Tender For Sweeping And Mopping Of Floor Area And Maintaining The Toilets In Neat And Hygienic Condition In Non Plant Buildings, Ahp Mcc Buildings, Chp Mcc Buildings, Water Treatment Plant, Fire Water Pump House , Fuel Oil Pump House , Admin Building
Tender Overview
Project Description
Tender for Sweeping And Mopping Of Floor Area And Maintaining The Toilets In Neat And Hygienic Condition In Non Plant Buildings, Ahp Mcc Buildings, Chp Mcc Buildings, Water Treatment Plant, Fire Water Pump House , Fuel Oil Pump House , Admin Building Including Both The Onshore And Offshore Buildings Of Coal Jetty And Cleaning Of Roads, Drains, Etc Of Udangudi Thermal Power Plant From The Date Of Commencement Of Work For Btg Bop & Coal Jetty Areas For A Period Of 260Days From 13.07.2026 To 31.03.2027 Or From The Date Of Commencement Of Work Whichever Is Later
BOQ
| Sl. No. | Item Description |
| 1 | Clearing light jungle and disposing off to a place at least 1 km away from the site as directed by the Engineer in charge including cost of all labour charges, lead, lift, Tool & plants etc, complete. |
| 2 | Sweeping and cleaning of all the floor areas in all building including collection of debris, garbage, fly ash, tea cups, paper waste and other litters etc., disposing the same in to nearby dustbins in all working days , as instructed by engineer incharge.The rate including cost of all labour , lead, lift, broom sticks, gunny bags , safety tools, and appliances etc., complete. |
| 3 | Plant and Onshore area |
| 4 | Offshore Area - Coal Jetty |
| 5 | Mopping and cleaning of floor area for all buildings including cost of all materials required for mopping and cleaning materials, Tools and plants, Charges and safety appliances etc., complete |
| 6 | Plant and Onshore area |
| 7 | Offshore Area - Coal Jetty |
| 8 | Cleaning and clearing of debris and fly ash from roof top and gutter at various elevations and bring down to '0'mtr level with an average lead of 200mtrs and disposing the same 1km away from the site as instructed by the Engineer at site, rate including cost of labour, lead, lift, safety appliances, gunny bags, transporting by tractor, loading & unloading etc, complete. |
| 9 | Charges for cleaning of toilets including of water closets, urinals, wash basins floor adjacent pathways and bath rooms rate including cost of broom sticks, brush, buckets, labour, lead, lift, safety appliances, cleaning agents such as bleaching powder etc., disposing of food waste from various floor etc. complete. |
| 10 | Small Toilets of floor area not more that 10m2 at plant and On shore area |
| 11 | Small Toilets of floor area not more that 10m2 at Offshore area-Coal Jetty |
| 12 | Medium Toilet of floor area above 10Sqm and below 17Sqm area at plant and Onshore area. |
| 13 | Large Toilet of floor area of 17m2 and above at plant and Onshore area. |
| 14 | Provision for Supplying Tap and specials for plumbing system whenever gets damaged during operation including cost of all materials,labour,lead,lift, T&P etc.,complete. |
| 15 | 15mm dia Pillar Tap |
| 16 | 15mm dia Stop Cock |
| 17 | Gun metal Wheel Valve 15ø |
| 18 | Gun metal Wheel Valve 25ø |
| 19 | CPVC Pipe 32ø (10Kg/cm2) |
| 20 | CPVC Pipe 25ø (10Kg/cm2) |
| 21 | CPVC Pipe 20ø (10Kg/cm2) |
| 22 | CPVC Pipe 15ø (10Kg/cm2) |
| 23 | PVC Pipe 32ø (10kg/cm2) |
| 24 | PVC Pipe 25ø (10kg/cm2) |
| 25 | PVC Pipe 20ø (10kg/cm2) |
| 26 | PVC Pipe 15ø (10kg/cm2) |
| 27 | Urinal Spreader |
| 28 | Cp Coated Health Faucet |
| 29 | Supplying, transporting and placing of packaged drinking water can with water dispenser (20 litres) for the use of Officials & staff in all building whenever required including cost of water, Lead, lift and labour etc., complete as directed by the Engineer-in-charge |
| 30 | Plant and Onshore area |
| 31 | Offshore Area - Coal Jetty |
| 32 | Regular maintenance of the exisiting lawns, korean grass, hedge plants and other plants and flower pots inthe area by watering, cleaning and disposing of fallen dry leaves from the lawn area,removal of weeds growth and plucking out excess grass growth at the bottom of hedge,providing manure to the grass, rate including cost of all Charges, with all tools and tackles such as water hoses/ pipe and scissors sprinklers etc., complete. |
| 33 | Clearing of Slush, clay, and debris, wherever present over the entire length of Storm water drain and transporting the slush including providing of safety appliances etc., outside and depositing in low lying area as direted by the Engineer incharge et., Complete. |
| 34 | Sweeping and cleaning all road areas including collection of debris garbages fly ash tea cups, polythene cups, paper waste and other litter etc., and disposing the same into nearby dustbins in all road areas in all areas of power houses and coal jetty areas once in a week as instructed by Engineer, rate including cost of all labour, lead, lift, broomstick, gunny bags, safety tools and appliances etc.,complete. |
| 35 | Plant and Onshore area |
| 36 | Offshore Area - Coal Jetty |
| 37 | Clearing of all kinds of waste, garbages, debries, silt, fly ash etc., from dustbins and spilled around dustbins areas in various places in all building and disposing away with a lead of 1Km away from the site, as directed by the Engineer at site using tractors with body height not less than 0.60m, rate including for hire charges for tractor, cost of diesel, engine oil, wear & tear, labour, lead, lift, etc., complete. (Clearance to be done once in a week or as directed by the Engineer in-charge at site. Nets shall be used to cover garbages while transporting) |
| 38 | Plant and Onshore area |
| 39 | Offshore Area - Coal Jetty |
| 40 | Cleaning the inside, bottom floor, inside & outside walls ( height upto 3mtr from floor) of the concrete chimney and keeping the area clean, (as per the instruction of site Engineer) rate including cost of all material, labour, water charges, broom sticks etc., complete |
| 41 | Operation and Maintaining register of sewage treatment Plant including all pump Operation at onshore and offshore including cost of all safety measures, Chlorine Dosing, inspection of pipe lines, Safety Appliances, etc., complete. |
| 42 | Plant and Onshore area |
| 43 | Off shore Area - Coal Jetty |
| 44 | GST (as per GOVT rule) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender