Tender For Construction Of Lilo Of Existing 132 Kv S/C Kekri-Sawar Line At (Proposed) 132 Kv Gss Nasirda (Length- 18 Km. Approx.)
Tender Value
2.60 Crore
Estimated cost
Bid Submission
16 Jul 2026
14 days left
EMD
5.21 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sawai Madhopur → Rajasthan
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Lilo Of Existing 132 Kv S/C Kekri-Sawar Line At (Proposed) 132 Kv Gss Nasirda (Length- 18 Km. Approx.)
BOQ
| Sl. No. | Item Description |
| 1 | Details Survey as per tenrative route Which includes the following majar activities-Pegging of line route, providing of servey pillar at an interval of 3-4 Km in the line route with required jungle clearance for survey, Profile preparation of approved route on graph sheet and marking of offset on eighter side of line, marking of side clearance for hills, sand dunes etc. as per specification and tower scheduling. |
| 2 | Check survey as per approved route of line which includes -Rechecking of the line route as per approved profil. Chainage tower centre marking, pit marking bisection of angle tower as requrred at site. |
| 3 | Identification of Land and Preparation of Land compensation Case -The Land Identification and compensation case shall be prepared completely by the contractor during item No.2 (Check Survey of BOQ (Service) of NIB) as per GoR notification No. F.12 (31) Energy/2024-02647 dated 05.11.2024 & Gazette Notification dated 08.11.2024 and its further amendments dated 23.07.2025 titled as \\"Policy for payment for in regard to Right of Way for transmission line Rajasthan\\" land identification for compensation of RoW\\"i. Identify Landowners and issue notice to proceedii. Collect documents (e.g. proof of identity and ownership)iii Verify land records with revenue maps / officials (by revenue officials)iv Measure tower footing/corridor area in the presence of landowners and revenue officials(by TSP) |
| 4 | Documentation of Preparation of case for land compensation as per issued vide Gazette notification No. F.12(31) Energy/2024-02647 dated 05.11.2024 & Gazette Notification dated 08.11.2024 and its further amendments dated 23.07.2025 after collecting applicable DLC rate for disbursement of land compensation to land owners. i In case of grievances relating to land rates, DM to issue orders on land rates:ii. Land Use compensation Amount ROW: Calculation sheet based on the DLC and/ or Rate Determination by DM and land measurement ofvarious land owners based on measurement sheetiii Disburse the Payment and receipt from Land Owner iv Any other misc. work related to Land acquisition or preparing documents related thereof. |
| 5 | ExcavationExcavation excluding back filling, including shoring, shuttering, dewatering etc. uptothe required depath as per foundation specification / drawing.(i) Any Soil, soft rock other than hard rock |
| 6 | ExcavationExcavation excluding back filling, including shoring, shuttering, dewatering etc. uptothe required depath as per foundation specification / drawing.(ii)Hard rock (with blasting subject to permission or without blasting) |
| 7 | Setting of Template & Stub / Anchor BoltSetting of template & stub / Anchor bolt & removal after concreting excluding cost of excavation and concretingbut including back filling with excavated / borrowed earth (with lead & lift) in layers withramming and watering as per specification(i) Towers including extension upto 9Meters |
| 8 | CONCRETING:Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand stone aggregate 20 mm nominal size, water etc. preparing surface, shuttering mixing, placing, ramming, curing, finishing as per specification and drawing.(ii) 1:3:6 Mix |
| 9 | Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand stone aggregate 20 mm nominal size, water etc. preparing surface, shuttering mixing, placing, ramming, curing, finishing as per specification and drawing.(iv) 1:1.5:3 Mix |
| 10 | Steel RainforcementCutting, Bending, Welding of joints if required fixing and Placing of steel rainforcement as per specification and drawing including material. |
| 11 | Earthinga) Earthing of towers with pipe type earthing excluding the supply of Pipes, wires, flates & connectors, but including coke / charcoal, etc. excavation, augering, and backfilling in all types of soil. |
| 12 | Earthing(b) Earthing of towers legs with counterpoise type earthings excluding supply of materialsbut including excavation and backfilling in all types of soil.(i)each set by laying 4 wires each 15m long at a depth of 600mm |
| 13 | Erection of Towers: - Erection of supper structure including D shackles, ACD,Hangers, U-Bolts, Step Bolts, Danger Plate, Phase Plate, Number Plate etc. Also including tack welding of bolts & nuts upto bottom cross arm / beam level including application of Zinc Rich Paint.(i) Erection of towers (With extensions upto 9 Meters) |
| 14 | Conductor StringingA) Stringing of ACSR Panther including hoisting of insulator string, laying,jointing & tensioning of conductor, clamping with Armour rods and fixing of vibration damper per route Km. of the line.(i) Single Conductor Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysJul 17, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 days