Tender For Running Maintenance And Repair To Canal 6Mc From Ch. 486.00 To Ch. 816.00 , 6Emc, Kvc, 6 Fmc, 6Gmc, Kadra Khal, Bandul Village Channel, Wc-60 Of 6Fmc In Connection With Kharif Irrigation-2026 Under Debogram Section Of D.C.No-I Sub-Division
Tender Overview
Project Description
Tender for Running Maintenance And Repair To Canal 6Mc From Ch. 486.00 To Ch. 816.00 , 6Emc, Kvc, 6 Fmc, 6Gmc, Kadra Khal, Bandul Village Channel, Wc-60 Of 6Fmc In Connection With Kharif Irrigation-2026 Under Debogram Section Of D.C.No-I Sub-Division Within Damodar Canal Division.
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section &throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. |
| 2 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and\ depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. (A) Beyond 500 metre and upto 1.00 km. |
| 3 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 4 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.Where boats are not necessary. |
| 5 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 6 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 7 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). |
| 8 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 9 | Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete. |
| 10 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed byEngineer-in-charge. |
| 11 | Construction temporary khalashi shed (floor area 2.45 M X 2.45 M) with 7.50 cm dia strong bamboo post (6 Nos. 2.70 M long and 3 Nos. 3.30 M long) each post being fixed in 60 Cm depth holes in the soil. Full bamboo post plates (5 Nos. 2.70 M long) slope thatched roof (2 X 2.75 M X 1.50 M) area of Aman rice straw 10 cm pressed thick including ridges and hips and bamboo splits on frame of half split bamboo (2 X 13Nos. X 1.50 M) and ¼ split bamboo (2 X 5 Nos. X 2.75 M) single darma mat wall 4 X 2.45 X 2.10 + 2 X ½ X 0.60 M with one coat coal tarring with 5% pitch with fitted and fixed of half split bamboo strong with split bamboo placed bothways (15Cm or part) on both sides and fixed to ½ split bamboo frame work 4 X 2 X 2.45 M) & lapping on the floor with earth and cow-dang mixed 1 : 4 & one macha (2.15 X 0.90 M) resting on the full bamboo (2 Nos. 2.45 M & 2 Nos. 1.25 M) fitting & fixing with belts & iron nails etc. & made of ½ split bamboo (6 Nos. 1.25 M & 13 Nos. 2.15 M) all bamboo fitting in the whole structure be fitted & fixed with nails, coir strings etc. including carriage of all materials to site as per drawing and direction of the Engineer-in-charge.. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender