Tender For Construction of Link Road From Banana Khad To Sharmala Dhonoth Km 0/00 To 1/105 (Sh- F/C 5/7 Mtr Wide Road At Rd 0/165 To 0/250 & Construction of Boundary Wall At Rd 0/032 To 0/041)
Tender Overview
Project Description
Tender for Construction of Link Road From Banana Khad To Sharmala Dhonoth Km 0/00 To 1/105 (Sh- F/C 5/7 Mtr Wide Road At Rd 0/165 To 0/250 & Construction of Boundary Wall At Rd 0/032 To 0/041) , Excavation In Earth Work In Hilly Area In All Heights And Depths In All Kinds Of Soil Including Saturated Soil Comprising Of Mixed Soil, Ordinary And Hard Rock. All Work Of Rock Cutting By Blasting Shall Be Carried Out By Taking All Necessary Precautions Against Soil Erosion,Damage To Hill Side.Water Pollution, Etc And To Protect Soil Stability Of Hill Side Rock Shall Be Excavated With Chiseling And Wedging Our Rock (Where Blasting Is Prohibited).All Earth Work In Cutting/Excavation Including Rock Excavation Shall Be Carried Out True To Line,Grades,Slops,Width,Camber,Super Elevation And Level As Shown On The Drawing As Per Direction Of Engineer In Charge In Conformity With The Requirement Of Technical Specification For Rural Roads August 2004 Clause 16.2 Of General Conditions Of Contract To Achieve Designed Formation Width Including Hauling And Stacking Of Material Useful For Construction At Suitable Sites And Stage, Disposal Of Unsuitable Cut Material In Specificied Manner, Trimmingfilling Of Unevenness Blindage And Finishing Of The Road To Specified Diamensions Or As Directed By Engineer In Charge For Smooth Riding.The Recovery Of Useful Stones Shall Be Made From The Contractor And Recovery Of 492.55 Cubic Meter Useful Stones Shall Be Made @ 300/-Per Cubic Meter On Prorata Basis In Each Running Bill. Any Loss To The Public And Private Property During The Course Of Excavation Shall Be Resorted By The Contractor What So Ever The Nature Of The Same May Be.The Servicable Material Will Be Stacked Out Specified /Dimension In All Leads And Lifts As Per The Direction Of Engineer In Charge. , Excavation In Soil In Hilly Area In All Kind Of Sand By Mechanical/Manual Means Including Cutting And Trimming Of Side Slopes And Disposing Of Excavated Earth With A Lift Upto Any Lead And Lift As Per Technical Specification Clause 1603.1 And As Per Hppwd, Specification Of 1990 Volume-I, Or As Directed By The Engineer-In-Charge. , Earthwork In Excavation For Structures As Per Drawing And Technical Specifications Clause 305.1 Including Setting Out, Construction Of Shoring And Bracing, Removal Of Stumps And Other Deleterious Material And Disposal Upto A Any Lead And Lift , Dressing Of Sides And Bottom And Backfilling In Trenches With Excavated Suitable Material.Useful Material Available From Excavation To Be Properly Stacked And Handed Over To The Department Free Of Cost Including All Leads And Lifts, As Per Hppwd, Specification Of 1990 Volume-I Or As Directed By The Engineer-In-Charge , Providing And Laying Concrete For Plain/Reinforced Concrete In Open Foundations Complete As Per Drawing And Technical Specification Clauses 802,803,1202 And 1203.(1:6:12) , Random Rubble Masonrystone Masonry(Un-Coursed/Brought To Courses)With Hard Stone Of Approved Quality In Foundation In Cement Mortar 1:6(1Cement:6Sand) Complete As Per Drawing And Technical Specifications Clauses 702, 704, 1202 & 1203.Including All Leads And Lifts, Or As Per Hppwd,. Specification Of 1990 Volume-I, Asdirected By The Engineer-In-Charge. , Providing Weapholes In Brick Masonry / Stone Masonry /Plain Reinforced Concrete Abutment, Wing Wall, Return Wall With 100 Mm Dia Pvc Pipe Extending Through The Full With Of The Structures With Slop Of 1(V):20(H) Towards Drawing Face Complete As Per Drawing And Technical Specification Clauses 614, 709, 1204.3.7
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in earth work in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of mixed soil, ordinary and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion,damage to hill side.Water pollution, etc and to protect soil stability of hill side rock shall be excavated with chiseling and wedging our rock (where blasting is prohibited).All earth work in cutting/excavation including rock excavation shall be carried out true to line,grades,slops,width,camber,super elevation and level as shown on the drawing as per direction of Engineer in Charge in conformity with the requirement of technical specification for rural roads august 2004 clause 16.2 of general conditions of contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and stage, disposal of unsuitable cut material in specificied manner, trimmingfilling of unevenness blindage and finishing of the road to specified diamensions or as directed by Engineer in charge for smooth riding.The recovery of useful stones shall be made from the contractor and recovery of 492.55 cubic meter useful stones shall be made @ 300/-per cubic meter on prorata basis in each running bill. Any loss to the public and private property during the course of excavation shall be resorted by the contractor what so ever the nature of the same may be.The servicable material will be stacked out specified /dimension in all leads and lifts as per the direction of Engineer in Charge. |
| 2 | Excavation in soil in Hilly Area in all kind of sand by mechanical/manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto any lead and lift as per Technical Specification Clause 1603.1 and as per HPPWD, specification of 1990 Volume-I, or as directed by the Engineer-In-Charge. |
| 3 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge |
| 4 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203.(1:6:12) |
| 5 | Random rubble masonrystone masonry(un-coursed/brought to courses)with hard stone of approved quality in foundation in cement mortar 1:6(1cement:6sand) complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.including all leads and lifts, or as per HPPWD,. Specification of 1990 Volume-I, asdirected by the Engineer-In-Charge. |
| 6 | Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender