Tender For Bench Development For Temporary Field Hostel/Residential Building At Gaa Village For Kamala He Project (1720Mw), Arunachal Pradesh
Tender Value
61.54 Lakhs
Estimated cost
Bid Submission
21 Jul 2026
5 days left
EMD
1.23 Lakhs
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Lower Subansiri → Arunachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Bench Development For Temporary Field Hostel/Residential Building At Gaa Village For Kamala He Project (1720Mw), Arunachal Pradesh
BOQ
| Sl. No. | Item Description |
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs,saplings and trees girth upto 300mm, removal of stumps of trees cutearlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned,upto a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.In the area of Throny Jungle |
| 2 | Excavation in Hill Area in Soil by Mechanical Means (Dipositing of excavated earth with all lifts and lead upto 1000 m Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres. |
| 3 | Depositing of excavated earth on the barren valley side. Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth on the barren valley side |
| 4 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting (Disposal of cut material with all lift and lead upto 1000m) Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres. |
| 5 | Disposal of excavated earth on the barren valley side. Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of excavated earth on the barren valley side. |
| 6 | Excavation for Structures(i) b, Earthwork inexcavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (with de-watering)(I) Ordinary soil(A) Manual means(i) Depth upto 3m |
| 7 | Plain cement concrete 1:3:6 nominal mixing foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 8 | Stone masonry work in cement mortar 1:6 in foundation complete as per drawing and Technical Specification b) Random Rubble Masonry |
| 9 | Centring and shuttering including struting proping etc. and removal of form work for:(a) Foundation and plinth. |
| 10 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarsesand : 4 gradedstone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in: (a) Foundations and plinth |
| 11 | Steelwork in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. (b) In Tees, Angles and Channels |
| 12 | Steelwork in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. (c) In Flats up to 10 mm in thickness |
| 13 | Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle /Surki/ Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads. |
| 14 | Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc by Manual Means and Stacking for hill roads. |
| 15 | Cost of Haulage Excluding Loading and Unloading on hill load. Haulage of materials by tipper excluding cost of loading, unloading and stacking. (i) Surfaced Road. |
| 16 | Cost of Haulage Excluding Loading and Unloading on hill load. Haulage of materials by tipper excluding cost of loading, unloading and stacking. (ii) Unsurfaced gravel Road Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysJul 25, 2026
Bid Opening Date
Technical bids will be opened and evaluated.