Bids Are invited for Custom Bid For Services - Increasing Capacity Of 16 Kva To 25 Kva Distribution Transformer On Semi Turnkey Basis In Business Plan 2026-27 Under The Area Of Edd- Fatehabad Agra - Carriage Of Following From Electricity Store Centre
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Increasing Capacity Of 16 Kva To 25 Kva Distribution Transformer On Semi Turnkey Basis In Business Plan 2026-27 Under The Area Of Edd- Fatehabad Agra - Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-100Kms.) A) Pcc Pole 8.5/9 Mtr. Long , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-100Kms.) B) 25Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-100Kms.) I) Lt Xlpe Cable Al 3.5X150 Sqmm (648 Mtr), Lt Pvc Cable (Mtr), Lt Xlpe Cable 1*400Sqmm (Mtr) , Lt Xlpe Cable 1*150Sqmm ( Mtr) , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-100Kms.) J) Line Material Viz. Abc 3X50 Sqmm(17257 Mtr) / Weasal Conductor (3490 Mtr), Stay Set Complete (163 Nos), 11 Kv Fuse Set (73 Nos), Tpmo ( ), Cross Arm, Angle, Pin Insulators (562 Nos), Disk Insulators With Fitting (387 Nos) And Other Line Material, If Required, Earthing Complete (244 Nos), X Arm V Type (107 Nos), Distribution Box ( 338 Nos), Smc Box (29 Nos) , Erection And Grouting Of Single Pole Pcc 8.5 Mtr. Long In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Double Pole Pcc 8.5 Mtr. Long In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Mountingof Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection C) 25Kva T/F. , Fixing Of Earthing Complete As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Acsr Weasal Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. C) Abc 3X50sqmm , Laying Of Lt Xlpe Cable Al 3.5X150 Sqmm Overhead Cable With Making Loop Complete Work As Per Respo Norms And Direction By Supervising Engineer. , Fixing Of Smc Box As Direction By Supervising Engineer. , Fixing Of Distribution Box With Cl On Errected Pole For Giving Supply To Consumer By Connecting Consumer Cables. , Installation Of Stay Set As Direction By Supervising Engineer. , Installation Of 11Kv Fuse Set As Direction By Supervising Engineer. , Grouting Of Stay As Direction By Supervising Engineer. All Required Material Provided By Contractor At His Own Cost , Providing & Fixing Of Stone Pad , Providing & Fixing Dropper Channel 100X50x2028mm , Providing & Fixing Dp Cl , Providing & Fixing Ht Channel , Providing & Fixing T Off Channel With Cl , Providing & Fixing Of Lt Pole Cl , Providing & Fixing Of Cl For T Channel , Providing & Fixing Danger Board With Nut & Bolt , Providing & Fixing Of X Arm Holding Cl , Providing & Fixing F Braket , Providing & Fixing Suspension Cl With I Hook , Providing & Fixing Eye Hook , Providing & Fixing Dead End Cl , Providing & Fixing Db Cl , Providing & Fixing Nut & Bolt Off Size , Dismentling & Removal Of 10/16 Kva T/F And Recived Back To Ele. Store Center Taj Agra
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) A) PCC pole 8.5/9 Mtr. long | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) A) PCC pole 8.5/9 Mtr. long |
| 2 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) B) 25KVA T/F | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) B) 25KVA T/F |
| 3 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) I) LT XLPE CABLE AL 3.5X150 SQMM (648 mtr), LT PVC Cable (mtr), LT XLPE Cable 1*400SQMM (mtr) , LT XLPE Cable 1*150SQMM ( mtr) | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) I) LT XLPE CABLE AL 3.5X150 SQMM (648 mtr), LT PVC Cable (mtr), LT XLPE Cable 1*400SQMM (mtr) , LT XLPE Cable 1*150SQMM ( mtr) |
| 4 | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) J) Line material viz. ABC 3X50 SQMM(17257 mtr) / Weasal conductor (3490 mtr), stay set Complete (163 nos), 11 kv Fuse set (73 nos), TPMO ( ), cross arm, angle, Pin insulators (562 nos), Disk insulators with fitting (387 nos) and other line material, if required, earthing complete (244 nos), x Arm v type (107 nos), Distribution Box ( 338 nos), SMC Box (29 nos) | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) J) Line material viz. ABC 3X50 SQMM(17257 mtr) / Weasal conductor (3490 mtr), stay set Complete (163 nos), 11 kv Fuse set (73 nos), TPMO ( ), cross arm, angle, Pin insulators (562 nos), Disk insulators with fitting (387 nos) and other line material, if required, earthing complete (244 nos), x Arm v type (107 nos), Distribution Box ( 338 nos), SMC Box (29 nos) |
| 5 | Erection and grouting of single Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of single Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 6 | Erection and grouting Double Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting Double Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 7 | Erection and Mountingof following T/F on existing double pole/single pole & making HT/LT connection c) 25KVA T/F. | Erection and Mountingof following T/F on existing double pole/single pole & making HT/LT connection c) 25KVA T/F. |
| 8 | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 9 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor |
| 10 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C) ABC 3X50SQMM | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C) ABC 3X50SQMM |
| 11 | Laying of LT XLPE CABLE AL 3.5X150 SQMM overhead Cable with making loop complete work as per RESPO norms and direction by supervising Engineer. | Laying of LT XLPE CABLE AL 3.5X150 SQMM overhead Cable with making loop complete work as per RESPO norms and direction by supervising Engineer. |
| 12 | Fixing of SMC Box as direction by supervising Engineer. | Fixing of SMC Box as direction by supervising Engineer. |
| 13 | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. |
| 14 | Installation of Stay set as direction by supervising Engineer. | Installation of Stay set as direction by supervising Engineer. |
| 15 | Installation of 11kv fuse set as direction by supervising Engineer. | Installation of 11kv fuse set as direction by supervising Engineer. |
| 16 | Grouting of Stay as direction by supervising Engineer. All required Material Provided by Contractor at his own cost | Grouting of Stay as direction by supervising Engineer. All required Material Provided by Contractor at his own cost |
| 17 | PROVIDING & FIXING OF Stone pad | PROVIDING & FIXING OF Stone pad |
| 18 | PROVIDING & FIXING DROPPER CHANNEL 100X50X2028MM | PROVIDING & FIXING DROPPER CHANNEL 100X50X2028MM |
| 19 | PROVIDING & FIXING DP CLAMP | PROVIDING & FIXING DP CLAMP |
| 20 | PROVIDING & FIXING HT CHANNEL | PROVIDING & FIXING HT CHANNEL |
| 21 | PROVIDING & FIXING T OFF CHANNEL WITH CLAMP | PROVIDING & FIXING T OFF CHANNEL WITH CLAMP |
| 22 | PROVIDING & FIXING OF LT POLE CLAMP | PROVIDING & FIXING OF LT POLE CLAMP |
| 23 | PROVIDING & FIXING OF CLAMP FOR T CHANNEL | PROVIDING & FIXING OF CLAMP FOR T CHANNEL |
| 24 | PROVIDING & FIXING DANGER BOARD WITH NUT & BOLT | PROVIDING & FIXING DANGER BOARD WITH NUT & BOLT |
| 25 | PROVIDING & FIXING of X Arm Holding Clamp | PROVIDING & FIXING of X Arm Holding Clamp |
| 26 | PROVIDING & FIXING F Braket | PROVIDING & FIXING F Braket |
| 27 | PROVIDING & FIXING SUSPENSION CLAMP WITH I HOOK | PROVIDING & FIXING SUSPENSION CLAMP WITH I HOOK |
| 28 | PROVIDING & FIXING EYE HOOK | PROVIDING & FIXING EYE HOOK |
| 29 | PROVIDING & FIXING DEAD END CLAMP | PROVIDING & FIXING DEAD END CLAMP |
| 30 | PROVIDING & FIXING DB CLAMP | PROVIDING & FIXING DB CLAMP |
| 31 | PROVIDING & FIXING Nut & Bolt Off Size | PROVIDING & FIXING Nut & Bolt Off Size |
| 32 | Dismentling & Removal of 10/16 KVA T/F and Recived back to ele. Store Center Taj Agra | Dismentling & Removal of 10/16 KVA T/F and Recived back to ele. Store Center Taj Agra |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender