Tender For General-Pwd Quarters At Jawahar Nagar And Harihar Nagar- Routine Maintenance Contract Works-Running Contract Works -Ngo Quarters At Harihar Nagar And Go Quarters At Jawaharnagar- First Phase For The Year 2026-27-General Civil Work
Tender Overview
Project Description
Tender for General-Pwd Quarters At Jawahar Nagar And Harihar Nagar- Routine Maintenance Contract Works-Running Contract Works -Ngo Quarters At Harihar Nagar And Go Quarters At Jawaharnagar- First Phase For The Year 2026-27-General Civil Work
BOQ
| Sl. No. | Item Description |
| 1 | CIVIL WORKS |
| 2 | OD65491/2026-2027:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) |
| 3 | OD65490/2026-2027:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) |
| 4 | OD65489/2026-2027:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) |
| 5 | OD65488/2026-2027:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) |
| 6 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth |
| 7 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth |
| 8 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth |
| 9 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth |
| 10 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 11 | OD24516/2026-2027:Removing Arayal and other tree growth from roof of the building and applying chemicals to kill the roots to prevent further growth etc as per directions in charge |
| 12 | OD24517/2026-2027:Engaging coolie for Drain cleaning and other allied works |
| 13 | OD24515/2026-2027:Engaging Carpenter |
| 14 | 12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) |
| 15 | 12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). |
| 16 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 17 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 18 | 5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars |
| 19 | OD24518/2026-2027:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender