of supply )Copper Grit/shot blasting on steel surfaces on location like internal of intermediate storage tanks, , steel structures and other flat surfaces to S.A. 2-1/2 sweedish specifications in position at all heights and location excluding cost of scaffolding with all tools and plants,consumables, labour etc, complete in all respect as directed by Engineer-in-charge. Air in the scope of contractor (contractor will have to make is own arrangement for compressor with fuel,operator etc. for arranging required air for blasting.All other material and equipment like Hopper,air filter,blasting hose,air hose,copper grit,PPE etc will be under contractor scope of supply )
27Supply and application of approved brand of paints with Airless spray method including all tools and tackles, consumables, personal protective equipments for safe work, supervision, etc. to complete the work in all respects as per NRL painting manual and direction of Inspection deptt and Engineer in Charge Zinc Ethyle Silicate Primer (P1) One coat @ 70 micron DFT.Air in the scope of contractor (contractor will have to make is own arrangement for compressor with fuel,operator etc. for arranging required air for spray painting.Supply and application of approved brand of paints with Airless spray method including all tools and tackles, consumables, personal protective equipments for safe work, supervision, etc. to complete the work in all respects as per NRL painting manual and direction of Inspection deptt and Engineer in Charge Zinc Ethyle Silicate Primer (P1) One coat @ 70 micron DFT.Air in the scope of contractor (contractor will have to make is own arrangement for compressor with fuel,operator etc. for arranging required air for spray painting.
28Supply and application of approved brand of paints with Airless spray method including all tools and tackles, consumables, personal protective equipments for safe work, supervision, etc. to complete the work in all respects as per NRL painting manual and direction of Inspection deptt and Engineer in Charge Tank Liner (L1) Two coat @ 125 micron per coat.Air in the scope of contractor (contractor will have to make is own arrangement for compressor with fuel,operator etc. for arranging required air for spray painting.Supply and application of approved brand of paints with Airless spray method including all tools and tackles, consumables, personal protective equipments for safe work, supervision, etc. to complete the work in all respects as per NRL painting manual and direction of Inspection deptt and Engineer in Charge Tank Liner (L1) Two coat @ 125 micron per coat.Air in the scope of contractor (contractor will have to make is own arrangement for compressor with fuel,operator etc. for arranging required air for spray painting.
29Providing and fixing box scaffolding system up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. as per directions and approval of Engineer-in- charge .The volume of the scaffolding shall be measured for payment purpose . The payment will be made once irrespective of duration of scaffolding.Providing and fixing box scaffolding system up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. as per directions and approval of Engineer-in- charge .The volume of the scaffolding shall be measured for payment purpose . The payment will be made once irrespective of duration of scaffolding.
30Mobilization and Demobilization of all the required equipment, tool & tackles, manpower etc to/from the site, as per Scope of of the tender document for \\" Oil Recovery from Tank Bottom Sludge and residual Sludge Removal and Cleaning Services\\" and \\"Tank Inspection\\"Mobilization and Demobilization of all the required equipment, tool & tackles, manpower etc to/from the site, as per Scope of of the tender document for \\" Oil Recovery from Tank Bottom Sludge and residual Sludge Removal and Cleaning Services\\" and \\"Tank Inspection\\"

AI Tender Summary

OUR REF NO 56268276
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 16-07-2026
Authority
Authority Name Numaligarh Refinery Limited
Work Description Bids Are invited for Repair And Overhauling Service - Integrated Service Contract For Cleaning Inspection Repair Maintenance Of Two Nos Of Tanks; Integrated Service Contract For Cleaning Inspection Repair Maintenance Of Two Nos Of Tanks; Yes; Buyer Premises - Cleaning Of Tank Sludge As Per Scope After Handover Of The Tank At Site. , Flange 2To3-150#: Opening Or Box Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost. , Flange 4 To 8-150# : Opening Or Box Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost. , Flange 10 To 14-150# : Opening Or Box Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost. , Flange Above 20 Upto 40-150 # : Opening Or Box Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost. , Flange Above 8To10-300#To600#,Above10to12-300# : Opening Or Boxing Up Of Flanges With New Gasket; Gasket Replacement After Cleaning Of Gasket Faces < Cutting Of Gasket From Sheets Wherever Required >; Inserting Or Removal Of Spectacle Blind/ Tail Blind Wherever Necessary To Isolate Piping;Tank Or Any Other Equipment, As Required; Including Supply Of Tools; Tackles And Manpower Necessary To Complete The Job Up To The Satisfaction Of Engineer In-Charge. If Hot Bolting Is Required It Is To Be Done Without Any Extra Cost , Tank – Dismantling And Erection Of Valvesdismantling And Removal Of Valves/Relief Valves Of Any Size From Tank Piping Including Disconnection Of Flanges, Supports & Fittings; Shifting To Workshop/Warehouse; Loading, Unloading & Transportation; Coordination For Servicing/Repair; Collection And Transportation Of Serviced/Replacement Valves From Workshop/Warehouse To Site; Positioning, Alignment And Erection; Fitment & Tightening Of Flanged Joints With Gaskets/Fasteners; Installation/Adjustment Of Supports; Restoration Of Disturbed Piping/Structures; Cleaning Of Site; Including Provision Of Manpower, Supervision, Tools & Tackles And Execution As Per Eic Instructions. , Tank – Dismantling And Erection Of Relief Valves (Pvrv/Erv)Dismantling And Removal Of Valves/Relief Valves Of Any Size From Tank Piping Including Disconnection Of Flanges, Supports & Fittings; Shifting To Workshop/Warehouse; Loading, Unloading & Transportation; Coordination For Servicing/Repair; Collection And Transportation Of Serviced/Replacement Valves From Workshop/Warehouse To Site; Positioning, Alignment And Erection; Fitment & Tightening Of Flanged Joints With Gaskets/Fasteners; Installation/Adjustment Of Supports; Restoration Of Disturbed Piping/Structures; Cleaning Of Site; Including Provision Of Manpower, Supervision, Tools & Tackles And Execution As Per Eic Instructions. , Tank Plate Repair (Shell, Bottom, Annular, Roof)Removal Of Damaged Shell, Bottom, Annular And Roof Plates By Gouging/Cutting Including Edge Preparation; Cutting, Bending And Grinding Of Carbon Steel Plates (Up To 16 Mm Thick); Handling, Shifting And Transportation From Storage To Site; Fit-Up, Installation And Welding Of New Plates In Accordance With Approved Wps And Relevant Standards Including Necessary Assistance For Testing; Complete With Manpower, Supervision, Tools & Tackles As Per Eic Instructions. , Tank Plate Metal Build-Up / Pitting Repairrestoration Of Corroded And Pitted Tank Plates By Weld Overlay/Metal Build-Up In Identified Areas; Surface Grinding, Dressing And Contour Correction After Welding; Providing Necessary Support During Inspection And Testing; Executed In Accordance With Approved Wps And Eic Instructions Including Deployment Of Manpower, Supervision, Tools, Tackles And Consumables. , Surface Preparation For Inspectionbuffing And Grinding Of Internal Tank Plates To Achieve Required Surface Finish Strictly For Inspection Purposes; Scope Limited To Inspection-Related Surface Preparation Only; Including Manpower, Supervision, Tools & Tackles As Per Eic Instructions. , Patch Plate Repair Works-Shell, Roof, Bottom And Annular Platesrepair Of Localized Pitted Or Reduced Thickness Areas Of Existing Tank Plates By Welding Patch Plates As Per The Instruction Of Eic, Including Cutting, Surface Preparation, Fit-Up, Welding And Finishing As Per Approved Wps And Eic Instructions Including Manpower, Supervision, Tools, Tackles And Consumables. , Repair Of Structural Work-Structural Member, Staircase, Handrail, Rolling Ladder,Platformrepair/Replacement Of Structural Members, Staircases, Handrails, Rolling Ladders And Platforms Including Cutting And Removal Of Damaged Portions, Fabrication, Fit-Up, Alignment, Welding/Bolting, Fixing Of Supports And Fasteners, And Restoration To Serviceable Condition As Per Applicable Codes And Eic Instructions Including Manpower, Tools, Tackles And Consumables. , Replacement Of Wind Girderremoval Of Existing Wind Girders At All Elevations By Gas/Cold Cutting/Grinding Including Associated Fittings And Supports; Shifting Of New Materials To Site With Crane/Handling Assistance; Fabrication And Erection Of New Wind Girders As Per Approved Drawings, Applicable Codes And Standard Engineering Practices/Eic Instruction Including Suplly Of Manpower, Supervision, Tools, Tackles, Consumables. , Roof Drain Replacement Workremoval And Dismantling Of Existing Roof Drain Piping, Spools, Supports And Swivel/Pivot Joints; Transportation Of New Materials To Site With Required Crane/Handling Assistance; Fabrication, Fit-Up And Installation Of New Roof Drain Piping Assembly Including Supports And Swivel/Pivot Joints; Hydrostatic Testing Of Complete Roof Drain System; Complete In All Respects As Per Approved Drawings And Eic Instructions Including Manpower, Supervision, Tools, Tackles And Consumables. , Nozzle Replacement (Roof, Foam Nozzle)Replacement Of Tank Roof And Foam Nozzles Including Marking As Per Approved Drawings; Removal Of Existing Nozzles And Reinforcement Pads; Edge Preparation; Fabrication, Alignment, Fit-Up And Welding Of New Nozzle Assemblies; Weld Finishing; Reconnection Of Associated Piping And Fittings; Restoration Of Supports; Executed As Per Approved Wps, Applicable Codes And Eic Instructions Including Manpower, Tools, Tackles And Consumables. , Steam Coil Replacement Workdismantling And Removal Of Existing Steam Coil Piping And Supports; Fabrication, Installation And Welding Of New Steam Coil Assembly As Per Approved Drawings; Installation Of Supports And Fittings; Hydrostatic Testing And Rectification Of Defects; Executed As Per Approved Wps, Applicable Codes And Eic Instructions Including Manpower, Tools, Tackles And Consumables. , Tank Cooling Line & Foam Line Worksfabrication And Erection Of Tank Cooling And Foam Lines Including Flame Cutting, Bevelling, Pipe Bending, Fit-Up And Welding Of Pipes Of Various Sizes; Execution At All Elevations Including Ground, In-Position And Overhead; Transportation Of Pipes, Flanges And Fittings From Owners Storage To Site; Complete As Per Approved Drawings, Applicable Specifications And Eic Instructions Including Manpower, Tools, Tackles, Gas Cutting Equipment And Safety Arrangements. , Steel Scaffolding Worksproviding, Erecting, Maintaining And Dismantling Rigid And Properly Secured Steel Scaffolding With Working Platforms At Required Locations And Elevations, Including Near Equipment, Structures ; As Per Eic Instructions And Applicable Safety Standards Including Supply Of Materials, Manpower, Tools, Tackles And Safety Accessories. , Fire / Cooling Water System – Deplugging Of Sprinklersdeplugging Of Sprinkler Nozzles Of Tank Cooling Ring System Including Removal Of Choked Sprinkler Heads, Installation Of New Heads/Nozzles Where Required, Bending, Alignment And Proper Fixing To Ensure Correct Spray Pattern; Execution At All Elevations Including Tank Roof, Shell And Cooling Rings; As Per Site Safety Norms And Eic Instructions Including Provision Of Manpower, Tools, Tackles, Scaffolding/Lifting Arrangements And Safety Equipment; Payment On Actual Inch-Meter Basis Per Tank. , Hydrostatic / Pneumatic Testing Workscarrying Out Hydrostatic Testing Of Piping/Tubes And Pneumatic Testing Of Reinforcement Pads At Specified Pressure As Per Approved Procedures; Providing Test Pumps, Gauges And Required Accessories; Attending And Rectifying Leakages Including Re-Testing; Offering System For Inspection And Clearance; Safe Depressurizing After Completion; Executed In Compliance With Applicable Safety Norms And Eic Instructions Including Manpower, Tools And Tackles. , Floating Roof Rim Seal Repair/Replacementrepair Of Primary & Secondary Seal For Floating Roof Tanks At Site Including Shifting Of Materials From Owners Shop To Site Of Errection , Opening Of Tank Manholes , Dismantling Of Damaged Seals , Taking Necessary Measurements ,Accesment Of Required Materials , Removal & Shifting Of Damaged Seal Materials , Hardwares To Earmarked Locations, Erections Of New Seal Materials , Cleaning & Removal Of Unwanted Materials From Inside Of Tank , Box Up Of Manholes Etc(Weather Protection Sheets, Curtains, Nuts, Bolts, And Fasteners Will Be Provided By Nrl As Free-Issue Items) , Piping Work-Process Related (Inside Tank Dyke)Fabrication And Erection Of Process Pipelines Inside Tank Dyke Area Including Transportation Of Free-Issue Materials From Owners Storage To Site; Cutting, Bevelling, Fit-Up, Welding And Alignment At All Elevations; Provision And Installation Of Required Supports; Removal And Disposal/Return Of Unused Materials To Designated Location; Executed As Per Approved Drawings, Applicable Codes And Eic Instructions Including Provision Of Manpower, Consumables, Tools, Tackles, Equipment And Lifting Arrangements , Thickness Gauging , Tank Floor Plate Inspection − Mfl/ Lfet/ Slofec Wfmpt/ Vbt (For Other Activities Likewise) , Copper Grit/Shot Blasting On Steel Surfaces On Location Like Internal Of Intermediate Storage Tanks, , Steel Structures And Other Flat Surfaces To S.A. 2-1/2 Sweedish Specifications In Position At All Heights And Location Excluding Cost Of Scaffolding With All Tools And Plants,Consumables, Labour Etc, Complete In All Respect As Directed By Engineer-In-Charge. Air In The Scope Of Contractor (Contractor Will Have To Make Is Own Arrangement For Compressor With Fuel,Operator Etc. For Arranging Required Air For Blasting.All Other Material And Equipment Like Hopper,Air Filter,Blasting Hose,Air Hose,Copper Grit,Ppe Etc Will Be Under Contractor Scope Of Supply ) , Supply And Application Of Approved Brand Of Paints With Airless Spray Method Including All Tools And Tackles, Consumables, Personal Protective Equipments For Safe Work, Supervision, Etc. To Complete The Work In All Respects As Per Nrl Painting Manual And Direction Of Inspection Deptt And Engineer In Charge Zinc Ethyle Silicate Primer (P1) One Coat @ 70 Micron Dft.Air In The Scope Of Contractor (Contractor Will Have To Make Is Own Arrangement For Compressor With Fuel,Operator Etc. For Arranging Required Air For Spray Painting. , Supply And Application Of Approved Brand Of Paints With Airless Spray Method Including All Tools And Tackles, Consumables, Personal Protective Equipments For Safe Work, Supervision, Etc. To Complete The Work In All Respects As Per Nrl Painting Manual And Direction Of Inspection Deptt And Engineer In Charge Tank Liner (L1) Two Coat @ 125 Micron Per Coat.Air In The Scope Of Contractor (Contractor Will Have To Make Is Own Arrangement For Compressor With Fuel,Operator Etc. For Arranging Required Air For Spray Painting. , Providing And Fixing Box Scaffolding System Up To Seven Story Height Made With 40 Mm Dia M.S. Tube 1.5 M Centre To Centre, Horizontal & Vertical Tubes Joining With Cup & Lock System With M.S. Tubes, M.S. Tube Challies, M.S. Cl S And M.S. Staircase System In The Scaffolding For Working Platform Etc. And Maintaining It In A Serviceable Condition For The Required Duration As Approved And Removing It There After .The Scaffolding System Shall Be Stiffened With Bracings, Runners, Connection With The Building Etc Wherever Required For Inspection Of Work At Required Locations With Essential Safety Features For The Workmen Etc. As Per Directions And Approval Of Engineer-In- Charge .The Volume Of The Scaffolding Shall Be Measured For Payment Purpose . The Payment Will Be Made Once Irrespective Of Duration Of Scaffolding. , Mobilization And Demobilization Of All The Required Equipment, Tool & Tackles, Manpower Etc To/From The Site, As Per Scope Of Of The Tender Document For Oil Recovery From Tank Bottom Sludge And Residual Sludge Removal And Cleaning Services And Tank Inspection
Basic Detail
Tender No GEM/2026/B/7736315
Bidding Type Tender
Location
City Golaghat
State Assam
Key Dates
Publish Date 02 Jul 2026
Submission Date 16 Jul 2026
Open Date 16 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 3.77 Lakhs
Exemption Not Available
Document List
f6bc5dca-d25a-455d-9a5e-965e0f9d4a40.pdf
1782967581.xlsx
1782983484.xlsx
1782983500.pdf
1782983505.pdf
1782983510.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 02, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Jul 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
pdf

f6bc5dca-d25a-455d-9a5e-965e0f9d4a40.pdf

xlsx

1782967581.xlsx

xlsx

1782983484.xlsx

pdf

1782983500.pdf

pdf

1782983505.pdf

pdf

1782983510.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders