Tender For Design, Supply, Installation, Integration And Commissioning Of Online Monitoring System For Transformers/ Reactors Installed At Various 765Kv And 400Kv Substation In Rvpn Transmission System, Against Specification No. Rvpn/Ehv/A&Sp/Tn-150
Tender Value
38.33 Crore
Estimated cost
Bid Submission
30 Jul 2026
23 days left
EMD
76.65 Lakhs
Bank guarantee accepted
Document Fee
17700
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jaipur → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Design, Supply, Installation, Integration And Commissioning Of Online Monitoring System For Transformers/ Reactors Installed At Various 765Kv And 400Kv Substation In Rvpn Transmission System, Against Specification No. Rvpn/Ehv/A&Sp/Tn-150
BOQ
| Sl. No. | Item Description |
| 1 | MATERIAL/ EQUIPMENT/ ITEM |
| 2 | Field Infrastructure |
| 3 | Online Monitoring System for oil filled Transformer/ Reactor (765kV / 400kV) (single phase) as per specification requirements |
| 4 | Online Monitoring System for oil filled Transformer/ Reactor (765kV / 400kV) (Three Phase) as per specification requirements |
| 5 | Fiber Optic (FO) temperature module (as per requirements) |
| 6 | Media Converter |
| 7 | Cables |
| 8 | Power & Control Cables (Armoured) as per the requriement |
| 9 | Cable accessories for Installation |
| 10 | Cable Conduits, tags, trays, joint boxes etc. as required for laying of cables as per standard installation requirements at substations |
| 11 | Miscellaneous Communication Cables |
| 12 | Ethernet CAT6A, Armoured fiber, Co-axial Cable, LIU, switch , connecotors etc. as required for connecting all data acquistion Devices and equipments/ items for completing the work on substations |
| 13 | Earthing |
| 14 | Earthing Strips / Electordes and other items for Earthing of supplied Equipments/ Panels at Substations |
| 15 | Material required for integration/ interfacing of existing online monitoring system installed at Transformer/ Reactor |
| 16 | Smart Grid Command & Control Center (s) (Main, Back-up & Regional) |
| 17 | Integration of Online Monitoring System with existing Grid Asset & Plant Monitoring (APM) software at Main Command and Control Centre |
| 18 | Add any other item to complete the Project |
| 19 | INSTALLATION, TESTING & COMMISSIONING OF MATERIAL/ EQUIPMENT |
| 20 | Field Infrastructure |
| 21 | Online Monitoring System for oil filled Transformer/ Reactor (765kV / 400kV) (single phase) as per specification requirements |
| 22 | Online Monitoring System for oil filled Transformer/ Reactor (765kV / 400kV) (Three Phase) as per specification requirements |
| 23 | Fiber Optic (FO) temperature module (as per requirements) |
| 24 | Media Converter |
| 25 | Cables |
| 26 | Power & Control Cables (Armoured) as per the requriement |
| 27 | Cable accessories for Installation |
| 28 | Cable Conduits, tags, trays, joint boxes etc. as required for laying of cables as per standard installation requirements at substations |
| 29 | Miscellaneous Communication Cables |
| 30 | Ethernet CAT6A, Armoured fiber, Co-axial Cable, LIU, switch , connecotors etc. as required for connecting all data acquistion Devices and equipments/ items for completing the work on substations |
| 31 | Earthing |
| 32 | Earthing Strips / Electordes and other items for Earthing of supplied Equipments/ Panels at Substations |
| 33 | Civil Work |
| 34 | Civil Foundation for DGA system |
| 35 | Services required for integration/ interfacing of existing online monitoring system for Transformer/ Reactor |
| 36 | Smart Grid Command & Control Center (s) (Main, Back-up & Regional) |
| 37 | Integration of Online Monitoring System with existing Grid Asset & Plant Monitoring (APM) software at Main Command and Control Centre |
| 38 | Dismantling |
| 39 | Dismantling of old online DGAs |
| 40 | Pre-Implementation [Refer Specification Clause No. 2.1 Vol-II, Part-I] |
| 41 | Pre-implementation Site Survey |
| 42 | Maintenance contract after warranty [Refer Specification Clause No. 2.6 Vol-II, Part-I] |
| 43 | Charges for integration of future online monitoring system during 5-year period after the award of contract [Refer Specification Clause No.4.0 Vol-II, Part-I] |
| 44 | Transformer/ Reactor (765kV / 400kV) (single phase) |
| 45 | Transformer/ Reactor (765kV / 400kV) (Three phase) |
| 46 | Add any other item to complete the Project Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 23 daysJul 31, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 24 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender