Drinking Water Supply and Sanitation Government Departments Closing in 3 days TDR #56258549

Tender For Permanent Restoration Of Works Damages Occurred During The Month Of August & Septemebr 2025 W.R.T. Various Water Supply Schemes Of Sub Division Kandi-Ii (Nagrota, Jhajjar Kotli, Dansal, Dhamuni Jagir, Bamyal & Pangali) Part-11. Permanent R

Issued by Government Departments · Jammu, Jammu and Kashmir
Tender Value
55.40 Lakhs
Estimated cost
Bid Submission
10 Jul 2026
3 days left
EMD
1.10 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jammu → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Permanent Restoration Of Works Damages Occurred During The Month Of August & Septemebr 2025 W.R.T. Various Water Supply Schemes Of Sub Division Kandi-Ii (Nagrota, Jhajjar Kotli, Dansal, Dhamuni Jagir, Bamyal & Pangali) Part-11. Permanent Restoration For Laying Of Wire Crates At Intake Well At Site Under Water Supply Scheme Narain Nadore2. Construction Of 20,000 Glns Gsr Under Water Supply Scheme Narain Nadore3. Providing Protection Work With Wire Crates Under Water Supply Scheme Kattal Battal.4. Reconstruction Of Compound Wall Around The Civil Structures Under Water Supply Scheme Kattal Battal

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 04-Jul-2026 clarification for time of completion Other 10-Jul-2026

BOQ

Name of Work:- Permanent restoration of works damages occurred during the month of August & Septemebr 2025 w.r.t. various water supply schemes of Sub Division Kandi-II (Nagrota, Jhajjar Kotli, Dansal, Dhamuni Jagir, Bamyal & Pangali) Part-11. Permanent restoration for laying of wire crates at Intake well at site under WSS Narain Nadore2. Construction of 20,000 glns GSR under WSS Narain Nadore3. Providing protection work with wire crates under WSS Kattal Battal.4. Reconstruction of compound wall around the civil structures under WSS Kattal Battal
Sl. No. Item Description
1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kind of soil
2Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock
3Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5m, as directed by Engineer-in-Charge.
4Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil:
5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement:4 coarse sand:8 graded stone aggregate 40 mm nominal size)
6Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1cement:3coarse sand:6graded stone aggregate 40mm nominal size)
7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1cement: 3 coarse sand:6 graded stone aggregate 20mm nominal size)
8Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1cement:1½ coarse sand:3 graded stone aggregate 20mm nominal size)
9Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 1:1½:3(1cement: 1½ coarses and: 3 graded stone aggregate 20 mm nominal size)
10Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
11Brick work with common burnt clay (non-modular )bricks of class designation7.5in foundation and plinth including curing in : Cement mortar1:6(1cement:6coarsesand)
12Extra for brick work with common burnt clay bricks/ cement concrete bricks in superstructure above plinth level upto floor five level
13Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
14Centering and shuttering including strutting, propping etc. and removal of form work for: Chimney and shafts
15Centering and shuttering including strutting, propping etc. and removal of form work for: Extra for Chimney and shafts
16Centering and shuttering including strutting, propping etc.and removal of form for: Lintel, beams, plinth beams,girders, bressumers and cantilevers.
17Extra for shuttering in circular works (20%)
18Centering and shuttering including strutting, propping etc.and removal of form for: Suspended floors,roofs, landings, balconies and access plat forms.
19Centering and shuttering including strutting, propping etc. and removal of form work for: Arches ,domes, vaults upto 6m span
20Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, pillars, piers, abutments, posts and struts.
21Hand-packing stones in wire-crates; excluding cost o fcrates and stones
22Providing and fixing of GP Sheet Plain 1mm thick for joint of life
23Providing and fixing S.C.I. S & S 100 mm dia bend
24Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete. 50 mm thick with 20mm nominal size stone aggregate.
25Cement plaster1:3 (1cement:3coarse sand) finished with a floating coat of neat cement. 12mm cement plaster
26Extra for plasteringon circular worknotexceeding6minradius: Inonecoat
2715mm Cement plaster on the rough side of single or half brick wall of mix: 1:4(1cement:4finesand)
28Providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. (1 kg of water proofing material in 50 kg of cement)
29Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. Ingratings, frames, guardbar, ladder, railings, brackets, gate sand similar works.
30Dumping stone excluding cost of stones. In Horizontal on level
31Supply of stone boulder (nallah) nominal size 225 mm
32Filling available excavated earth (excluding rock) intrenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m.
33Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @3.84kg/10sqm)
34Providing supply and carriage up to site of work of knitted wire crates 6.00 x1.50 x1.50 mtr
35Carriage of sand/Stone below 40mm from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 25 km by MT & 300Mtr By H/load
36Carriage of sand from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 12 km by MT & 500Mtr By H/load
37Carriage of stone aggregate (Crushed) 20 mm nominal size from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 12 km by MT & 500Mtr by H/load
38Carriage of stone aggregate (Crushed) 40 mm nominal size and above from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 25 km by MT & 300Mtr by H/load
39Carriage of stone boulder from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 10km by MT & 300Mtr by H/load
40Carriage of stone boulder from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 5km
41Carriage of Bricks from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 35 km by MT & 300Mtr by H/load Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56258549
AUTHORITY Government Departments
TENDER VALUE 55.40 Lakhs
LAST DATE 10-07-2026
Authority
Authority Name Public Health Engineering Department
Work Description Tender for Permanent Restoration Of Works Damages Occurred During The Month Of August & Septemebr 2025 W.R.T. Various Water Supply Schemes Of Sub Division Kandi-Ii (Nagrota, Jhajjar Kotli, Dansal, Dhamuni Jagir, Bamyal & Pangali) Part-11. Permanent Restoration For Laying Of Wire Crates At Intake Well At Site Under Water Supply Scheme Narain Nadore2. Construction Of 20,000 Glns Gsr Under Water Supply Scheme Narain Nadore3. Providing Protection Work With Wire Crates Under Water Supply Scheme Kattal Battal.4. Reconstruction Of Compound Wall Around The Civil Structures Under Water Supply Scheme Kattal Battal
Basic Detail
Tender No e-NIT No. 12 of 2026-27
Bidding Type Tender
Location
City Jammu
State Jammu and Kashmir
Key Dates
Publish Date 04 Jul 2026
Submission Date 10 Jul 2026
Open Date 01 Jan 0001
Finance
Tender Value 55.40 Lakhs
Tender Fee 1000
EMD 1.10 Lakhs
Exemption Not Available
Document List
6dc79060-5c79-4c37-ba4b-bc53e8e8fdfe.html
BOQ_1017191.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 04, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 10, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 3 days
Jul 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

6dc79060-5c79-4c37-ba4b-bc53e8e8fdfe.html

xls

BOQ_1017191.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders