Tender For Repair/Maintenance To Existing Road And Road Side Furniture Of Technical And Residential Area Of Irde Under Ge(I) R&D Dehradun
Tender Overview
Project Description
Tender for Repair/Maintenance To Existing Road And Road Side Furniture Of Technical And Residential Area Of Irde Under Ge(I) R&D Dehradun
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-Jul-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 27-Jul-2026 |
| 2 | 27-Jul-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 01-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | M&L for repairs to potholes, any depth not exceeding 1.00 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths etc, cutting around edges to at least 25mm in depth making good around by filling in screened and graded road metal, watering and well ramming (including supply of road metal) using power roller 8-12 tonne capacity and applying evenly a priming/tack coat with bituminous primer @ 6 Kg per 10 sqm using paving bitumen grade VG-30 on top surface complete all as specified and directed. |
| 2 | M&L for Preparing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified & directed. |
| 3 | M&L for for applying a priming/tack coat with bitumen @ 5 Kg per 10 Sqm using on black top surface complete all as specified and directed. |
| 4 | M&L for bituminous premix semi dense asphaltic concrete 30mm consolidated thickness with 5.5% binder (VG-30) contents by weight of total mix, crushed aggregate of grading 2, anti stripping agent, warm mix additives (quantity, quality and grade as per the approved job mix formula) etc, cleaning and pre-heating of the mineral aggregate, filler & bitumen of specific temperature throughly mixing with binder of specified bitumen contect, anti stripping agent, warm mix additives as per mix design in hot mix plant (batch type) of 100-120 TPH capacity, carrying the hot mixed materials by means of tipper, trucks or any other approved and and suitable arrangements, laying and hot premixed materials over the prepared surface by means of paver finisher including manual operation as and when required for proper grade, including level and camber through rolling with power roller 8 to 12 tonnes smooth wheeled, vibratory and tendem roller with necessary hand packing and pinning to give an even surface including running expense of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer-in-charge, required quality control tests at required interval etc complete in all respects complete all as specified and directed by Engineer-in-Charge |
| 5 | Notes : (i) Job Mix formula as per clause No. 505.3.3 of MORT&H specification for road and bridge work (Fifth Revision) for bituminous concrete shall be got designed from NIT/ CTL/ Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen content shall not be less than 5.5% by weight of total mix as per clause 507.2.5 of MoRT&H specifications (Fifth Revision).(ii) The cost of materials, transportation, Job mix formula form lab and testing charges for various tests as required are included in the unit rate quoted by the contractor.(iii) Cost of Filler i.e. rock dust, hydrated lime or cement is deemed to be included in unit rate. Please Enable Macros to View BoQ information |
| 6 | Notes : (i) Job Mix formula as per clause No. 505.3.3 of MORT&H specification for road and bridge work (Fifth Revision) for bituminous concrete shall be got designed from NIT/ CTL/ Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen content shall not be less than 5.5% by weight of total mix as per clause 507.2.5 of MoRT&H specifications (Fifth Revision).(ii) The cost of materials, transportation, Job mix formula form lab and testing charges for various tests as required are included in the unit rate quoted by the contractor.(iii) Cost of Filler i.e. rock dust, hydrated lime or cement is deemed to be included in unit rate. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender