Tender For O&M - Water Supply Schemes-Twss 75Mld Amrut Wtp-75 Mld Amrut Water Treatment Plant At Aruvikkara Operation And Maintenance For 3 Years -General Civil Work-Pipeline Work
Tender Overview
Project Description
Tender for O&M - Water Supply Schemes-Twss 75Mld Amrut Wtp-75 Mld Amrut Water Treatment Plant At Aruvikkara Operation And Maintenance For 3 Years -General Civil Work-Pipeline Work
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 14-Jul-2026 | Technical Corrigendum | Technical Bid | 20-Jul-2026 |
| 2 | 21-Jul-2026 | Extension corrigendum | Date | 27-Jul-2026 |
| 3 | 14-Jul-2026 | Technical Corrigendum | Technical Bid | 27-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | 1st Year - Supply of Man power for O & M of 75 MLD Water Treatment Plant, Intake, Pumping stations and other units |
| 2 | OD310240/2025-2026:Engaging Plant Manager for the Administrative and Technical control of the plant. |
| 3 | OD310238/2025-2026:Engaging SCADA Operator for upkeeping and maintenance of SCADA in the plant. |
| 4 | OD310231/2025-2026:Engaging Process Chemist for ensuring water quality by testing raw & treated water and thereby fixing dosage of chemicals. |
| 5 | OD310236/2025-2026:Engaging Instrumentation Technician for the maintenance of all Instrumentation equipment in the plant and pumphouses. |
| 6 | OD310241/2025-2026:Engaging Operators for the operation of pumps, valves and other mechanical equipment and also for the addition of required chemicals. |
| 7 | OD310237/2025-2026:Engaging Electrician for maintenance of all Electrical equipment |
| 8 | OD310235/2025-2026:Engaging Plumber/Fitter for maintenance of Valves and Pipes in Plant and Pumphouses. |
| 9 | OD310234/2025-2026:Engaging Mechanic for preventive and breakdown maintenance of all mechanical equipment in Plant and Pumphouses. |
| 10 | OD310233/2025-2026:Engaging Shift Assistant for washing of Filter beds, preparation of chemicals and upkeeping of plant. |
| 11 | OD310239/2025-2026:Engaging Sweeper for sweeping and cleaning Plant and premises |
| 12 | OD310232/2025-2026:Engaging Security Guard for Plant |
| 13 | OD310242/2025-2026:Engaging Gardener for gardening in the plant premises |
| 14 | 1st Year Periodical cleaning of Lamella Clarifiers, Leading Channels, other unit structures, etc., Labour charges for replacement of spares, Cost of consumables, Hire charges/cost of tools & plants, safety equipments, manure for gardening, etc |
| 15 | OD310220/2025-2026:Periodical cleaning of Lamella clarifier and other connected accessories by engaging man coolies including removal of algae and cleaning the side walls, channels and bottom etc thoroughly using coir /fibre brush and desilting without making any damages to the structure including operating the valves/shutters etc complete as per the direction of departmental officers |
| 16 | OD310219/2025-2026:Periodical cleaning of leading channel at the inlet point and other connected accessories, by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete |
| 17 | OD310225/2025-2026:Periodical cleaning of Clear water Sump, OHSR, Used Wash water Tank, OH Wash water reservoir, Sludge thickener, etc by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete. |
| 18 | OD310223/2025-2026:Periodical cutting of bushes in the WTP site, cleaning the site and disposal of bushes to a suitable location inside the site etc complete. |
| 19 | OD310226/2025-2026:Cost of consumables such as cotton waste, grease, gland ropes etc |
| 20 | OD310229/2025-2026:Cost of manure for gardening, hire charges for gardening tools, fuel/electric operated lawn mover, including cost of fuel for the proper maintenance of garden and premises |
| 21 | OD310227/2025-2026:Cost of all cleaning materials for using in the plant, pumphouses and office such as Brooms, Brushes, Soap, Hand wash, floor cleaning liquids, Sanitizer, Disinfectants, Tissues etc. |
| 22 | OD310228/2025-2026:Cost for safety equipment such as helmets, safety shoes, jackets, safety belts, self-contained breathing apparatus, refilling of fire extinguisher, safety masks, first aid kits etc complete. |
| 23 | 1st Year - Periodical Painting of all Civil structures and Electro-Mechanical equipments including pipelines after scrapping & cleaning and applying a priming coat, wherever required. |
| 24 | 13.48.2:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.75 ltr/10 sqm of approved brand and manufacture |
| 25 | OD310217/2025-2026:Wall painting on exterior walls with Acryllic exterior emulsion paint of approved brand (two coats over old surfaces) to give an even shade after scrapping and cleaning the surfaces.(Once in 3 years, ie. 33.33% of the remaining area every year) |
| 26 | OD310218/2025-2026:Painting on metal and wooden surfaces with Synthetic enamel paint of approved brand (one coat over old surfaces) after scraping and cleaning the surfaces. (Once in 3 years, ie. 33.3% of the remaining area every year) |
| 27 | 1st year - Supply of Chemicals for 75 MLD Water Treatment Plant for production of required quality and quantity of water as per designed capacity |
| 28 | OD310211/2025-2026:Supply and delivery of Class IV Alum at 10 PPM dosage-Sampling and testing of the materials will beconducted as per the<br>method prescribed in IS: 299/2012 (Alum Grade IV) with latest amendment. |
| 29 | OD310209/2025-2026:Supply and delivery of Hydrated lime as per specification at 10 PPM dosage |
| 30 | OD310210/2025-2026:Supply of liquid chlorine in Tonner Cylinders at dosage 3.2 PPM with all approvals |
| 31 | OD310324/2025-2026: Providing testing of chemicals and water quality, inspection charges payable to other agencies, conveyance charge payable to plant manager for his journey out side the plant area(to city |
| 32 | 1st Year Top up Filter Media |
| 33 | 100.55.5:Removing filter media from the filter beds without making any damages to the existing structures and back manifolds and stacking at a safe and convenient place for segregation process and as per the directions of the department officers etc. complete. |
| 34 | 100.55.4:Supplying and stacking for measurement of filter sand having effective size 0.45 to 0.70 mm and uniformity coefficient 1.30 to 1.7, of specific gravity in the range of 2.55 - 2.65 and hard and clean, free from clay, dust and other impurities including cost of materials, labour charges and conveyance of materials up to 5 km and as per the directions of the department officers etc. complete and as per CPHEEO specification. |
| 35 | 1st Year -Electrical work |
| 36 | OD310344/2025-2026:Rewinding Stator/Rotor of 400kW/537HP 960RPM AQUA make 3.3kV Submersible motor at Raw water pump house - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. |
| 37 | OD310345/2025-2026:Rewinding Stator/Rotor of 450kW/604HP 744 RPM 3.3kV motor at Raw water pump house - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. |
| 38 | OD310346/2025-2026:Rewinding Stator/Rotor of 350kW 1460 RPM 3.3kV motor at Clear water pump house - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. |
| 39 | OD310370/2025-2026:Repair and maintenance of Lecon Pluss make 3.3kV, 450/400/350kW FCMA soft starter - including fcma reactor(magnetic core and winding), power/bypass contactors, protection relays, control wirings and auxiliaries |
| 40 | OD310401/2025-2026:Rewinding Stator of 0.5HP to 5HP motor including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. |
| 41 | OD310471/2025-2026:Rewinding Stator of 10/15HP motor including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. |
| 42 | OD310482/2025-2026:Rewinding Stator 40HP motor - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. |
| 43 | OD310575/2025-2026:Repair/ maintennace of Reduction gear box having ratio 15:1/70:1/50:1- including routine inspection, preventive maintenance, lubrication, alignment, and servicing of the reduction gear unit coupled with a motor as per direction of departmental officers |
| 44 | OD310584/2025-2026:Maintenance of 2.3KVA,3KVA,3.5VA Inverter at Office block- including routine inspection, preventive maintenance, testing, and servicing of the 2300VA ,3000VA,3500VA inverter installed at the office block |
| 45 | OD310604/2025-2026:Repair, preventive maintenance, inspection, testing , oili fiteration and servicing of the 11 kV/433V, 400 kVA transformer at WTP - including Visual inspection of transformer body, bushings, gaskets, and foundation, Checking of oil level, oil leakage, and condition of silica gel breather, Testing of protective relays and oil temperature indicators. |
| 46 | OD310605/2025-2026:Repair, preventive maintenance, inspection, testing oil fileration and servicing of the 11/3.3 kV, 1250 kVA transformer at WTP - including Visual inspection of transformer body, bushings, gaskets, and foundation, Checking of oil level, oil leakage, and condition of silica gel breather, Testing of protective relays and oil temperature indicators. |
| 47 | OD310606/2025-2026:Repair, preventive maintenance, inspection, testing oil fileration and servicing of the 11/3.3 kV, 1000 kVA transformer at RWPH - including Visual inspection of transformer body, bushings, gaskets, and foundation, Checking of oil level, oil leakage, oil filtering and condition of silica gel breather, Testing of protective relays and oil temperature indicators. |
| 48 | OD310609/2025-2026:Toping up and replacement of Transformer oil for 11/3.3 kV, 1000 kVA transformer at RWPH and 11/3.3 kV, 1250 kVA transformer & 3.3 kV/433V, 400 kVA transformer at WTP |
| 49 | OD310624/2025-2026:Repair and maintenance of Capacitor bank with automatic power factor controller 514.25kVAR, 3.63kV (ie 425kVAR 3.3kV) installed for 4 X 350kW motors on 3.3kV Bus at MSB-1 - WTP |
| 50 | OD310625/2025-2026:Repair and maintenance of Capacitor bank with automatic power factor controller 423.5kVAR, 3.63kV (ie 350kVAR 3.3kV) installed for 450 +400 kW motors on 3.3kV Bus at MSB - RWPH |
| 51 | OD310635/2025-2026:Repair and maintenance of 50kW solar power plant including routine cleaning of PV modules, inverter, DC/AC cabling, junction boxes, mounting structures , control systems. |
| 52 | OD310658/2025-2026:Repair and maintenance of VFD(variable frequency drive) including visual inspection, cleaning and tightening of all electrical and control connections, checking and testing of power modules, control boards and I/O components, verification of drive parameters, protection settings, functional testing of motor start/stop, speed control and fault diagnostics, preventive trouble shooting works. |
| 53 | OD310659/2025-2026:Repair and maintenance of star delta starter including visual inspection, cleaning and tightening of all electrical and mechanical connections, functional testing of main and auxiliary contactors, verification of timer settings and relay operations, verification of control wirings and fuses. |
| 54 | OD310660/2025-2026:Repair and maintenance of DOL (direct on line) starter including visual inspection, cleaning and tightening of all electrical and mechanical connections, testing relay operations, verification of control wirings and fuses |
| 55 | 1st Year Provisional sum for emergency repair works and miscellaneous expenses for three years (10 Lakhs every year) |
| 56 | OD310243/2025-2026:Provisional sum for procurement of spare(if not available in KWA stock) and to meet the emergency services such as repair including rewinding of HT motors of intake ans WTP repaires to pumpset in inyake and WTP repaires ti EOT crane,vaccum pump set and electrical switch gears in the locations,repairs to raw and treated water pumping line,repairs to valve and flow meters and testing of chemicals and water quality,inspection charges payable to other agencies,conveyance charges payable to plant manager for his journey ouside the plant area (to city),cost of stationary,SCADA report generation, uniforms to employees etc (for each year Rs.30,00,000/-). |
| 57 | 2nd Year - Supply of Man power for O & M of 75 MLD Water Treatment Plant, Intake, Pumping stations and other units |
| 58 | OD310257/2025-2026:Engaging Plant Manager for the Administrative and Technical control of the plant. (2nd year) |
| 59 | OD310264/2025-2026:Engaging SCADA Operator for upkeeping and maintenance of SCADA in the plant. (2nd year) |
| 60 | OD310258/2025-2026:Engaging Process Chemist for ensuring water quality by testing raw & treated water and thereby fixing dosage of chemicals. (2nd Year) |
| 61 | OD310265/2025-2026:Engaging Instrumentation Technician for the maintenance of all Instrumentation equipment in the plant and pumphouses. (2nd year) |
| 62 | OD310263/2025-2026:Engaging Operators for the operation of pumps, valves and other mechanical equipment and also for the addition of required chemicals.(2nd year) |
| 63 | OD310260/2025-2026:Engaging Electrician for maintenance of all Electrical equipment (2nd year) |
| 64 | OD310266/2025-2026:Engaging Plumber/Fitter for maintenance of Valves and Pipes in Plant and Pumphouses. (2nd year) |
| 65 | OD310268/2025-2026:Engaging Mechanic for preventive and breakdown maintenance of all mechanical equipment in Plant and Pumphouses.(2nd year) |
| 66 | OD310259/2025-2026:Engaging Shift Assistant for washing of Filter beds, preparation of chemicals and upkeeping of plant. (2nd year) |
| 67 | OD5374/2026-2027:Engaging Sweeper for sweeping and cleaning Plant and premises (2nd year) |
| 68 | OD310267/2025-2026:Engaging Security Guard for Plant (2nd year) |
| 69 | OD310262/2025-2026:Engaging Gardener for gardening in the plant premises (2nd year). |
| 70 | 2nd year - Periodical cleaning of Lamella Clarifiers |
| 71 | OD310248/2025-2026:Periodical cleaning of Lamella clarifier and other connected accessories by engaging man coolies including removal of algae and cleaning the side walls, channels and bottom etc thoroughly using coir /fibre brush and desilting without making any damages to the structure including operating the valves/shutters etc complete as per the direction of departmental officers |
| 72 | OD310247/2025-2026:Periodical cleaning of leading channel at the inlet point and other connected accessories, by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete |
| 73 | OD310245/2025-2026:Periodical cleaning of Clear water Sump, OHSR, Used Wash water Tank, OH Wash water reservoir, Sludge Balancing tank, Sludge thickener, etc by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete. |
| 74 | OD310256/2025-2026:Periodical cutting of bushes in the , cleaning the site and disposal of bushes to a suitable location inside the site etc complete. |
| 75 | OD310253/2025-2026:Cost of consumables such as cotton waste, grease, gland ropes etc |
| 76 | OD310252/2025-2026:Cost of manure for gardening, hire charges for gardening tools, fuel/electric operated lawn mover, including cost of fuel for the proper maintenance of garden and premises |
| 77 | OD310246/2025-2026:Cost for safety equipment such as helmets, safety shoes, jackets, safety belts, self-contained breathing apparatus, refilling of fire extinguisher, safety masks, first aid kits etc complete. |
| 78 | OD310784/2025-2026:Cost of all cleaning materials for using in the plant, pumphouses and office such as Brooms, Brushes, Soap, Hand wash, floor cleaning liquids, Sanitizer, Disinfectants, Tissues etc. |
| 79 | OD310255/2025-2026:Hire Charges for Tools and Plants required for the day to day operation of the Plant and Equipment |
| 80 | 2nd year - Periodical Painting of all Civil structures and Electro-Mechanical equipments including pipelines after scrapping & cleaning and applying a priming coat, wherever required. |
| 81 | 13.48.2:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.75 ltr/10 sqm of approved brand and manufacture |
| 82 | OD310296/2025-2026:Wall painting on exterior walls with Acryllic exterior emulsion paint of approved brand (two coats over old surfaces) to give an even shade after scrapping and cleaning the surfaces.(Once in 3 years, ie. 33.33% of the remaining area every year) |
| 83 | OD310299/2025-2026:Painting on metal and wooden surfaces with Synthetic enamel paint of approved brand (one coat over old surfaces) after scraping and cleaning the surfaces. (Once in 3 years, ie. 35% of the remaining area every year) |
| 84 | 2nd Year - Supply of Chemicals for 75 MLD Water Treatment Plant for production of required quality and quantity of water as per designed capacity |
| 85 | OD310271/2025-2026:Supply and delivery of Class IV Alum at 10 PPM dosage-Sampling and testing of the materials will beconducted as per themethod prescribed in IS: 299/2012 (Alum Grade IV) with latest amendment. |
| 86 | OD310272/2025-2026:Supply and delivery of Hydrated lime as per specification at 10 PPM dosage |
| 87 | OD310270/2025-2026:Supply of liquid chlorine in Tonner Cylinders at dosage 3.2 PPM |
| 88 | OD317380/2025-2026:Providing testing of chemicals and water quality, inspection charges payable to other agencies, conveyance charge payable to plant manager for his journey out side the plant area(to city |
| 89 | 2nd Year Top up Filter Media |
| 90 | 100.55.5:Removing filter media from the filter beds without making any damages to the existing structures and back manifolds and stacking at a safe and convenient place for segregation process and as per the directions of the department officers etc. complete. |
| 91 | 100.55.4:Supplying and stacking for measurement of filter sand having effective size 0.45 to 0.70 mm and uniformity coefficient 1.30 to 1.7, of specific gravity in the range of 2.55 - 2.65 and hard and clean, free from clay, dust and other impurities including cost of materials, labour charges and conveyance of materials up to 5 km and as per the directions of the department officers etc. complete and as per CPHEEO specification. |
| 92 | 2nd year - Electrical Works |
| 93 | OD33474/2026-2027:Rewinding Stator/Rotor of 400kW/537HP 960RPM AQUA make 3.3kV Submersible motor at Raw water pump house - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 2nd year |
| 94 | OD310799/2025-2026:Rewinding Stator/Rotor of 450kW/604HP 744 RPM 3.3kV motor at Raw water pump house - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 2nd year |
| 95 | OD33639/2026-2027:Rewinding Stator/Rotor of 350kW 1460 RPM 3.3kV motor at Clear water pump house - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete.2nd year |
| 96 | OD41805/2026-2027:Repair and maintenance of Lecon Pluss make 3.3kV, 450/400/350kW FCMA soft starter - including fcma reactor(magnetic core and winding), power/bypass contactors, protection relays, control wirings and auxiliaries2nd year |
| 97 | OD33652/2026-2027:Rewinding Stator of 0.5HP to 5HP motor including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 2nd year |
| 98 | OD33717/2026-2027:Rewinding Stator of 10/15HP motor including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 2nd year |
| 99 | OD33718/2026-2027:Rewinding Stator 40HP motor - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 2nd year |
| 100 | OD42124/2026-2027:Repair/ maintennace of Reduction gear box having ratio 15:1/70:1/50:1- including routine inspection, preventive maintenance, lubrication, alignment, and servicing of the reduction gear unit coupled with a motor as per direction of departmental officers. 2nd year |
| 101 | OD42844/2026-2027:Maintenance of 2.3KVA,3KVA,3.5VA Inverter at Office block- including routine inspection, preventive maintenance, testing, and servicing of the 2300VA ,3000VA,3500VA inverter installed at the office block. 2nd year |
| 102 | OD33722/2026-2027:Repair, preventive maintenance, inspection, testing , oili fiteration and servicing of the 11 kV/433V, 400 kVA transformer at WTP - including Visual inspection of transformer body, bushings, gaskets, and foundation, Checking of oil level, oil leakage, and condition of silica gel breather, Testing of protective relays and oil temperature indicators. 2nd year |
| 103 | OD33726/2026-2027:Repair, preventive maintenance, inspection, testing oil fileration and servicing of the 11/3.3 kV, 1250 kVA transformer at WTP - including Visual inspection of transformer body, bushings, gaskets, and foundation, Checking of oil level, oil leakage, and condition of silica gel breather, Testing of protective relays and oil temperature indicators. 2n year |
| 104 | OD33756/2026-2027:Repair, preventive maintenance, inspection, testing oil fileration and servicing of the 11/3.3 kV, 1000 kVA transformer at RWPH - including Visual inspection of transformer body, bushings, gaskets, and foundation, Checking of oil level, oil leakage, oil filtering and condition of silica gel breather, Testing of protective relays and oil temperature indicators. 2nd year |
| 105 | OD310825/2025-2026:Toping up and replacement of Transformer oil for 11/3.3 kV, 1000 kVA transformer at RWPH and 11/3.3 kV, 1250 kVA transformer & 3.3 kV/433V, 400 kVA transformer at WTP 2nd year |
| 106 | OD33790/2026-2027:Repair and maintenance of Capacitor bank with automatic power factor controller 514.25kVAR, 3.63kV (ie 425kVAR 3.3kV) installed for 4 X 350kW motors on 3.3kV Bus at MSB-1 - WTP. 2nd year |
| 107 | OD33802/2026-2027:Repair and maintenance of Capacitor bank with automatic power factor controller 423.5kVAR, 3.63kV (ie 350kVAR 3.3kV) installed for 450 +400 kW motors on 3.3kV Bus at MSB - RWPH. 2nd year |
| 108 | OD33805/2026-2027:Repair and maintenance of 50kW solar power plant including routine cleaning of PV modules, inverter, DC/AC cabling, junction boxes, mounting structures , control systems. 2nd year |
| 109 | OD42989/2026-2027:Repair and maintenance of VFD(variable frequency drive) including visual inspection, cleaning and tightening of all electrical and control connections, checking and testing of power modules, control boards and I/O components, verification of drive parameters, protection settings, functional testing of motor start/stop, speed control and fault diagnostics, preventive trouble shooting works. 2nd year |
| 110 | OD43050/2026-2027:Repair and maintenance of star delta starter including visual inspection, cleaning and tightening of all electrical and mechanical connections, functional testing of main and auxiliary contactors, verification of timer settings and relay operations, verification of control wirings and fuses.2 nd year |
| 111 | OD43145/2026-2027:Repair and maintenance of DOL (direct on line) starter including visual inspection, cleaning and tightening of all electrical and mechanical connections, testing relay operations, verification of control wirings and fuses 2nd year |
| 112 | 2nd year - Provisional sum for emergency repair works and miscellaneous expenses for three years (10 Lakhs every year) |
| 113 | OD310273/2025-2026:Provisional sum for procurement of spare(if not available in KWA stock) and to meet the emergency services such as repair including rewinding of HT motors of intake ans WTP repaires to pumpset in inyake and WTP repaires ti EOT crane,vaccum pump set and electrical switch gears in the locations,repairs to raw and treated water pumping line,repairs to valve and flow meters and testing of chemicals and water quality,inspection charges payable to other agencies,conveyance charges payable to plant manager for his journey ouside the plant area (to city),cost of stationary,SCADA report generation, uniforms to employees etc (for each year Rs.30,00,000/-). |
| 114 | 3rd year - Supply of Man power for O & M of 75 MLD Water Treatment Plant, Intake, Pumping stations and other units |
| 115 | OD310302/2025-2026:Engaging Plant Manager for the Administrative and Technical control of the plant. (3rd year) |
| 116 | OD310307/2025-2026:Engaging SCADA Operator for upkeeping and maintenance of SCADA in the plant. (3rd year) |
| 117 | OD310313/2025-2026:Engaging Process Chemist for ensuring water quality by testing raw & treated water and thereby fixing dosage of chemicals. (3rd Year) |
| 118 | OD310311/2025-2026:Engaging Instrumentation Technician for the maintenance of all Instrumentation equipment in the plant and pumphouses. (3rd year) |
| 119 | OD310306/2025-2026:Engaging Operators for the operation of pumps, valves and other mechanical equipment and also for the addition of required chemicals.(3rd year) |
| 120 | OD310309/2025-2026:Engaging Electrician for maintenance of all Electrical equipment (3rd year) |
| 121 | OD310304/2025-2026:Engaging Plumber/Fitter for maintenance of Valves and Pipes in Plant and Pumphouses. (3rd year) |
| 122 | OD310308/2025-2026:Engaging Mechanic for preventive and breakdown maintenance of all mechanical equipment in Plant and Pumphouses.(3rd year) |
| 123 | OD310312/2025-2026:Engaging Shift Assistant for washing of Filter beds, preparation of chemicals and upkeeping of plant. (3rd year) |
| 124 | OD310303/2025-2026:Engaging Sweeper for sweeping and cleaning Plant and premises (3rd year) |
| 125 | OD310310/2025-2026:Engaging Security Guard for Plant (3rd year) |
| 126 | OD310305/2025-2026:Engaging Gardener for gardening in the plant premises (3rd year). |
| 127 | 3rd year - P.Periodical cleaning of Lamella Clarifiers, Leading Channels, other unit structures, etc., Labour charges for replacement of spares, Cost of consumables, Hire charges/cost of tools & plants, safety equipment, manure for gardening, etC |
| 128 | OD310288/2025-2026:Periodical cleaning of Lamella clarifier and other connected accessories by engaging man coolies including removal of algae and cleaning the side walls, channels and bottom etc thoroughly using coir /fibre brush and desilting without making any damages to the structure including operating the valves/shutters etc complete as per the direction of departmental officers- 3rd year |
| 129 | OD310290/2025-2026:Periodical cleaning of leading channel at the inlet point and other connected accessories, by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete |
| 130 | OD310294/2025-2026:Periodical cleaning of Clear water Sump, OHSR, Used Wash water Tank, OH Wash water reservoir, Sludge Balancing tank, Sludge thickener, etc by engaging man coolies including removal of algae thoroughly using coir or fibre brush without making any damages to the structures and disposing it off the premises including operating of the valves /shutters for admitting /scour purposes etc complete. |
| 131 | OD310287/2025-2026:Periodical cutting of bushes in the site, cleaning the site and disposal of bushes to a suitable location inside the site etc complete. |
| 132 | OD310284/2025-2026:Cost of manure for gardening, hire charges for gardening tools, fuel/electric operated lawn mover, including cost of fuel for the proper maintenance of garden and premises |
| 133 | OD310286/2025-2026:Cost of consumables such as cotton waste, grease, gland ropes etc - 3rd year |
| 134 | OD310289/2025-2026:Cost of all cleaning materials for using in the plant, pumphouses and office such as Brooms, Brushes, Soap, Hand wash, floor cleaning liquids, Sanitizer, Disinfectants, Tissues etc. |
| 135 | OD310283/2025-2026:Cost for safety equipment such as helmets, safety shoes, jackets, safety belts, self-contained breathing apparatus, refilling of fire extinguisher, safety masks, first aid kits etc complete. |
| 136 | 3rd year - Periodical Painting of all Civil structures and Electro-Mechanical equipments including pipelines after scrapping & cleaning and applying a priming coat, wherever required |
| 137 | 13.48.2:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.75 ltr/10 sqm of approved brand and manufacture |
| 138 | OD310278/2025-2026:Wall painting on exterior walls with Acryllic exterior emulsion paint of approved brand (two coats over old surfaces) to give an even shade after scrapping and cleaning the surfaces.(Once in 3 years, ie. 33.33% of the remaining area every year) - 3rd year |
| 139 | OD310282/2025-2026:Painting on metal and wooden surfaces with Synthetic enamel paint of approved brand (one coat over old surfaces) after scraping and cleaning the surfaces. (Once in 3 years, ie. 35% of the remaining area every year) - 3rd year |
| 140 | 3rd year - Supply of Chemicals for 75 MLD Water Treatment Plant for production of required quality and quantity of water as per designed capacity |
| 141 | OD310275/2025-2026:Supply and delivery of Class IV Alum at 10 PPM dosage-Sampling and testing of the materials will beconducted as per themethod prescribed in IS: 299/2012 (Alum Grade IV) with latest amendment - 3rd year |
| 142 | OD310277/2025-2026:Supply and delivery of Hydrated lime as per specification at 10 PPM dosage - 3rd year |
| 143 | OD310276/2025-2026:Supply of liquid chlorine in Tonner Cylinders at dosage 3.2 PPM - 3rd year |
| 144 | OD317396/2025-2026:Providing testing of chemicals and water quality, inspection charges payable to other agencies, conveyance charge payable to plant manager for his journey out side the plant area(to city |
| 145 | 3rd Year Top up Filter Media |
| 146 | 100.55.5:Removing filter media from the filter beds without making any damages to the existing structures and back manifolds and stacking at a safe and convenient place for segregation process and as per the directions of the department officers etc. complete. |
| 147 | 100.55.4:Supplying and stacking for measurement of filter sand having effective size 0.45 to 0.70 mm and uniformity coefficient 1.30 to 1.7, of specific gravity in the range of 2.55 - 2.65 and hard and clean, free from clay, dust and other impurities including cost of materials, labour charges and conveyance of materials up to 5 km and as per the directions of the department officers etc. complete and as per CPHEEO specification. |
| 148 | 3rd Year -Electrical work |
| 149 | OD33820/2026-2027:Rewinding Stator/Rotor of 400kW/537HP 960RPM AQUA make 3.3kV Submersible motor at Raw water pump house - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 3rd Year |
| 150 | OD34058/2026-2027:Rewinding Stator/Rotor of 450kW/604HP 744 RPM 3.3kV motor at Raw water pump house - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 3rd year |
| 151 | OD34059/2026-2027:Rewinding Stator/Rotor of 350kW 1460 RPM 3.3kV motor at Clear water pump house - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 3rd year |
| 152 | OD34060/2026-2027:Repair and maintenance of Lecon Pluss make 3.3kV, 450/400/350kW FCMA soft starter - including fcma reactor(magnetic core and winding), power/bypass contactors, protection relays, control wirings and auxiliaries 3r year |
| 153 | OD34062/2026-2027:Rewinding Stator of 0.5HP to 5HP motor including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 3rd year |
| 154 | OD34064/2026-2027:Rewinding Stator of 10/15HP motor including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 3rd year |
| 155 | OD34065/2026-2027:Rewinding Stator 40HP motor - including dismantling, conveying, rewinding, replacing the bearing and testing the motor after assembling at site. The rate is inclusive of all labour charges and materials including copper, insulation, lead wire, varnish, bearing etc and deducting the scrap value of the copper wire etc complete. 3rd year |
| 156 | OD34066/2026-2027:Repair/ maintennace of Reduction gear box having ratio 15:1/70:1/50:1- including routine inspection, preventive maintenance, lubrication, alignment, and servicing of the reduction gear unit coupled with a motor as per direction of departmental officers. 3rd year |
| 157 | OD34067/2026-2027:Maintenance of 2.3KVA,3KVA,3.5VA Inverter at Office block- including routine inspection, preventive maintenance, testing, and servicing of the 2300VA ,3000VA,3500VA inverter installed at the office block. 3rd year |
| 158 | OD34068/2026-2027:Repair, preventive maintenance, inspection, testing , oili fiteration and servicing of the 11 kV/433V, 400 kVA transformer at WTP - including Visual inspection of transformer body, bushings, gaskets, and foundation, Checking of oil level, oil leakage, and condition of silica gel breather, Testing of protective relays and oil temperature indicators. 3rd year |
| 159 | OD34070/2026-2027:Repair, preventive maintenance, inspection, testing oil fileration and servicing of the 11/3.3 kV, 1250 kVA transformer at WTP - including Visual inspection of transformer body, bushings, gaskets, and foundation, Checking of oil level, oil leakage, and condition of silica gel breather, Testing of protective relays and oil temperature indicators. 3rd year |
| 160 | OD34072/2026-2027:Repair, preventive maintenance, inspection, testing oil fileration and servicing of the 11/3.3 kV, 1000 kVA transformer at RWPH - including Visual inspection of transformer body, bushings, gaskets, and foundation, Checking of oil level, oil leakage, oil filtering and condition of silica gel breather, Testing of protective relays and oil temperature indicators. 3rd year |
| 161 | OD34075/2026-2027:Toping up and replacement of Transformer oil for 11/3.3 kV, 1000 kVA transformer at RWPH and 11/3.3 kV, 1250 kVA transformer & 3.3 kV/433V, 400 kVA transformer at WTP. 3rd year |
| 162 | OD34076/2026-2027:Repair and maintenance of Capacitor bank with automatic power factor controller 514.25kVAR, 3.63kV (ie 425kVAR 3.3kV) installed for 4 X 350kW motors on 3.3kV Bus at MSB-1 - WTP. 3rd year |
| 163 | OD34077/2026-2027:Repair and maintenance of Capacitor bank with automatic power factor controller 423.5kVAR, 3.63kV (ie 350kVAR 3.3kV) installed for 450 +400 kW motors on 3.3kV Bus at MSB - RWPH. 3rd year |
| 164 | OD34078/2026-2027:Repair and maintenance of 50kW solar power plant including routine cleaning of PV modules, inverter, DC/AC cabling, junction boxes, mounting structures , control systems. 3rd year |
| 165 | OD34079/2026-2027:Repair and maintenance of VFD(variable frequency drive) including visual inspection, cleaning and tightening of all electrical and control connections, checking and testing of power modules, control boards and I/O components, verification of drive parameters, protection settings, functional testing of motor start/stop, speed control and fault diagnostics, preventive trouble shooting works. 3rd year |
| 166 | OD34082/2026-2027:Repair and maintenance of star delta starter including visual inspection, cleaning and tightening of all electrical and mechanical connections, functional testing of main and auxiliary contactors, verification of timer settings and relay operations, verification of control wirings and fuses.3rd year |
| 167 | OD34083/2026-2027:Repair and maintenance of DOL (direct on line) starter including visual inspection, cleaning and tightening of all electrical and mechanical connections, testing relay operations, verification of control wirings and fuses 3rde year |
| 168 | 3rd year - Provisional sum for emergency repair works and miscellaneous expenses for three years (10 Lakhs every year) |
| 169 | OD310244/2025-2026:Provisional sum for procurement of spare(if not available in KWA stock) and to meet the emergency services such as repair including rewinding of HT motors of intake ans WTP repaires to pumpset in inyake and WTP repaires ti EOT crane,vaccum pump set and electrical switch gears in the locations,repairs to raw and treated water pumping line,repairs to valve and flow meters and testing of chemicals and water quality,inspection charges payable to other agencies,conveyance charges payable to plant manager for his journey ouside the plant area (to city),cost of stationary,SCADA report generation, uniforms to employees etc (for each year Rs.30,00,000/-). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender