Bids Are invited for Custom Bid For Services - Erection And Commissioning Of 11Kv Line Strengthening Work On Semi Turnkey Basis In Business Plan 2026 -27 Under The Area Of Edd- Etmadpur Agra - (Part-A) Supply & Erection Providing & Fixing Of Stone Pa
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Erection And Commissioning Of 11Kv Line Strengthening Work On Semi Turnkey Basis In Business Plan 2026 -27 Under The Area Of Edd- Etmadpur Agra - (Part-A) Supply & Erection Providing & Fixing Of Stone Pad , Providing & Fixing Of Cl With Nut & Bolt , Providing & Fixing Of T-Off Channel , Providing & Fixing Of Cl For T-Off Channel , Providing & Fixing Of Holding Cl For X Arm , Providing & Fixing Of Nut & Bolt Off Size , Providing & Fixing Of Gaurding Angle With Holding Cl , Providing & Fixing Of 11 Kv F-Bracket , Providing & Fixing Of Wti , Providing & Fixing Of Oti , (Part-B) Carriage & Erection Carriage Of Pcc Pole 8.5 Mtr. Long. From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of St Pole 11 Mtr. Long. From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50 Kms.) J) Weasal Conductor (38050 Mtr), Stay Set Complete (154 Nos), Earthing Complete (640 Nos.), 11 Kv Disc Insulator (398 Nos.), 11Kv V Type X Arm (697 Nos.), 11 Kv Pin Insulator With Gi Pin (2134), Gi Barbed Wire (945 Kg) And Gi Wire 6 Swg (2400 Kg), 33 Kv L A (27 Nos), Relay (13 Nos), 33 Kv Ct(06 Nos) Other Line Material, If Required, Earthing Complete ( Nos) , Erection And Grouting Of Single Pole 8.5 Mtr. Long Pcc Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of St Pole 11 Mtr. Long Single In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Laying, Sagging, Stringing, Binding And Jumpering Of Acsr Weasal Conductor In Ht Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. , Erection Of Gi Barbed Wire Including Stretching, Binding & Fixing On Existing Erected Poles Complete Complete In All Respects As Per Respo Norms , Erection Of Gaurding Below 11Kv Overhead Line Using 6 Swg Gi Wire Complete With Gaurding Engle Cl S Nut & Bolt Binding And All Necessary Complete In All Respects As Per Respo Norms , Installation Of Stay Set Complete As Direction By Supervising Engineer. , Installation Of Earthing Complete As Per Respo Norms And Direction By Supervising Engineer. , Installation Of 33 Kv La As Per Respo Norms And Direction By Supervising Engineer. , Installation Of 33 Kv Ct As Per Respo Norms And Direction By Supervising Engineer. , Installation Of Relay As Per Respo Norms And Direction By Supervising Engineer. , Dismentling, Removal Of Old & Used Scrap Material And Received Back To Ele. Store Center Taj Agra Including Loading, Unloading Both Ends (0-50Km)
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | (Part-A) Supply & Erection Providing & Fixing of Stone pad | (Part-A) Supply & Erection Providing & Fixing of Stone pad |
| 2 | Providing & Fixing of Clamp with Nut & Bolt | Providing & Fixing of Clamp with Nut & Bolt |
| 3 | Providing & Fixing of T-off Channel | Providing & Fixing of T-off Channel |
| 4 | Providing & Fixing of Clamp for T-off channel | Providing & Fixing of Clamp for T-off channel |
| 5 | Providing & Fixing of Holding Clamp for x Arm | Providing & Fixing of Holding Clamp for x Arm |
| 6 | Providing & Fixing of Nut & Bolt off size | Providing & Fixing of Nut & Bolt off size |
| 7 | Providing & Fixing of Gaurding Angle with Holding Clamp | Providing & Fixing of Gaurding Angle with Holding Clamp |
| 8 | Providing & Fixing of 11 KV F-Bracket | Providing & Fixing of 11 KV F-Bracket |
| 9 | Providing & Fixing of WTI | Providing & Fixing of WTI |
| 10 | Providing & Fixing of OTI | Providing & Fixing of OTI |
| 11 | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 12 | Carriage of ST Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of ST Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 13 | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Weasal conductor (38050 mtr), stay set Complete (154 nos), Earthing Complete (640 Nos.), 11 kv Disc Insulator (398 Nos.), 11kv V Type X Arm (697 Nos.), 11 kv Pin insulator with GI Pin (2134), GI Barbed Wire (945 kg) and GI Wire 6 SWG (2400 kg), 33 KV L A (27 Nos), Relay (13 Nos), 33 KV CT(06 Nos) other line material, if required, earthing complete ( nos) | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Weasal conductor (38050 mtr), stay set Complete (154 nos), Earthing Complete (640 Nos.), 11 kv Disc Insulator (398 Nos.), 11kv V Type X Arm (697 Nos.), 11 kv Pin insulator with GI Pin (2134), GI Barbed Wire (945 kg) and GI Wire 6 SWG (2400 kg), 33 KV L A (27 Nos), Relay (13 Nos), 33 KV CT(06 Nos) other line material, if required, earthing complete ( nos) |
| 14 | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 15 | Erection and grouting of ST Pole 11 Mtr. long Single in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11 Mtr. long Single in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 16 | Laying, sagging, stringing, binding and jumpering of ACSR Weasal conductor in HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. | Laying, sagging, stringing, binding and jumpering of ACSR Weasal conductor in HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. |
| 17 | Erection of GI Barbed Wire including stretching, binding & fixing on existing erected poles complete complete in all respects as per RESPO norms | Erection of GI Barbed Wire including stretching, binding & fixing on existing erected poles complete complete in all respects as per RESPO norms |
| 18 | Erection of Gaurding below 11kv overhead line using 6 SWG GI wire complete with Gaurding Engle clamps nut & Bolt binding and all necessary complete in all respects as per RESPO norms | Erection of Gaurding below 11kv overhead line using 6 SWG GI wire complete with Gaurding Engle clamps nut & Bolt binding and all necessary complete in all respects as per RESPO norms |
| 19 | Installation of Stay set Complete as direction by supervising Engineer. | Installation of Stay set Complete as direction by supervising Engineer. |
| 20 | Installation of Earthing Complete as per RESPO norms and direction by supervising Engineer. | Installation of Earthing Complete as per RESPO norms and direction by supervising Engineer. |
| 21 | Installation of 33 KV LA as per RESPO norms and direction by supervising Engineer. | Installation of 33 KV LA as per RESPO norms and direction by supervising Engineer. |
| 22 | Installation of 33 KV CT as per RESPO norms and direction by supervising Engineer. | Installation of 33 KV CT as per RESPO norms and direction by supervising Engineer. |
| 23 | Installation of Relay as per RESPO norms and direction by supervising Engineer. | Installation of Relay as per RESPO norms and direction by supervising Engineer. |
| 24 | Dismentling, Removal of Old & used Scrap Material and received back to ele. Store center Taj Agra including Loading, unloading both ends (0-50km) | Dismentling, Removal of Old & used Scrap Material and received back to ele. Store center Taj Agra including Loading, unloading both ends (0-50km) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender