Tender For Replacement Of Existing Fire Fighting Pipelines At Berth No. 11
Tender Value
1.86 Crore
Estimated cost
Bid Submission
23 Jul 2026
0 days left
EMD
4.41 Lakhs
Bank guarantee accepted
Document Fee
1120
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Dakshina Kannada → Karnataka
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Replacement Of Existing Fire Fighting Pipelines At Berth No. 11
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling of existing corroded 500NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 |
| 2 | Dismantling of existing corroded 350NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 |
| 3 | Dismantling of existing corroded 250NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 |
| 4 | Dismantling of existing corroded 200NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 |
| 5 | Dismantling of existing corroded 150NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 |
| 6 | Dismantling of existing corroded 100NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 |
| 7 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 500NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally. Note:1) Pipeline shall be provided with Flange Joints for every six meters length. 2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet). Media of flow Sea water. |
| 8 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 350NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally. Note:1) Pipeline shall be provided with Flange Joints for every six meters length. 2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).Media of flow Sea water. |
| 9 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 250NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally. Note:1) Pipeline shall be provided with Flange Joints for every six meters length. 2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).Media of flow Sea water. |
| 10 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 200NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally. Note:1) Pipeline shall be provided with Flange Joints for every six meters length. 2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).Media of flow Sea water. |
| 11 | Supply, Fabrication, Erection, and Testing of stainless steel pipe of 100NB(Tower Curtain) Sch. 40 of AISI – 316 quality for carrying foam compound liquid/sea water including supply of pipes, specials, flanges, Dummy flanges, Gaskets, stainless steel Bolts & Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures & of suitable class, complete as follows externally. |
| 12 | Supply, Fabrication, Erection, and Testing of ERW GI steel pipe of 150NB confirming to BIS:3589 or BIS:1239 (Heavy class) for carrying sea water including supply of pipes, specials, Bends, Tees, Flanges, Dummy flanges, Gaskets, Stainless steels bolts & Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures clamps etc including double galvanized and painting 3 coats of approved colour (one coat of zinc –rich fire red primer & two coats of epoxy paint) externally complete as follows and two coasts of fire red epoxy paint for galvanized pipes |
| 13 | Supply, Installation and testing of cast steel Butterfly valve of 500NB conforming to BS:5155 with Flange, Bolts & Nuts, Washers, Gaskets, all accessories complete in all respect. As per the technical specification attached: (As per ANNEXURE)Note: Media of flow Sea water. Gear operated wafer type butterfly valve. |
| 14 | Supply, Installation and testing of cast steel Butterfly valve of 350NB conforming to BS:5155 with Bolts & Nuts, Washers, Gaskets, all accessories complete in all respect. As per the technical specification attached: (As per ANNEXURE)Note: Media of flow Sea water. Gear operated wafer type butterfly valve. |
| 15 | Supply, Installation and testing of cast steel Butterfly valve of 250NB conforming to BS:5155 with Bolts & Nuts, Washers, Gaskets, all accessories complete in all respect. As per the technical specification attached: (As per ANNEXURE)Note: Media of flow Sea water. Gear operated wafer type butterfly valve. |
| 16 | Supply, Installation and testing of cast steel Butterfly valve of 200NB conforming to BS:5155 with Bolts & Nuts, Washers, Gaskets, all accessories complete in all respect. As per the technical specification attached: (As per ANNEXURE)Note: Media of flow Sea water. Gear operated wafer type butterfly valve. |
| 17 | Supply, Installation and testing of cast steel Butterfly valve of 150NB conforming to BS:5155 with Bolts & Nuts, Washers, Gaskets, all accessories complete in all respect. As per the technical specification attached: (As per ANNEXURE)Note: Media of flow Sea water. Gear operated wafer type butterfly valve |
| 18 | Supply, Installation and testing of cast steel Butterfly valve of 100NB conforming to BS:5155 includes stainless steel Flange, Bolts & Nuts, Washers, Gaskets, all accessories complete in all respect. As per the technical specification attached: (As per ANNEXURE)Note: Media of flow Sea water. Gear operated wafer type butterfly valve |
| 19 | Supply, Installation and testing of Motorized cast steel Butterfly valve 250NB conforming to BS 5155 with bolts & nuts washers, gaskets, all accessories complete in all respect. As per the technical specification attached: (As per ANNEXURE)Note: Media of flow Sea water. |
| 20 | Supply, Installation and testing of Motorized cast steel Butterfly valve 200NB conforming to BS 5155 with bolts & nuts washers, gaskets, all accessories complete in all respect. As per the technical specification attached: (ANNEXURE)Note: Media of flow Sea water. |
| 21 | Supply, Installation and testing of Motorized cast steel Butterfly valve 150NB conforming to BS 5155 with bolts & nuts washers, gaskets, all accessories complete in all respect. As per the technical specification attached: (ASANNEXURE)Note: Media of flow Sea water. |
| 22 | Supply, Installation and testing of Motorized cast steel Butterfly valve 100NB conforming to BS 5155 with bolts & nuts washers, gaskets, all accessories complete in all respect. As per the technical specification attached: (ANNEXURE)Note: Media of flow Sea water. |
| 23 | Fabrication & Supply of Vertical Pole from ISA 75 x 75 x 8 mm thickness of length 1.50mtr welded with bottom plate of 150 mm x 150 mm x 12 mm thick. 4 Nos. of holes to be drilled on bottom plate for fixing of M12x100 mm GI wedge anchor bolts and 4 Nos. 10 mm dia. Holes to be drilled on Vertical Pole for fixing of Hose Box and 2 Nos. 10 mm dia. Holes to be drilled on Vertical Pole for fixing Manual Call Point (MCP) with suitable fittings. After Fabrication of the vertical Pole welded with bottom plate shall be hot dip galvanized, having a uniform average thickness of 86 microns as per BSEN-1461/BS ISO1461/IS/2629-1966.Before fixing. Note:Manufacturers’ certificate for ISA & Plate shall be submitted along with the supply. |
| 24 | Design, supply, erection and testing of a Fixed Water Monitors on 63mm size, 2700 lpm capacity having nozzle bore of 32mm, min vertical jet 25m minimum, horizontal jet 50m(min) and rotation 3600 with orifice plate and isolation Buttery Valve SS – 316 of 100mm size complete in all respect. |
| 25 | Supply installation of International Shore Connection with isolation valve, pipeline of 150 dia complete in all respect. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 02, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 23, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodayJul 24, 2026
Bid Opening Date
Technical bids will be opened and evaluated.