Supply Of Design, supply, installation testing and commissioning of Advancer Chemistry Cell (ACC) based Battery Energy Storage System (BESS) of Capacity 213 kWH assuming approx., 80KW for 2 hrs backup, consisting of major equipment such as lithium ir
Tender Overview
Project Description
Supply Of design, supply, installation testing and commissioning of advancer chemistry cell (acc) based battery energy storage system (bess) of capacity 213 kwh assuming approx., 80kw for 2 hrs backup, consisting of major equipment such as lithium iron phosphate lifepo4 battery, battery management system (bms), power electronic converter system & equipment (pecs) / power conditioning system (pcs) inverter, ventilation, wiring, connectors, protective devices, grounding, junction boxes and enclosures, instrumentation, battery housing cabinet, and all other items, accessories, associated work for a fully functional of the unit, including gst charges @18% proposed bess is for replacement of 100 kva diesel generator, the cost shall include all the controller required for synchronized operation of the battery storage system as per spec. warranty shall be of 10 years and shall cover repairs, replacements, comprehensive maintenance of all equipment (all parts/component) as per prescribed / oem schedule inclusive of all spares, material and labour cost as per spec.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender