Drinking Water Supply and Sanitation Government Departments Closing in 14 days TDR #56236721

Tender For Forest Diversion Proposal And Obtaining Stage-I And Stage-Ii Clearance From Moef And Cc, Goi For Forest Land Proposed For Diverson For Upper Vansadhara Irrigation Project In Rayagada District Of Odisha.

Issued by Government Departments · Rayagada, Odisha
Tender Value
2.18 Crore
Estimated cost
Bid Submission
15 Jul 2026
14 days left
EMD
2.18 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Rayagada → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Forest Diversion Proposal And Obtaining Stage-I And Stage-Ii Clearance From Moef And Cc, Goi For Forest Land Proposed For Diverson For Upper Vansadhara Irrigation Project In Rayagada District Of Odisha.

BOQ

Name of Work:- Forest Diversion Proposal (FDP) and obtaining Stage-I & Stage-II clearance from MoEF & CC, Govt. Of India for Forest Land proposed for diversion for Upper Vansadhara Irrigation project in Rayagada District of Odisha.
Sl. No. Item Description
1Data Collection providing all Effort and Resource (Manpower, infrastructure, transport) deployment based on Lumpsum variable estimate depending on no. of Revenue Map Sheets, No. Of RoRs as available with DoWR etc. all complete.
2Secondary Data Collection providing Effort and Resource (Manpower, infrastructure, transport) deployment based on Lumpsum variable estimate depending on no. of. Patches and extent of notified forest area, No. of Toposheets required. Procurement of HRSI. etc. all complete.
3Data Compilation providing Effort and Resource (Manpower, infrastructure) deployment based on Lumpsum variable estimate depending on verification of land schedule with RoR including Sabik Comparison, No. of village revenue cadastral map (digitisation, mosaicing) etc. all complete.
4Providing Effort and resource such as manpower, infrastructure, equipment, logistics and transport for DGPS Survey of forest land and ORSAC certification basing on No. of village cadastral maps involved, requirement of provisional geo-referencing. No. of PCPs involved, Demarcation of forest area as per divisional requirement. Computation of forest land area through digitization and comparison with area indicated in forest land schedule. etc. all complete.
5DGPS Survey & Geo-referencing of Forest Land
6Identification of Primary Control Points (PCP) for DGPS observations for Geo-referencing of Reservoir Area. etc. all complete.
7Identification of secondary Control Points (SCP) for DGPS observation for Geo-referencing of Reservoir Area . etc. all complete.
8Identification of Secondary Control Points (SCP) in cadastral map for Geo-referencing of Reservoir Area etc. all complete.
9Geo-referencing as per SCPS and identification of forest land patches for Geo-referencing of Reservoir Area etc. all complete.
10Providing Primary Control Points (PCP) Pillar (0.1x0.1x0.9) mtr including cost, carriage, colouring and fixing in position for Geo-referencing of Reservoir Area etc. all complete.
11Processing of DGPS observations, Geo-referencing of forest land Patches Generation of geo-referenced shape file of forest land patches Area computation and comparative statement etc. all complete.
12Printing and delivery of 8 nos. of Hard copies/ soft copies of maps and reports to user agency after Geo-referencing of Forest land through DGPS survey
13Coordination and Technical Compliance to Division and Tahsil Offices for their endorsement prior to ORSAC submission. Technical Support to ORSAC Verification and Certification and DFO's authentication etc. all complete.
14Fixing of concrete pillar (0.1 x 0.1 x 0.9) mtr including cost, carriage, colouring of the selected forest boundary points etc. all complete.
15Providing all Effort and Resource manpower, logistics and transport for site selection for non-forest land for compensatory afforestation etc. complete.
16Preparatory Works for Computation of forest land area through digitisation and comparison with area indicated in forest land schedule for Demarcation, DGPS survey of CAF area and ORSAC Certification etc. all complete.
17DGPS Survey & Geo-referencing of CAF Land
18Identification of Primary Control Points (PCP} Observation for Geo- referencing of CAF Area etc. all complete.
19Identification of Secondary Control Point (SCP) for DGPS observation for Geo-referencing of CAF Area etc. all complete.
20Identification of Secondary Control Points (SCP) in cadastral map for Geo-referencing of CAF Area etc. all complete.
21Geo-referencing of the CAF Area as per SCPs and identification of CAF Area etc. all complete.
22Fixing Primary Control Points (PCP) Pillar (0.1 x 0.1x 0.9) mtr including cost, carriage, colouring etc. complete.
23Processing of DGPS observation & generation of geo-referenced shape file of CAF Area etc. all complete.
24Printing and delivery of 8 Nos. of Hard copies/ soft copies of maps and reports to user agency etc. all complete.
25Providing effort and resource such as manpower, logistics and transport for Preparation of Catchment Area Treatment Plan including its approval from MoEF&CC etc. All complete.
26Coordination and Technical Compliance to Division and Tehsil Offices for their endorsement prior to ORSAC submission. Technical Support during ORSAC Verification and Certification and DFOs authentication. etc. all complete.
27Fixing of concrete Pillar (0.1 x 0.1 x 0.9) mtr including cost, carriage, colouring of the selected forest boundary points etc. all complete.
28Providing all Effort and Resource such as manpower, infrastructure & equipment for preparation of Maps basing on revenue cadastral maps, Integration of Satellite Image, Integration of Toposheets, map Integration of purpose wise break up etc. all complete.
29Providing all Effort and Resource such as manpower, infrastructure & equipment for preparation of reports etc. all complete.
30Providing all Effort and Resource such as manpower, infrastructure & equipment for Compilation of Enclosure etc. all complete.
31Providing all Effort and Resource such as manpower, infrastructure & equipment for E-filing of the FDP document on MoEF & CC portal etc. all complete.
32Providing all Effort and Resource such as manpower, infrastructure & equipment for Authentication of Maps & land schedule by DFO basing on revenue cadastral maps, Integration of Satellite image, Integration of Toposheets, map Integration of purpose wise breakup etc. all complete.
33Providing all Effort and Resource such as manpower, infrastructure & equipment for Formulation and recommendation of Site Specific Wildlife Management Plan from DFOs & RCCFs and presentation and approval from PCCF (WL)
34Providing all Effort and resources such as manpower, infrastructure, logistic, equipment for counting of no. of Trees, Extent of forest land involvment for computation of (fuelwood/fodder values, watershed services, bio -diversity and carbon value) to determine NPV Computation etc. all complete.
35Providing all Effort and Resources such as manpower, infrastructure & equipment for Formulation of CAF Scheme by DFO etc. all complete.
36Providing all effort and Resources such as Manpower, logistics and transport for Formulation of Plan/ Schemes & transmission to CF etc. all complete .
37Providing all Effort and Resources such as Manpower, Logistics and transport for conducting Gram Sabha among the affected villages under Forest Rights Act 2006, involving the concerned BDO, Sarpanchs, Gram Panchayats and obtaining necessary Clearance certificate from Collector & D.M. of concerned District under FRA etc. all complete.
38Providing all Effort and Resources such as Manpower, logistics and transport for Co-ordination and assistance for over all verification of FDP application with all necessary enclosures. CF's field inspection, inputs for CF's report, CF's recommendation etc. all complete.
39Providing all Effort and Resources such as Manpower, logistics and transport for Assisting verification of field inspection reports, document checks, observation of Nodal Officer and recommendation to PCCF. Technical clarification to PCCF and their recommendation to Government etc. all complete .
40Providing all Effort and Resources such as Manpower, logistics and transport for Assisting/ Clarifying Govt. of Odisha for seeking prior approval from MoEF&CC, Govt. Of India etc. all complete.
41Providing all Effort and Resources such as Manpower, Logistics and transport for Assistance in presentations and incorporation of suggestions for Technical Compliance for Stage-I Clearance as required etc. all complete.
42Providing all Effort and Resources such as Manpower, Logistics and transport for Assistance in presentations and incorporation of final recommendation for Technical Compliance for Stage-II Clearance as required etc. all complete. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56236721
AUTHORITY Government Departments
TENDER VALUE 2.18 Crore
LAST DATE 15-07-2026
Authority
Authority Name water resources department
Work Description Tender For Forest Diversion Proposal And Obtaining Stage-I And Stage-Ii Clearance From Moef And Cc, Goi For Forest Land Proposed For Diverson For Upper Vansadhara Irrigation Project In Rayagada District Of Odisha.
Basic Detail
Tender No e-Procurement Notice No. ACESICB- 01 /2026-27
Bidding Type Tender
Location
City Rayagada
State Odisha
Key Dates
Publish Date 30 Jun 2026
Submission Date 15 Jul 2026
Open Date 17 Jul 2026
Finance
Tender Value 2.18 Crore
Tender Fee 10000
EMD 2.18 Lakhs
Exemption Available
Document List
6a481885-3966-4930-8dbe-9a553ad9d8df.html
BOQ_597984.xls
Tendernotice_1.pdf
TechBidUVansadhara.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 15, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 14 days
Jul 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 16 days

Tender Documents

Download All (ZIP) ↓
html

6a481885-3966-4930-8dbe-9a553ad9d8df.html

xls

BOQ_597984.xls

pdf

Tendernotice_1.pdf

pdf

TechBidUVansadhara.pdf