Tender For Shifting Of 11 Kv Line(11 Kv Bhadrai Feeder From 33/11 Kv Ncp Dabli Gss)-9.0 Km, Shifting Of 11 Kv Line(11 Kv Piprali Feeder From 33/11 Kv Ncp Chakguda Gss)-3.0 Km, Shifting Of 11 Kv Line(11 Kv Chak Guda Feeder From 33/11 Kv Ncp Chak Guda
Tender Overview
Project Description
Tender for Shifting Of 11 Kv Line(11 Kv Bhadrai Feeder From 33/11 Kv Ncp Dabli Gss)-9.0 Km, Shifting Of 11 Kv Line(11 Kv Piprali Feeder From 33/11 Kv Ncp Chakguda Gss)-3.0 Km, Shifting Of 11 Kv Line(11 Kv Chak Guda Feeder From 33/11 Kv Ncp Chak Guda Gss)-4.67 Km [Total 16.67 Km 11 Kv Line Shifting Work(On 33 Kv Insulation)] Under Aen (Ncp -Ii), Jdvvnl,Sanchore Under Circle Jalore On Labour Rate Basis 2025
BOQ
| Sl. No. | Item Description |
| 1 | PART - A - DISMANTLING WORK Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates. PCC Poles 9 Mtr. Long(400 Kg.)/11Mtr.long. (Note :-Dismatling charges of all items will be 60% of item rates of erection charges as per Chapter 5 & 6 in LRC-2025) |
| 2 | Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.,PCC Poles 9 Mtr. Long (400 Kg)/200 Kg(Note :-Dismatling charges of all items will be 60% of item rates of erection charges as per Chapter 5 & 6 in LRC-2025) |
| 3 | Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware and strips.(Note :-Dismatling charges of all items will be 60% of item rates of erection charges as per Chapter 5 & 6 in LRC-2025) |
| 4 | Fixing of 33kv pin insulator with pins.(Note :-Dismatling charges of all items will be 60% of item rates of erection charges as per Chapter 5 & 6 in LRC-2025) |
| 5 | 11/0.4 KV S/S Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates. PCC Poles 9 Mtr. Long(400 Kg.)/11Mtr.long (Note :-Dismatling charges of all items will be 60% of item rates of erection charges as per Chapter 5 & 6 in LRC-2025) |
| 6 | Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.(B)G.O. switch . without earthing blade.11kv G.O.switch (Note :-Dismatling charges of all items will be 60% of item rates of erection charges as per Chapter 5 & 6 in LRC-2025) |
| 7 | Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. 11kv Horn Gap fuse set.(Note :-Dismatling charges of all items will be 60% of item rates of erection charges as per Chapter 5 & 6 in LRC-2025) |
| 8 | Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire/strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates, 25 and 40 KVA(Note :-Dismatling charges of all items will be 60% of item rates of erection charges as per Chapter 5 & 6 in LRC-2025) |
| 9 | Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire 8\\"x3/4\\" with 7/8 SWG stay wire.(Note :-Dismatling charges of all items will be 60% of item rates of erection charges as per Chapter 5 & 6 in LRC-2025) |
| 10 | Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate. (B) IN RURAL AREA ACSR DOG.(Note :-Dismatling charges of all items will be 50% of item rates of erection charges as per Chapter 7 in LRC-2025) |
| 11 | (c) Transportation of Dismantled material to Nigam Store Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site Within 10 Kms. |
| 12 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. |
| 13 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site Above 30 Kms. Add for each Kms.or part thereof. |
| 14 | Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. Within 10 Kms. |
| 15 | Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. |
| 16 | Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. Above 30 Kms. Add for each Kms. or part thereof. |
| 17 | PART-B - NEW ERECTION WORK Conducting route survey as per approved route map and pegging of route with tee off point section point & double pole locations. |
| 18 | Trimming of tree branches/plants and preparing route approchases for proposed line. |
| 19 | Excavation of pit in soil (ordinary) to erect various supports and stay sets including stacking of excavated soil from the edge of excavation. (A) Height of poles/R.S.Joist/M.S. Rail Size of pit 9 Mtr/ 1.2mx0.6mx1.50 m deep |
| 20 | Excavation of pit in soil (ordinary) to erect various supports and stay sets including stacking of excavated soil from the edge of excavation. (B) Lattice Tower /Size of pit 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep |
| 21 | Excavation of pit in soil (ordinary) to erect various supports and stay sets including stacking of excavated soil from the edge of excavation. (C)Stay set/Depth of pit 8'x 3/4\\" -0.75x0.5x1.6 m |
| 22 | Safe carriage of PCC poles including loading / un-loading a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole Within 10 Kms. |
| 23 | Safe carriage of PCC poles including loading / un-loading a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. |
| 24 | Safe carriage of PCC poles including loading / un-loading a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole Above 30 Kms. Add for each Kms. or part thereof. |
| 25 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site Within 10 Kms. |
| 26 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. |
| 27 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site Above 30 Kms. Add for each Kms.or part thereof. |
| 28 | Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. Within 10 Kms. |
| 29 | Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. |
| 30 | Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. Above 30 Kms. Add for each Kms. or part thereof. |
| 31 | Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site. Within 10 Kms. |
| 32 | Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site. Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. |
| 33 | Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site. Above 30 Kms. Add for each Kms or part thereof. |
| 34 | Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra. Lattice Structure |
| 35 | Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates. PCC Poles 9 Mtr. Long (400 Kg)/200 Kg |
| 36 | Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates. PCC Poles 9 Mtr. Long(400 Kg.)/11Mtr.long |
| 37 | Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire 8\\"x3/4\\" with 7/8 SWG stay wire |
| 38 | Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base. (for TOWER -1.2*1.2*2.1= 3.024CUM per Tower X 15 Nos = 45.36 CUM ) |
| 39 | Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates, 33 KV line |
| 40 | Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing ofhardware andstrips. |
| 41 | Fixing of 33kv pin insulator with pins. |
| 42 | Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate. (B) IN RURAL AREA ACSR DOG |
| 43 | Laying , jointing,stringing,tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc.including proper binding at each end.The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. (B) IN RURAL AREA G.I.Earth wire 6 SWG |
| 44 | 11/0.4 KV S/S Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates. PCC Poles 9 Mtr. Long(400 Kg.)/11Mtr.long |
| 45 | Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. (B)G.O. switch . without earthing blade. 11kv G.O.switch |
| 46 | Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. 11kv Horn Gap fuse set. |
| 47 | Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire/strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates, 25 and 40 KVA |
| 48 | Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom) |
| 49 | Earthing of 11/0.4 KV distribution transformer /sub-station with 3 pieces of M.S.Rod 20mm dia each 3 meter long and driving them into earth by mechanical means at a distance as per approved design & drawing & specification.The work includes flattening of top ends of M.S.rod drilling a hole of 9/16\\" dia.at flattened top and tightening of M.S.flat 50x6mm (having 3 hole 2ends and 1mm middle) with nuts and bolts with M.S.rods top end hole.The flat will also be welded with M.S.rod.The end will be connected to equipments as under in sequence. |
| 50 | M.S. NUT-BOLTS 5/8\\" DIA Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender