Tender For Repair / Maintenance Of Ci/Gi/Di Pipe Line For Domestic Area At Af Stn Nal Under Ge (Af) Nal
Tender Value
30 Lakhs
Estimated cost
Bid Submission
22 Jul 2026
1 days left
EMD
60000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bikaner → Rajasthan
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair / Maintenance Of Ci/Gi/Di Pipe Line For Domestic Area At Af Stn Nal Under Ge (Af) Nal
BOQ
| Sl. No. | Item Description |
| 1 | Taking up / down 150mm bore GI water mains and connections/fittings of any type from trenches/ walls / floors (of any location) for replacement / re-use in old / new location/diversion by burning out/removing of lead joint/tyton joint/rubber gasket joint as directed by the Engineer-in-Charge.Note: Necessary earthwork, if any , will be measured and paid separately under relevant items |
| 2 | Taking up / down 100mm bore GI water mains and connections/fittings of any type from trenches/ walls / floors (of any location) for replacement / re-use in old / new location/diversion by burning out/removing of lead joint/tyton joint/rubber gasket joint as directed by the Engineer-in-Charge.Note: Necessary earthwork, if any , will be measured and paid separately under relevant items |
| 3 | Taking up / down 80mm bore GI water mains and connections/fittings of any type from trenches/ walls / floors (of any location) for replacement / re-use in old / new location/diversion by burning out/removing of lead joint/tyton joint/rubber gasket joint as directed by the Engineer-in-Charge.Note: Necessary earthwork, if any , will be measured and paid separately under relevant items |
| 4 | Taking up / down 50mm bore GI water mains and connections/fittings of any type from trenches/ walls / floors (of any location) for replacement / re-use in old / new location/diversion by burning out/removing of lead joint/tyton joint/rubber gasket joint as directed by the Engineer-in-Charge.Note: Necessary earthwork, if any , will be measured and paid separately under relevant items |
| 5 | Taking up / down 40mm bore GI water mains and connections/fittings of any type from trenches/ walls / floors (of any location) for replacement / re-use in old / new location/diversion by burning out/removing of lead joint/tyton joint/rubber gasket joint as directed by the Engineer-in-Charge.Note: Necessary earthwork, if any , will be measured and paid separately under relevant items |
| 6 | Taking up / down 25mm bore GI water mains and connections/fittings of any type from trenches/ walls / floors (of any location) for replacement / re-use in old / new location/diversion by burning out/removing of lead joint/tyton joint/rubber gasket joint as directed by the Engineer-in-Charge.Note: Necessary earthwork, if any , will be measured and paid separately under relevant items |
| 7 | Taking up / down 20mm bore GI water mains and connections/fittings of any type from trenches/ walls / floors (of any location) for replacement / re-use in old / new location/diversion by burning out/removing of lead joint/tyton joint/rubber gasket joint as directed by the Engineer-in-Charge.Note: Necessary earthwork, if any , will be measured and paid separately under relevant items |
| 8 | Laying only 150mm bore GI water mains after thoroughly cleaning, with new fittings fixed to wall/ceiling/floor or laid in trenches complete all as directed by Engineer-in-Charge. |
| 9 | Laying only 100mm bore GI water mains after thoroughly cleaning, with new fittings fixed to wall/ceiling/floor or laid in trenches complete all as directed by Engineer-in-Charge. |
| 10 | Laying only 80mm bore GI water mains after thoroughly cleaning, with new fittings fixed to wall/ceiling/floor or laid in trenches complete all as directed by Engineer-in-Charge. |
| 11 | Laying only 50mm bore GI water mains after thoroughly cleaning, with new fittings fixed to wall/ceiling/floor or laid in trenches complete all as directed by Engineer-in-Charge. |
| 12 | Laying only 40mm bore GI water mains after thoroughly cleaning, with new fittings fixed to wall/ceiling/floor or laid in trenches complete all as directed by Engineer-in-Charge. |
| 13 | Laying only 25mm bore GI water mains after thoroughly cleaning, with new fittings fixed to wall/ceiling/floor or laid in trenches complete all as directed by Engineer-in-Charge. |
| 14 | Laying only 20mm bore GI water mains after thoroughly cleaning, with new fittings fixed to wall/ceiling/floor or laid in trenches complete all as directed by Engineer-in-Charge. |
| 15 | Supply, laying and testing 150mm bore GI tubing, medium grade, with new fittings, fixed to walls, and ceilings or, laying in floor / trenches complete all as specified and directed.Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule. However, the cost of fittings is included in the unit rate of this item. |
| 16 | Supply, laying and testing 100mm bore GI tubing, medium grade, with new fittings, fixed to walls, and ceilings or, laying in floor / trenches complete all as specified and directed.Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule. However, the cost of fittings is included in the unit rate of this item. |
| 17 | Supply, laying and testing 80mm bore GI tubing, medium grade, with new fittings, fixed to walls, and ceilings or, laying in floor / trenches complete all as specified and directed.Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule. However, the cost of fittings is included in the unit rate of this item. |
| 18 | Supply, laying and testing 50mm bore GI tubing, medium grade, with new fittings, fixed to walls, and ceilings or, laying in floor / trenches complete all as specified and directed.Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule. However, the cost of fittings is included in the unit rate of this item. |
| 19 | Supply, laying and testing 40mm bore GI tubing, medium grade, with new fittings, fixed to walls, and ceilings or, laying in floor / trenches complete all as specified and directed.Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule. However, the cost of fittings is included in the unit rate of this item. |
| 20 | Supply, laying and testing 25mm bore GI tubing, medium grade, with new fittings, fixed to walls, and ceilings or, laying in floor / trenches complete all as specified and directed.Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule. However, the cost of fittings is included in the unit rate of this item. |
| 21 | Supply, laying and testing 20mm bore GI tubing, medium grade, with new fittings, fixed to walls, and ceilings or, laying in floor / trenches complete all as specified and directed.Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule. However, the cost of fittings is included in the unit rate of this item. |
| 22 | Excavation in trenches in soft / loose soil not exceeding 1.5 metre wide for foundation etc or for shafts, wells cesspits, manholes etc not exceeding 10 Sqm on plan and not exceeding 1.5 metre in depth and getting out as directed by the Engineer-in-Charge. |
| 23 | Returning, filling in, including spreading levelling, watering and well ramming in layers not exceeding 25 cm as directed by the Engineer-in-Charge. |
| 24 | Removing excavated material not exceeding 50 metre and deposited where directed at a level not exceeding 50 metre above the starting point in soil as directed by the Engineer-in-Charge. |
| 25 | Material and labour for cutting the existing CI/DI water mains for addn/altrn or for taking branch connections/insertion of new Tees, branches of 80 mm bore pipe complete all as directed by Engineer- in-charge |
| 26 | Material and labour for cutting the existing CI/DI water mains for addn/altrn or for taking branch connections/insertion of new Tees, branches of 100 mm bore pipe complete all as directed by Engineer- in-charge |
| 27 | Material and labour for cutting the existing CI/DI water mains for addn/altrn or for taking branch connections/insertion of new Tees, branches of 150 mm bore pipe complete all as directed by Engineer- in-charge |
| 28 | Supply and fixing in repair to CI Detachable D joints of CI/DI/GI pipe of size 250 mm bore including rubber rings, nuts & bolts complete all as specified and directed by Engineer-in-charge. Note: Excavation to be measured and paid under relevant item of this schedule |
| 29 | Supply and fixing in repair to CI Detachable D joints of CI/DI/GI pipe of size 200 mm bore including rubber rings, nuts & bolts complete all as specified and directed by Engineer-in-charge. Note: Excavation to be measured and paid under relavent item of this schedule |
| 30 | Supply and fixing in repair to CI Detachable D joints of CI/DI/GI pipe of size 150 mm bore including rubber rings, nuts & bolts complete all as specified and directed by Engineer-in-charge. Note: Excavation to be measured and paid under relavent item of this schedule |
| 31 | Supply and fixing in repair to CI Detachable D joints of CI/DI/GI pipe of size 100 mm bore including rubber rings, nuts & bolts complete all as specified and directed by Engineer-in-charge. Note: Excavation to be measured and paid under relevant item of this schedule |
| 32 | Supply and fixing in repair to CI Detachable D joints of CI/DI/GI pipe of size 80 mm bore including rubber rings, nuts & bolts complete all as specified and directed by Engineer-in-charge. Note: Excavation to be measured and paid under relevant item of this schedule |
| 33 | Supply and fixing in repair to CI Detachable D joints of CI/DI/GI pipe of size 40 mm to 50 mm bore including rubber rings, nuts & bolts complete all as specified and directed by Engineer-in-charge. Note: Excavation to be measured and paid under relevant item of this schedule |
| 34 | Supply and fixing in repair 50 mm bore Gun metal gate valve with iron wheel head, screwed both ends for iron pipes or for unions as directed by the Engineer-in-Charge. All as per IS : 778-84 Marked CL-1 Pressure tested 2.4 Mpa . |
| 35 | Supply and fixing in repair 40 mm bore Gun metal gate valve with iron wheel head, screwed both ends for iron pipes or for unions as directed by the Engineer-in-Charge. All as per IS : 778-84 Marked CL-1 Pressure tested 2.4 Mpa . |
| 36 | Supply and fixing in repair 25 mm bore Gun metal gate valve with iron wheel head, screwed both ends for iron pipes or for unions as directed by the Engineer-in-Charge. All as per IS : 778-84 Marked CL-1 Pressure tested 2.4 Mpa . |
| 37 | Supply and fixing in repair 20 mm bore Gun metal gate valve with iron wheel head, screwed both ends for iron pipes or for unions as directed by the Engineer-in-Charge. All as per IS : 778-84 Marked CL-1 Pressure tested 2.4 Mpa . |
| 38 | M&L for arresting water leakage from sluice valve of size 80mm dia, by refacing, regrinding of sluice valve, repacking stuffing box of sluice valve spindle incl repacking old check nuts with new one made out of MS/CI material with and incl replacing perished gland packing, rubber gasket, bolts and nuts complete all as specified and directed. |
| 39 | M&L for arresting water leakage from sluice valve of size 100mm dia, by refacing, regrinding of sluice valve, repacking stuffing box of sluice valve spindle incl repacking old check nuts with new one made out of MS/CI material with and incl replacing perished gland packing, rubber gasket, bolts and nuts complete all as specified and directed. |
| 40 | M&L for arresting water leakage from sluice valve of size 150mm dia, by refacing, regrinding of sluice valve, repacking stuffing box of sluice valve spindle including repacking old check nuts with new one made out of MS/CI material with and incl replacing perished gland packing, rubber gasket, bolts and nuts complete all as specified and directed. |
| 41 | Supply and fixing in repair 80 mm bore CI sluice valve of Class PN-1.6, long body type, heavy duty, ISI marked (IS 1538) flanged end with iron wheel and stainless steel spindle including rubber gasket joints, nuts, bolts etc including testing complete all as directed by the Engineer-in-Charge. |
| 42 | Supply and fixing in repair 100 mm bore CI sluice valve of Class PN-1.6, long body type, heavy duty, ISI marked (IS 1538) flanged end with iron wheel and stainless steel spindle including rubber gasket joints, nuts, bolts etc including testing complete all as directed by the Engineer-in-Charge. |
| 43 | Supply and fixing in repair 150 mm bore CI sluice valve of Class PN-1.6, long body type, heavy duty, ISI marked (IS 1538) flanged end with iron wheel and stainless steel spindle including rubber gasket joints, nuts, bolts etc including testing complete all as directed by the Engineer-in-Charge. |
| 44 | Supply and fixing in repair to Bib tap standard of PTMT of size 15mm any colour high pressure screwed for iron pipe and fixed. (Minimum weight 15mm-90gms/20mm- 125gms). complete all as specified and directed by Engineer-in-Charge. |
| 45 | Supply and fixing in repair to Bib tap standard of PTMT of size 20mm any colour high pressure screwed for iron pipe and fixed. (Minimum weight 15mm-90gms/20mm- 125gms). complete all as specified and directed by Engineer-in-Charge. |
| 46 | S & F in replacement of cast iron non return valve 150 mm dia both side flanged (ISI Marked) confirming to IS 5312 (Pt-I) including nut & bolts complete all as specified and directed. |
| 47 | S & F in replacement of cast iron non return valve 100 mm dia both side flanged (ISI Marked) confirming to IS 5312 (Pt-I) including nut & bolts complete all as specified and directed. |
| 48 | S & F in replacement of cast iron non return valve 80 mm dia both side flanged (ISI Marked) confirming to IS 5312 (Pt-I) including nut & bolts complete all as specified and directed. |
| 49 | Supply & Fix Rubber gasket joint 100 mm dia with nuts & bolts complete all as specified and directed. |
| 50 | Supply & Fix Rubber gasket joint 150 mm dia with nuts & bolts complete all as specified and directed. |
| 51 | Supply & Fix Rubber gasket joint 200 mm dia with nuts & bolts complete all as specified and directed. |
| 52 | Supply & Fix Rubber gasket joint 250 mm dia with nuts & bolts complete all as specified and directed. |
| 53 | M&L for Run lead joint including Spun Yarn and caulking for CI/GI/DI pipe 250 mm dia complete all as specified. |
| 54 | M & L for Run lead joint Spun Yarn and caulking for CI/GI/DI pipe for CI pipe 200 mm dia complete all as specified. |
| 55 | M&L for Run lead joint Spun Yarn and caulking for CI/GI/DI pipe for CI pipe 150 mm dia complete all as specified. |
| 56 | M & L for Run lead joint Spun Yarn and caulking for CI/GI/DI pipe for CI pipe 100 mm dia complete all as specified. |
| 57 | M & L for Run lead joint Spun Yarn and caulking for CI/GI/DI pipe for CI pipe 80 mm dia complete all as specified. |
| 58 | S& F water header of size 300 mm dia,6 mtr long and 10 mm thickness made of MS pipe with total 03 incoming of 150 mm dia and total 6 outgoing watermain of 150 mm dia Welding of 12\\" long MS nipple as per site requirement with header and fixing flange of 150 mm dia at outer end of nipple for making connection inlet and outlet pipes of header including two coat of synthetic enamel paint over a coat of red oxide primer alongwith suitable size of platform 6 X 2.1X 3.5 Mtr all as per directed by Engineer-in-charge. Note: Rates of platform shall deemed to be included in quoted rates. Please Enable Macros to View BoQ information |
| 59 | S& F water header of size 300 mm dia,6 mtr long and 10 mm thickness made of MS pipe with total 03 incoming of 150 mm dia and total 6 outgoing watermain of 150 mm dia Welding of 12\\" long MS nipple as per site requirement with header and fixing flange of 150 mm dia at outer end of nipple for making connection inlet and outlet pipes of header including two coat of synthetic enamel paint over a coat of red oxide primer alongwith suitable size of platform 6 X 2.1X 3.5 Mtr all as per directed by Engineer-in-charge. Note: Rates of platform shall deemed to be included in quoted rates. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 22, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayJul 24, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender