Bids Are invited for Custom Bid For Services - Increasing Capacity Fo 16Kva To 25Kva Distribution Transformers And 100Kva To 250Kva Distribution Transformer On Semi Turnkey Basis In Business Plan 2026-27 Under The Area Of Edd Bah Agra - Carriage Of F
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Increasing Capacity Fo 16Kva To 25Kva Distribution Transformers And 100Kva To 250Kva Distribution Transformer On Semi Turnkey Basis In Business Plan 2026-27 Under The Area Of Edd Bah Agra - Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-100Kms.) A) Pcc Pole 8.5/9 Mtr. Long , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-100Kms.) B) 25Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-100Kms.) C) 250 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-100Kms.) I) Lt Xlpe Cable Al 3.5X150/70/240/400 Sqmm, Lt Pvc Cable (20 Mtr), Lt Xlpe Cable 1*400Sqmm (60 Mtr) , Lt Xlpe Cable 1*150Sqmm (200 Mtr) , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-100Kms.) J) Line Material Viz. Abc 3X50 Sqmm(4130Mtr) / Weasal Conductor (50Mtr), Stay Set (38 Nos), 11 Kv Fuse Set (14 Nos), Tpmo (7 Nos), Cross Arm, Angle, Pin Insulators (54 Nos), Disk Insulators (57 Nos) And Other Line Material, If Required, Earthing Complete (38 Nos) , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Single Pole On 8.5 Mtr. Long Pcc Poles Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Double Pole On 8.5 Mtr. Long Pcc Poles Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Fixing Of Earthing Complete As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Acsr Weasal Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. C) Abc 3X50sqmm , Construction Of Plinth For 250 Kva Transformer Of Size 5X5x4 Above The Ground Lable And 1 Feet Below The Ground. At The Bottom There Shall Be Cc Pad Of Brick Ballast Of Size 5X5x3 Thick In Ratio 1:3:6 [Cement, Sand And Brick Ballast]. The First Class Brick Wall Work Shall Be 9 Thick In Ratio 1:4 [Cement And Sand]. The Hollow Portion Among The Wall Shall Be Filled Up With The Brick Ballast. On The Top Of The Wall Of Plint There Shall Be Rcc Work In Ratio 1:3:6 [Cement, Sand And Grit Stone] By Using 12 Mm Dai Ms Bar At Distance Of 9. There Shall Be Plastering All Over The Plinth 12 Mm Thick In Ratio 1:4 [Cement And Sand] Above The Ground Level. Proper Watering And Curing Of The Plinth Shall Be Carried Out As Per Direction Of Supervising Engineer. , Fencing Of 250 Kva T/Fs As Per Following Specification -Fabrication Of 50X50x6 Mm Size Ms Angle Frame Of Size 3000X2400mm With 450 Mm Long Angle For Grouting The Frame And Fixing Of 2X1.5, 10 Swg Welded Wire Mesh With Ms Strip Of 24X5mm Size All Round The Frame And Drilling 9 Mm Holes Insides Of Frames At As Distance Of 300Mm For Jointing Of Frame With The Help Of Boslts And Nuts Including Cost Of Material. The Width Of Panal May Vary As Per Site Conditions, Grouting And Fixing Of Angle Iron Frames In Ratio 1:2:4 (Cement, Coarse Sand And Stone Ballast ) In The Pocket Of 150X150x150mm All Round The Plinth And Bolting Of Frames With 25X8 Mm Size Bolts And Nuts, Making Main Gate In Front Of The Plinth Of Size 3000X2400 Mm By Making Two Leaves Of Size 3000X1200mm Size And Grouting The Same In Ratio And Method Mentioned At Item (B) Above Fixing With Hinges With Dandlas For Locking System & Painting Of Entire Wire Mesh Angle Iron Etc. With Bus Green Super Enamelled Pain In Two Coats On The Primer Two Coats Of Red Oxide. , Earthing Of 250 Kva Distribution Transformer By Maintenance Free Earthing Electrods (Chemical) By Digging Pits 6 Dia 3Mtr. Deep Including Inserting Pipe In Pipe Technology Concept Involve Two Mild Steel Pipes One Inserted Inside The Other Of Size ;- 1. Inner Pip Dia Meter 50 Mm. 2. Outer Pipe Dia Meter 100 Mm. Length Of The Both Pipe Shall Be 3000 Mm. The M.S.Pipe Shall Be Isi Mark Of Class B As Per Is 1239. Thickness Of The Pipe Shall Be 12 Swg. The Empty Space In The Pipe Shall Be Filled With The Specially Developed Crystalline Material Conductiv Mixture Such As Copper And Aluminimum Powder.Conductive Carbon And Bonding Material Etc. Mixed In Diffrent Proportions. Conductive Mixture Contents Shall Be 70 % Carbon Powder & 30% Metal Powder Preferably Pure Copper Or Aluminum Material Along With The Required Quantity Of Bonding Materials. Granule Size Of The Carbon & Metal Powder Shall Be 100 Mesh. The Mixture If Forced (Pressurized) Inside The Earth Electrode In Empty Space Of Inner Pipe & In Empty Space Between The Inner & Outer Pipe Of The Earth Electrode, In Paste Form And After Soldification Of The Same The Bottom End Cap As Well As Top End Cap Is Provided. The Mixture Shall Be Pressed By Machine In The Pipe. Precaution Shall Be Taken Has To Have No Air Gap Inside The Pipe While Pressing. The Back Fill Compound (Earth Enhancment Material ) Shall Be Superior Conductive Material That Improves Earthing Effectiveness Especially In Areas Of Poor Conductivity Such As Rocky Ground, Sandy Soil & Areas Of Moisture Varation. It May Contain Conductive Cement (20%) Graphite Carbon Powder(50%), Hydrous Aluminum Siliacate (10%), Sodium Montmorillonite (20%) Etc. It Shall Be Placed Around Earth Electrode In The Earth Pit To Improve The Conductive Of Earth Electrode & Ground Contact Area. Mild Steel Electro Galavanized Flat 50X6 Mm Shall Welded To Earth Electrode Pips & Connected With Trasnformer Neutral And Body As Below With The Hlep Of Steel Nut & Bolt Or Through Welding As Per Requirment Of Site, To Gi Pipe And Filling Of Chemical Mixutre Around The Gi Pipe Upto 3 Mtr. Including Making Of Chamber & Connecting The Top Of The Inserted Pipe With Transformer Body & Neutral Through M.S.Flat 50X6mm With The Help Of Nut & Bolt Or Through Welding And Making A Main Hole Of Size 2×2 And Covering The Same By A Stone Pad For The Purpose Of Poring Water For Moisture. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection C) 25Kva T/F. , Fixing Of Distribution Box With Cl On Errected Pole For Giving Supply To Consumer By Connecting Consumer Cables. , Installation For 250 Kva T/F On Plinth In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Laying Of Lt Xlpe Cable Al 3.5X150/70/240/400 Sqmm Overhead Cable With Making Loop Complete Work As Per Respo Norms And Direction By Supervising Engineer. , Laying Of Lt Xlpe Cable 1*400/150Sqmm, , Laying Of Lt Pvc Cable , Installation Of Stay Set As Direction By Supervising Engineer. , Installation Of Tpmo As Direction By Supervising Engineer. , Installation Of D.O. Fuse Set On Double Pole , Concreating Of Pole As Per Respo Norms As Direction By Supervising Engineer. , Providing & Fixing Ms Top Channel 125X65x2240mm , Providing & Fixing Of Stone Pad , Providing & Fixing Dropper Channel 100X50x2028mm , Providing & Fixing Ms Angle 75X75x6x2228mm With Cl , Providing & Fixing Dp Cl , Providing & Fixing T Off Channel With Cl , Providing & Fixing Danger Board With Nut & Bolt , Providing & Fixing Lt Incoming Pannel , Providing & Fixing Suspension Cl With I Hook , Providing & Fixing Eye Hook , Providing & Fixing Dead And Cl , Providing & Fixing Db Cl , Providing & Installation Of Henley Type Tailless Unit Protection Cubical Panel 500 A 650 V For 250 Kva Dt , Providing & Fixing Nut & Bolt Off Size , Providing & Fixing Alu. Lug 400 Sqmm , Providing & Fixing Cooper T Piece 62*225*12 , Providing & Fixing Cooper T Piece , Dismentling & Removal Of 16 Kva T/F And Recived Back To Ele. Store Center Taj Agra , Dismentling & Removal Of 100 Kva T/F And Recived Back To Ele. Store Center Taj Agra
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) A) PCC pole 8.5/9 Mtr. long | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) A) PCC pole 8.5/9 Mtr. long |
| 2 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) B) 25KVA T/F | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) B) 25KVA T/F |
| 3 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) C) 250 KVA T/F | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) C) 250 KVA T/F |
| 4 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) I) LT XLPE CABLE AL 3.5X150/70/240/400 SQMM, LT PVC Cable (20 mtr), LT XLPE Cable 1*400SQMM (60 mtr) , LT XLPE Cable 1*150SQMM (200 mtr) | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) I) LT XLPE CABLE AL 3.5X150/70/240/400 SQMM, LT PVC Cable (20 mtr), LT XLPE Cable 1*400SQMM (60 mtr) , LT XLPE Cable 1*150SQMM (200 mtr) |
| 5 | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) J) Line material viz. ABC 3X50 SQMM(4130MTR) / Weasal conductor (50mtr), stay set (38 nos), 11 kv Fuse set (14 nos), TPMO (7 nos), cross arm, angle, Pin insulators (54 nos), Disk insulators (57 nos) and other line material, if required, earthing complete (38 nos) | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-100Kms.) J) Line material viz. ABC 3X50 SQMM(4130MTR) / Weasal conductor (50mtr), stay set (38 nos), 11 kv Fuse set (14 nos), TPMO (7 nos), cross arm, angle, Pin insulators (54 nos), Disk insulators (57 nos) and other line material, if required, earthing complete (38 nos) |
| 6 | Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) single Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) single Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 7 | Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 8 | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 9 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor |
| 10 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C) ABC 3X50SQMM | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C) ABC 3X50SQMM |
| 11 | Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer. | Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer. |
| 12 | Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide. | Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide. |
| 13 | Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture. | Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture. |
| 14 | Mounting of following T/F on existing double pole/single pole & making HT/LT connection c) 25KVA T/F. | Mounting of following T/F on existing double pole/single pole & making HT/LT connection c) 25KVA T/F. |
| 15 | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. |
| 16 | Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. | Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. |
| 17 | Laying of LT XLPE CABLE AL 3.5X150/70/240/400 SQMM overhead Cable with making loop complete work as per RESPO norms and direction by supervising Engineer. | Laying of LT XLPE CABLE AL 3.5X150/70/240/400 SQMM overhead Cable with making loop complete work as per RESPO norms and direction by supervising Engineer. |
| 18 | Laying of LT XLPE Cable 1*400/150SQMM, | Laying of LT XLPE Cable 1*400/150SQMM, |
| 19 | Laying of LT PVC CABLE | Laying of LT PVC CABLE |
| 20 | Installation of Stay set as direction by supervising Engineer. | Installation of Stay set as direction by supervising Engineer. |
| 21 | Installation of TPMO as direction by supervising Engineer. | Installation of TPMO as direction by supervising Engineer. |
| 22 | Installation of D.O. Fuse set on Double pole | Installation of D.O. Fuse set on Double pole |
| 23 | Concreating of Pole as per RESPO NORMS as direction by supervising Engineer. | Concreating of Pole as per RESPO NORMS as direction by supervising Engineer. |
| 24 | PROVIDING & FIXING MS TOP CHANNEL 125X65X2240MM | PROVIDING & FIXING MS TOP CHANNEL 125X65X2240MM |
| 25 | PROVIDING & FIXING OF Stone pad | PROVIDING & FIXING OF Stone pad |
| 26 | PROVIDING & FIXING DROPPER CHANNEL 100X50X2028MM | PROVIDING & FIXING DROPPER CHANNEL 100X50X2028MM |
| 27 | PROVIDING & FIXING MS ANGLE 75X75X6X2228MM WITH CLAMP | PROVIDING & FIXING MS ANGLE 75X75X6X2228MM WITH CLAMP |
| 28 | PROVIDING & FIXING DP CLAMP | PROVIDING & FIXING DP CLAMP |
| 29 | PROVIDING & FIXING T OFF CHANNEL WITH CLAMP | PROVIDING & FIXING T OFF CHANNEL WITH CLAMP |
| 30 | PROVIDING & FIXING DANGER BOARD WITH NUT & BOLT | PROVIDING & FIXING DANGER BOARD WITH NUT & BOLT |
| 31 | PROVIDING & FIXING LT INCOMING PANNEL | PROVIDING & FIXING LT INCOMING PANNEL |
| 32 | PROVIDING & FIXING SUSPENSION CLAMP WITH I HOOK | PROVIDING & FIXING SUSPENSION CLAMP WITH I HOOK |
| 33 | PROVIDING & FIXING EYE HOOK | PROVIDING & FIXING EYE HOOK |
| 34 | PROVIDING & FIXING DEAD AND CLAMP | PROVIDING & FIXING DEAD AND CLAMP |
| 35 | PROVIDING & FIXING DB CLAMP | PROVIDING & FIXING DB CLAMP |
| 36 | PROVIDING & Installation of Henley Type Tailless Unit Protection Cubical Panel 500 A 650 V FOR 250 KVA DT | PROVIDING & Installation of Henley Type Tailless Unit Protection Cubical Panel 500 A 650 V FOR 250 KVA DT |
| 37 | PROVIDING & FIXING Nut & Bolt Off Size | PROVIDING & FIXING Nut & Bolt Off Size |
| 38 | PROVIDING & FIXING Alu. Lug 400 SQMM | PROVIDING & FIXING Alu. Lug 400 SQMM |
| 39 | PROVIDING & FIXING Cooper T Piece 62*225*12 | PROVIDING & FIXING Cooper T Piece 62*225*12 |
| 40 | PROVIDING & FIXING Cooper T Piece | PROVIDING & FIXING Cooper T Piece |
| 41 | Dismentling & Removal of 16 KVA T/F and Recived back to ele. Store Center Taj Agra | Dismentling & Removal of 16 KVA T/F and Recived back to ele. Store Center Taj Agra |
| 42 | Dismentling & Removal of 100 KVA T/F and Recived back to ele. Store Center Taj Agra | Dismentling & Removal of 100 KVA T/F and Recived back to ele. Store Center Taj Agra |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender