Agriculture Cooperative Closing in 10 days TDR #56234123

Bids Are invited for Boiling House Febrication

Issued by Cooperative · Saharanpur, Uttar Pradesh
Tender Value
15 Lakhs
Estimated cost
Bid Submission
15 Jul 2026
10 days left
EMD
30000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Saharanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
2333

Project Description

Bids Are invited for Boiling House Febrication Evaporator And Clarification House Item No 1 - Dismantling Cleaning Repairing And Refitting Work Of Catcher Internal Elements Of New Semikestner (2300 M2) With Leak Proof Trial , Evaporator And Clarification House Item No 2 - Dismantling Fabrication And Erection Work Of Evaporator Body Or Semikestner Or Vapour Shell Complete With Save All Of Uttam Quad Set , Evaporator And Clarification House Item No 3 - Major Repair Of Save All Of The Evaporator Body Or Semikestner Or Vapour Shell Along With Leak Proof Water And Vacuum Trail , Evaporator And Clarification House Item No 4 - Dismantling Fabrication And Erection Of Weak Or Worn Out Partition Plate Of Top And Bottom Header Of Juice Heater And Repairing Of Rubber Strip Holding Grooves Along With Fitting Of Both Cover Leak Proof Water And Vacuum Trial , Evaporator And Clarification House Item No 5 - Dismantling Fabrication And Erection Work Of The Sulphur Furnace Melter Along With Hydraulic Tested Steam Coil With All Connections And Satisfactory Trial , Evaporator And Clarification House Item No 6 - Dismantling Fabrication And Erection Work Of The Sulphur Furnace Melt Receiver Along With Hydraulic Tested Steam Coil With All Connections And Satisfactory Trial , Evaporator And Clarification House Item No 7 - Dismantling Fabrication And Erection Of Sulphur Furnace Secondary Cooler With Its Cooling Coil And Complete Connection Of Water And Associated Pipe Lines With Satisfactory Trial , Evaporator And Clarification House Item No 8 - Repairing Of Sulphur Furnace Secondry Cooler By Replacing Bunch Of Cooling Pipe By Providing All Its Existing Connection , Evaporator And Clarification House Item No 9 - Dismantling Fabrication And Erection Of Juice Receiving Bottle Fitted At Vacuum Filter Station By Providing All Its Existing Connection , Evaporator And Clarification House Item No 10 - Dismantling Fabrication And Erection Of Weak Or Leak Condenser At Vacuum Filter , Evaporator And Clarification House Item No 11 - Dismantling Fabrication And Erection Of Muddy Juice Receiving Tank Complete With All Connection And Associated Pipe Lines Along With Leak Proof Trial , Evaporator And Clarification House Item No 12 - Dismantling Fabrication And Erection Of Mud Tray Of Vacuum Filter 10Feet X 20Feet Vacuum Filter Along With Satisfactory Trial , Evaporator And Clarification House Item No 13 - Dismantling Fabrication And Erection Weak Mud Agitator Of 10Feet X 20Feet Vacuum Filter Along With Satisfactory Trial , Evaporator And Clarification House Item No 14 - Dismantling Fabrication And Erection Of Mud Tray Of Vacuum Filter 14Feet X 28Feet Vacuum Filter Along With Satisfactory Trial , Evaporator And Clarification House Item No 15 - Dismantling Fabrication And Erection Weak Mud Agitator Of 14Feet X 28Feet Vacuum Filter Along With Satisfactory Trial , Evaporator And Clarification House Item No 16 - Dismantling Fabrication And Erection Of Weak Juice Box Of Juice Heater Along With Fitting Of Double Beat Valve And Leak Proof Trial , Evaporator And Clarification House Item No 17 - Dismantling Fabrication And Erection Of Weak Or Worn Out Portion Of Clear Juice Liquidation Box Along With Leak Proof Trial , Evaporator And Clarification House Item No 18 - Dismantling Fabrication And Erection Of Weak Or Worn Out Clarifier Mud Boot Along With Leak Proof Trial , Evaporator And Clarification House Item No 19 - Dismantling Fabrication And Erection Weak Shell Of Compartment No 1 And 2 Of Juice Clarifier (Big) Work Of New Dorr Diameter 28Feet Capacity 3750 Hl Body Shell Including Completion Of All Connections And Leak Proof Trial , Evaporator And Clarification House Item No 20 - Dismantling Fabrication And Erection Weak Shell Of Compartment No 1 Of Juice Clarifier (Small) Work Of New Dorr Diameter 24Feet Capacity 2550 Hl Body Shell Including Completion Of All Connections And Leak Proof Trial , Evaporator And Clarification House Item No 21 - Dismantling Fabrication And Erection Of Weak Shell Of Juice Sulphiter 320 Hl Including Completion Of All Connection And Leak Proof Trial , Evaporator And Clarification House Item No 22 - Dismantling Fabrication And Erection Of Juice Catcher For Raw Or Vacuum Orsugar Melter Orsulphited Juice Pumps With Suction Or Delivery Connection , Evaporator And Clarification House Item No 23 - Repairing Of Juice Heater Condensate Bottle Or Evaporator Or Syrup Receiving Bottle With Leak Proof Testing Partition Plate With All Connection , Evaporator And Clarification House Item No 24 - Repairing Of So2 Furnace Sublimation Pipe With Its Leaking Tower Etc With Testing , Evaporator And Clarification House Item No 25 - Dismantling Fabrication And Erection Of Vacuum Filter Mud Mixer Body And Fitting Of Screw Conveyor With Proper Alignment And Satisfactory Trial , Evaporator And Clarification House Item No 26 - Fabrication And Erection Of Screw Conveyor As Per Old S Le For Mud Mixture From 6Mm Thick Plate With Satisfactory Trial , Evaporator And Clarification House Item No 27 - Dismantling Fabrication And Fitting Of New Down Take Of Quad Or Old Or New Semikestner Etc , Evaporator And Clarification House Item No 28 - Dismantling Fabrication And Erection Of Weak Or Leaky Recovery Tower Of Juice Sulphiter Or Syrup Sulphiter , Evaporator And Clarification House Item No 29 - Repairing Of Umbrella And Providing Essential Supports Of Quad , Evaporator And Clarification House Item No 30 - Dismantling Fabrication And Erection Of Worn Out Umbrella Of Quad With Old Or New Plates , Evaporator And Clarification House Item No 31 - Dismantling Fabrication And Erection Of Saveall Of Quad Old Bodies , Evaporator And Clarification House Item No 32 - Replacement Of Worn-Out Top Conical Portion Of Quad And Vapour Shell With Save All Proper Strengthening With Associated Machinery , Evaporator And Clarification House Item No 33 - Dismantling Of Worn Out Arms And Shell (Outside And Inside) Of Juice Sulphiter Drum Fabrication And Erection With Satisfactory Trial , Evaporator And Clarification House Item No 34 - To Replace Worn Out Clear Juice Box Or Mud Discharge Box With Valve Of New Dorr Followed By Satisfactory Trial , Evaporator And Clarification House Item No 35 - Replacement Of Worn Out Mud Scrapper Plate And Fitting Of Mud Scrapper At Vacuum Filter , Evaporator And Clarification House Item No 36 - Major Repair Of Lime Slaker With Proper Alignment And Trial , Evaporator And Clarification House Item No 37 - To Replace Worn Out Sulphur Furnace Header Of Size 8 Inch Or 10 Inch Between After Burner And Cooler , Evaporator And Clarification House Item No 38 - Replacement Of Worn-Out Stirrer Arms Of Clarifier Completed With All Support And Squeezers Etc , Evaporator And Clarification House Item No 39 - Replacement Of Partition Plate Of Old Dorr Compartment Or Intermediameterte Tray With 5 Or 6Mm Ms Plate , Evaporator And Clarification House Item No 40 - Dismantling Of Existing 700 Sqm H S Area Of Quad Body First (Uttam Set Calandria ) Providing The Support For Stay The Shell Above Calandria Unloading Of New Calandria From Vehicle By Their Resources Shifting Of New Calandria At The Site Fitting And Erection Of Calandria At The Place Of Old Calandria With Shell Fitting Of Bottom Cone Of Calandria Inlet Vapour Or Exhaust Steam Connection Water Line Connection And Making All Other Connection To Run The Body Complete In All Respect , Pan House Item No 1 - Repairing Of Down-Take Of Pan For 40 Or 50 Ton Pan , Pan House Item No 2 - Repairing Of Down-Take Of Pan For 60 Or 80 Ton Pan , Pan House Item No 3 - Dismantling Of Gutter Of Molasses Magma And Massecuite , Pan House Item No 4 - Fabrication And Fitting Of Gutter Of Molasses Magma And Massecuite , Pan House Item No 5 - Repairing Of Hinge Type Cover Of Gutter , Pan House Item No 6 - Replacement Of Worn-Out Condensate Box Of Pans Quad And Juice Heaters , Pan House Item No 7 - Dismantling Fabrication And Fitting Of New Umbrella In Pans With Supports And J Pipes 40 Or 50 Ton Pan , Pan House Item No 8 - Dismantling Fabrication And Fitting Of New Umbrella In Pans With Supports And J Pipes 60 Or 80 Ton Pan , Pan House Item No 9 - Repairing Of Umbrella Of Pans With Supports And J Pipes 40 Or 50 Ton Pan , Pan House Item No 10 - Repairing Of Umbrella Of Pans With Supports And J Pipes 60 Or 80 Ton Pan , Pan House Item No 11 - Replacement Of Worn Out Distributor By New For 40 Or 50 Ton Pan , Pan House Item No 12 - Replacement Of Worn Out Distributor By New For 60 Or 80 Ton Pan , Pan House Item No 13 - Replacement Of Weak Sight Glass Flanges Of Pan And Evaporater Body Along With Leak Proof Water And Vaccuum Trial , Pan House Item No 14 - Replacement Of Complete Worn-Out Or Weak Top Cone Of 40 Or 50 Ton Pan By New With Supports And Strengthening Of Associated Machinery Parts Proper Along With Leak Proof Water And Vacuum Trial , Pan House Item No 15 - Replacement Of Complete Worn-Out Or Weak Top Cone Of 60 Or 80 Ton Pan By New With Supports And Strengthening Of Associated Machinery Parts Proper Along With Leak Proof Water And Vacuum Trial , Pan House Item No 16 - Strengthening Of 40 Or 60 Ton Pan Body And Taper Portion With Channel Etc , Pan House Item No 17 - Dismantling Fabrication And Erection Of Box Type Feed Header For Each Pan With All Related Connections Including Valves Nipples Flanges Etc , Pan House Item No 18 - Dismantling Fabrication And Erection Of Weak Portion Of Pan Shell With 12Mm Ms Plate Along With Leak Proof Water And Vacuum Trial Welding Must Be Double Coated From Outside And Inside , Pan House Item No 19 - Replacement Of Weak Orworn Out Side And Bottom Plate Of Cold Or Hot Water Over Head Tank Syrup Tank And Molasses Storage Tanks At Pan Station By Providing Proper Strengthening , Pan House Item No 20 - Fabrication And Erection Of Complete New Down Take Of 40 Or 50 Ton Pan Along With Leak Proof Water And Vacuum Trial , Pan House Item No 21 - Fabrication And Erection Of Complete New Down Take Of 60 Or 80 Ton Pan Along With Leak Proof Water And Vacuum Trial , Pan House Item No 22 - Repairing Of Weak Orworn Out Save-All Of 40 Or 50 Ton Pan Along With Leak Proof Water And Vacuum Trial , Pan House Item No 23 - Dismantling Fabrication And Erection Of Pan Save All With Proper Trial 40 Or 50 Ton Along With Leak Proof Water And Vacuum Trial , Pan House Item No 24 - Dismantling Fabrication And Erection Of 60 Or 80 Ton Pan Save All Along With Leak Proof Water And Vacuum Trial , Pan House Item No 25 - Repairing Of Weak Save-All Of 60 Or 80 Ton Pan Along With Leak Proof Water And Vacuum Trial , Pan House Item No 26 - Dismantling Fabrication And Erection Of Worn Out Portion Of The Chute For Pan Discharge Valve With Satisfactory Trial , Pan House Item No 27 - Repairing Or Patching Of Weak Body Shell Of Molasses Conditioner Along With Alignment Of Reduction Gear Box And Motor , Pan House Item No 28 - Dismantling Fabrication And Fitting Work Of 80Ton Pan Save All Internals , Pan House Item No 29 - Disamantling,Reapiring And Re-Fitting With Leak Proof Trial Of Collapsed Ss Venturi Of Pan No 10 Condensor , Injection Item No 1 - Replacement Of Weak/Leaky Suction And Delivery Pipe Of Mf- 50X50/ 40X40 Injection And Spray Pump As Per Old S Le Making And Fitting Of Stone Catcher Fitting Of Pipe With Pump , Injection Item No 2 - Dismantling ,Fabrication And Erection Of Weak/Wornout Delivery Pipe Of Injection Pump Having One End Reducer , Injection Item No 3 - Disamantling,Fabrication And Fitting Work Of Injection Header Suction Pipe Mesh Type Stainer , Schedule Work Item No 1 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 1 Inch Diameter , Schedule Work Item No 2 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 2 Inch Diameter , Schedule Work Item No 3 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 3 Inch Diameter , Schedule Work Item No 4 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 4 Inch Diameter , Schedule Work Item No 5 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 5 Inch Diameter , Schedule Work Item No 6 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 6 Inch Diameter , Schedule Work Item No 7 - Dismantling Fabrication And Erection Of Bend Size-2 Inch Diameter (Ms) , Schedule Work Item No 8 - Dismantling Fabrication And Erection Of Bend Size- 3 Inch Diameter (Ms) , Schedule Work Item No 9 - Dismantling Fabrication And Erection Of Bend Size- 4 Inch Diameter (Ms) , Schedule Work Item No 10 - Dismantling Fabrication And Erection Of Bend Size- 5 Inch Diameter (Ms) , Schedule Work Item No 11 - Dismantling Fabrication And Erection Of Bend Size- 6 Inch Diameter (Ms) , Schedule Work Item No 12 - Dismantling Fabrication And Erection Of Bend Size- 8 Inch Diameter (Ms) , Schedule Work Item No 13 - Dismantling Fabrication And Erection Of Bend Size-10 Inch Diameter (Ms) , Schedule Work Item No 14 - Dismantling Fabrication And Erection Of Bend Size-12 Inch Diameter (Ms) , Schedule Work Item No 15 - Dismantling Fabrication And Erection Of Nipple Size- 1Inch Diameter (Ms) , Schedule Work Item No 16 - Dismantling Fabrication And Erection Of Nipple Size- 2 Inch Diameter (Ms) , Schedule Work Item No 17 - Dismantling Fabrication And Erection Of Nipple Size- 3 Inch Diameter (Ms) , Schedule Work Item No 18 - Dismantling Fabrication And Erection Of Nipple Size- 4 Inch Diameter (Ms) , Schedule Work Item No 19 - Dismantling Fabrication And Erection Of Nipple Size- 5 Inch Diameter (Ms) , Schedule Work Item No 20 - Dismantling Fabrication And Erection Of Nipple Size- 6 Inch Diameter (Ms) , Schedule Work Item No 21 - Dismantling Fabrication And Erection Of Nipple Size- 8 Inch Diameter (Ms) , Schedule Work Item No 22 - Dismantling Fabrication And Erection Of Nipple Size- 10 Inch Diameter (Ms) , Schedule Work Item No 23 - Dismantling Fabrication And Erection Of Nipple Size- 12 Inch Diameter (Ms) , Schedule Work Item No 24 - Dismantling Fabrication And Erection Of Cross Size- 6 Inch Diameter (Ms) , Schedule Work Item No 25 - Dismantling Fabrication And Erection Of Cross Size- 8 Inch Diameter (Ms) , Schedule Work Item No 26 - Dismantling Fabrication And Erection Of Cross Size- 10 Inch Diameter (Ms) , Schedule Work Item No 27 - Dismantling Fabrication And Erection Of Tee Size- 4 Inch Diameter (Ms) , Schedule Work Item No 28 - Dismantling Fabrication And Erection Of Tee Size- 5 Inch Diameter (Ms) , Schedule Work Item No 29 - Dismantling Fabrication And Erection Of Tee Size- 6 Inch Diameter (Ms) , Schedule Work Item No 30 - Dismantling Fabrication And Erection Of Tee Size- 8 Inch Diameter (Ms) , Schedule Work Item No 31 - Dismantling Fabrication And Erection Of Tee Size- 10 Inch Diameter (Ms) , Schedule Work Item No 32 - Dismantling Fabrication And Erection Of Tee Size- 12 Inch Diameter (Ms) , Schedule Work Item No 33 - Dismantling Fabrication And Erection Of Flange Size- 4 Inch Diameter (Ms) , Schedule Work Item No 34 - Dismantling Fabrication And Erection Of Flange Size- 5 Inch Diameter (Ms) , Schedule Work Item No 35 - Dismantling Fabrication And Erection Of Flange Size- 6 Inch Diameter (Ms) , Schedule Work Item No 36 - Dismantling Fabrication And Erection Of Flange Size- 8 Inch Diameter (Ms) , Schedule Work Item No 37 - Dismantling Fabrication And Erection Of Flange Size- 10 Inch Diameter (Ms) , Schedule Work Item No 38 - Dismantling Fabrication And Erection Of Flange Size- 12 Inch Diameter (Ms) , Schedule Work Item No 39 - Dismantling Fabrication And Erection Of Reducer Size-4 Inch Diameter (Ms) , Schedule Work Item No 40 - Dismantling Fabrication And Erection Of Reducer Size-5 Inch Diameter (Ms) , Schedule Work Item No 41 - Dismantling Fabrication And Erection Of Reducer Size-6 Inch Diameter (Ms) , Schedule Work Item No 42 - Dismantling Fabrication And Erection Of Reducer Size-8 Inch Diameter (Ms) , Schedule Work Item No 43 - Dismantling Fabrication And Erection Of Reducer Size-10 Inch Diameter (Ms) , Schedule Work Item No 44 - Dismantling Fabrication And Erection Of Reducer Size-12 Inch Diameter (Ms) , Schedule Work Item No 45 - Dismantling And Fitting Of Valve Size- 3 Inch Diameter , Schedule Work Item No 46 - Dismantling And Fitting Of Valve Size- 4 Inch Diameter , Schedule Work Item No 47 - Dismantling And Fitting Of Valve Size- 5 Inch Diameter , Schedule Work Item No 48 - Dismantling And Fitting Of Valve Size- 6 Inch Diameter , Schedule Work Item No 49 - Dismantling And Fitting Of Valve Size- 8 Inch Diameter , Schedule Work Item No 50 - Dismantling And Fitting Of Valve Size- 10 Inch Diameter , Schedule Work Item No 51 - Dismantling And Fitting Of Valve Size- 12 Inch Diameter , Schedule Work Item No 52 - Dismantling Fabrication And Fitting Of Man Hole , Schedule Work Item No 53 - Dismantling Fabrication And Erection Of Platform By Using Old/New Plate , Schedule Work Item No 54 - Fabrication And Erection Of Railing From Old Material , Schedule Work Item No 55 - Fabrication And Erection Of T Ring For Strengthening Of Evaporator /Pan Vapour Pipe , Schedule Work Item No 56 - Dismantling Of Ms Heavy Structure / Tank , Schedule Work Item No 57 - Dismantling Of Ms Light Structure , Schedule Work Item No 58 - Fabrication And Erection Light Structure , Schedule Work Item No 59 - Fabrication And Erection Heavy Structure , Schedule Work Item No 60 - Fabrication Of Pump Bed With Pump, Reduction Gear And Motor Alignment Up To 7 5 H P , Schedule Work Item No 61 - Fabrication Of Pump Bed With Pump, Reduction Gear And Motor Alignment Up To 10 H P , Schedule Work Item No 62 - Fabrication Of Pump Bed With Pump, Reduction Gear And Motor Alignment Up To 25 H P , Schedule Work Item No 63 - Fabrication Of Pump Bed With Pump, Reduction Gear And Motor Alignment Up To 30 H P , Schedule Work Item No 64 - Dismantling And Cleaning Of Ms Pipe Line With Bend, Flange , Nipple Etc , Schedule Work Item No 65 - Fitting Of Ms Pipe Line With Bend, Flange ,Nipple Etc After Cleaning , Schedule Work Item No 66 - Fabrication And Erection Of Complete Square / Rectangular /Round Tank With Conical Bottom , Schedule Work Item No 67 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-25Mm , Schedule Work Item No 68 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-50Mm , Schedule Work Item No 69 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-75Mm , Schedule Work Item No 70 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-100Mm , Schedule Work Item No 71 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-125Mm , Schedule Work Item No 72 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-150Mm , Schedule Work Item No 73 - Dismantling, Fabrication And Fitting Of New Cone And Umbrella Any Where In The Factory Cone Above 01 Mtr Dia Upto 25Mtr Dia , Schedule Work Item No 74 - Dismantling , Fabrication And Fitting Of New Cone And Umbrella Any Where In The Factory, Cone Above 25 Mtr Dia , Schedule Work Item No 75 - Fabrication And Patchwork Of Equipments Using Old/ New Ms Plate By 6/8 Mm Thick Plate Over Round Vessels/Any Vessels , Schedule Work Item No 76 - Disamntling Fabrication And Erection Of Weak Vapor/Exhaust Steam Pipe Line And Bend Dia From 500Mm To 900Mm Complete In All Respect With Leak Proof Trial , Schedule Work Item No 77 - Disamntling Fabrication And Erection Of Intermediate Vapor Pipe/Vapor Pipe And Bends Of Quad Bodies And Vapor Pipe And Bends Of Pan Dia From 900 Mm To 1300 Mm Complete In All Respect With Leak Proof Trial Total Quantity : 2333

BOQ

Sl. No. Item TitleItem Description
1Evaporator and Clarification House Item no 1Dismantling cleaning repairing and refitting work of catcher internal elements of new Semikestner (2300 m2) with leak proof trial
2Evaporator and Clarification House Item no 2Dismantling fabrication and erection work of Evaporator body or Semikestner or vapour shell complete with save all of uttam quad set
3Evaporator and Clarification House Item no 3Major repair of save all of the evaporator body or Semikestner or vapour shell along with leak proof water and vacuum trail
4Evaporator and Clarification House Item no 4Dismantling fabrication and erection of weak or worn out partition plate of top and bottom header of juice heater and repairing of rubber strip holding grooves along with fitting of both cover leak proof water and vacuum trial
5Evaporator and Clarification House Item no 5Dismantling fabrication and erection work of the sulphur furnace melter along with hydraulic tested steam coil with all connections and satisfactory trial
6Evaporator and Clarification House Item no 6Dismantling fabrication and erection work of the sulphur furnace melt receiver along with hydraulic tested steam coil with all connections and satisfactory trial
7Evaporator and Clarification House Item no 7Dismantling Fabrication and erection of sulphur furnace secondary cooler with its cooling coil and complete connection of water and associated pipe lines with satisfactory trial
8Evaporator and Clarification House Item no 8Repairing of sulphur furnace secondry cooler by replacing bunch of cooling pipe by providing all its existing connection
9Evaporator and Clarification House Item no 9Dismantling fabrication and erection of Juice receiving bottle fitted at vacuum filter station by providing all its existing connection
10Evaporator and Clarification House Item no 10Dismantling fabrication and erection of weak or leak condenser at vacuum filter
11Evaporator and Clarification House Item no 11Dismantling fabrication and erection of Muddy juice receiving tank complete with all connection and associated pipe lines along with leak proof trial
12Evaporator and Clarification House Item no 12Dismantling fabrication and erection of mud tray of vacuum filter 10feet x 20feet vacuum filter along with satisfactory trial
13Evaporator and Clarification House Item no 13Dismantling fabrication and erection weak mud agitator of 10feet x 20feet vacuum filter along with satisfactory trial
14Evaporator and Clarification House Item no 14Dismantling fabrication and erection of mud tray of vacuum filter 14feet x 28feet vacuum filter along with satisfactory trial
15Evaporator and Clarification House Item no 15Dismantling fabrication and erection weak mud agitator of 14feet x 28feet vacuum filter along with satisfactory trial
16Evaporator and Clarification House Item no 16Dismantling fabrication and erection of weak juice box of juice heater along with fitting of double beat valve and leak proof trial
17Evaporator and Clarification House Item no 17Dismantling fabrication and erection of weak or worn out portion of clear juice Liquidation box along with leak proof trial
18Evaporator and Clarification House Item no 18Dismantling fabrication and erection of weak or worn out clarifier mud boot along with leak proof trial
19Evaporator and Clarification House Item no 19Dismantling Fabrication and Erection weak shell of compartment no 1 and 2 of Juice clarifier (Big) Work of New DORR Diameter 28feet Capacity 3750 HL Body shell including completion of all connections and leak proof trial
20Evaporator and Clarification House Item no 20Dismantling Fabrication and Erection weak shell of compartment no 1 of Juice clarifier (Small) Work of New DORR Diameter 24feet Capacity 2550 HL Body shell including completion of all connections and leak proof trial
21Evaporator and Clarification House Item no 21Dismantling Fabrication and Erection of weak shell of juice sulphiter 320 HL including completion of all connection and leak proof trial
22Evaporator and Clarification House Item no 22Dismantling fabrication and erection of Juice catcher for Raw or vacuum orsugar melter orsulphited Juice pumps with suction or delivery connection
23Evaporator and Clarification House Item no 23Repairing of Juice Heater Condensate Bottle or Evaporator or Syrup receiving Bottle with leak proof testing partition plate with all connection
24Evaporator and Clarification House Item no 24Repairing of SO2 furnace sublimation pipe with its leaking Tower etc with testing
25Evaporator and Clarification House Item no 25Dismantling fabrication and erection of vacuum filter mud mixer body and fitting of screw conveyor with proper alignment and satisfactory trial
26Evaporator and Clarification House Item no 26Fabrication and erection of screw conveyor as per old sample for mud mixture from 6mm thick plate with satisfactory trial
27Evaporator and Clarification House Item no 27Dismantling fabrication and fitting of new down take of quad or Old or New semikestner etc
28Evaporator and Clarification House Item no 28Dismantling fabrication and erection of weak or leaky recovery tower of juice sulphiter or Syrup Sulphiter
29Evaporator and Clarification House Item no 29Repairing of Umbrella and Providing essential supports of Quad
30Evaporator and Clarification House Item no 30Dismantling fabrication and erection of worn out Umbrella of Quad with Old or New Plates
31Evaporator and Clarification House Item no 31Dismantling fabrication and erection of saveall of Quad old bodies
32Evaporator and Clarification House Item no 32Replacement of worn-out top conical portion of Quad and Vapour Shell with save all proper strengthening with associated machinery
33Evaporator and Clarification House Item no 33Dismantling of worn out arms and shell (outside and inside) of juice sulphiter drum fabrication and erection with satisfactory trial
34Evaporator and Clarification House Item no 34To replace worn out clear juice box or mud discharge box with valve of new dorr followed by satisfactory trial
35Evaporator and Clarification House Item no 35Replacement of worn out mud scrapper plate and fitting of mud scrapper at Vacuum Filter
36Evaporator and Clarification House Item no 36Major repair of lime slaker with proper alignment and trial
37Evaporator and Clarification House Item no 37To replace worn out sulphur furnace header of size 8 inch or 10 inch between after burner and Cooler
38Evaporator and Clarification House Item no 38Replacement of worn-out Stirrer arms of clarifier completed with all support and squeezers etc
39Evaporator and Clarification House Item no 39Replacement of partition plate of old dorr Compartment or Intermediameterte tray with 5 or 6mm MS plate
40Evaporator and Clarification House Item no 40Dismantling of existing 700 Sqm H S Area of Quad body first (Uttam Set Calandria ) Providing the Support for Stay the Shell above Calandria Unloading of New Calandria from Vehicle by their resources shifting of new Calandria at the site Fitting and Erection of Calandria at the Place of Old Calandria with Shell fitting of bottom cone of Calandria inlet Vapour or Exhaust steam Connection water line connection and making all other connection to run the body complete in all respect
41Pan house item no 1Repairing of down-take of Pan for 40 or 50 Ton Pan
42Pan house item no 2Repairing of down-take of Pan for 60 or 80 Ton Pan
43Pan house item no 3Dismantling of Gutter of Molasses Magma and massecuite
44Pan house item no 4Fabrication and fitting of Gutter of Molasses Magma and massecuite
45Pan house item no 5Repairing of hinge type cover of Gutter
46Pan house item no 6Replacement of worn-out condensate box of pans quad and juice heaters
47Pan house item no 7Dismantling Fabrication and fitting of new umbrella in pans with supports and J pipes 40 or 50 Ton pan
48Pan house item no 8Dismantling Fabrication and fitting of new umbrella in pans with supports and J pipes 60 or 80 Ton pan
49Pan house item no 9Repairing of umbrella of Pans with supports and J pipes 40 or 50 Ton pan
50Pan house item no 10Repairing of umbrella of Pans with supports and J pipes 60 or 80 Ton pan
51Pan house item no 11Replacement of worn out distributor by new for 40 or 50 Ton Pan
52Pan house item no 12Replacement of worn out distributor by new for 60 or 80 Ton Pan
53Pan house item no 13Replacement of weak sight glass flanges of Pan and Evaporater Body along with leak proof water and vaccuum trial
54Pan house item no 14Replacement of complete worn-out or weak top cone of 40 or 50 Ton Pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial
55Pan house item no 15Replacement of complete worn-out or weak top cone of 60 or 80 Ton Pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial
56Pan house item no 16Strengthening of 40 or 60 Ton Pan body and Taper Portion with channel etc
57Pan house item no 17Dismantling Fabrication and Erection of Box type feed header for each Pan with all related connections including valves nipples flanges etc
58Pan house item no 18Dismantling Fabrication and Erection of weak portion of pan shell with 12mm MS plate along with leak proof water and vacuum trial Welding must be double coated from outside and inside
59Pan house item no 19Replacement of weak orworn out side and bottom plate of cold or hot water over head tank syrup tank and Molasses storage tanks at pan station by providing proper strengthening
60Pan house item no 20Fabrication and erection of complete new down take of 40 or 50 ton pan along with leak proof water and vacuum trial
61Pan house item no 21Fabrication and erection of complete new down take of 60 or 80 ton pan along with leak proof water and vacuum trial
62Pan house item no 22Repairing of weak orworn out save-all of 40 or 50 Ton pan along with leak proof water and vacuum trial
63Pan house item no 23Dismantling fabrication and erection of pan save all with proper trial 40 or 50 Ton along with leak proof water and vacuum trial
64Pan house item no 24Dismantling fabrication and erection of 60 or 80 Ton pan save all along with leak proof water and vacuum trial
65Pan house item no 25Repairing of weak save-all of 60 or 80 Ton pan along with leak proof water and vacuum trial
66Pan house item no 26Dismantling Fabrication and Erection of Worn out Portion of the Chute for Pan Discharge Valve with Satisfactory trial
67Pan house item no 27Repairing or patching of weak body shell of molasses conditioner along with alignment of reduction gear box and motor
68Pan house item no 28Dismantling fabrication and fitting work of 80Ton Pan save all internals
69Pan house item no 29Disamantling,Reapiring and Re-fitting with leak proof trial of Collapsed SS Venturi of Pan no 10 Condensor
70Injection item no 1Replacement of weak/leaky suction and delivery pipe of MF- 50X50/ 40X40 injection and spray pump as per old sample Making and fitting of stone catcher Fitting of Pipe with Pump
71Injection item no 2Dismantling ,Fabrication and Erection of weak/wornout delivery Pipe of injection pump having one end reducer
72Injection item no 3Disamantling,fabrication and fitting work of injection header Suction Pipe Mesh type Stainer
73Schedule work item no 1Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 1 inch diameter
74Schedule work item no 2Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 2 inch diameter
75Schedule work item no 3Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 3 inch diameter
76Schedule work item no 4Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 4 inch diameter
77Schedule work item no 5Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 5 inch diameter
78Schedule work item no 6Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 6 inch diameter
79Schedule work item no 7Dismantling fabrication and Erection of Bend Size-2 inch diameter (MS)
80Schedule work item no 8Dismantling fabrication and Erection of Bend Size- 3 inch diameter (MS)
81Schedule work item no 9Dismantling fabrication and Erection of Bend Size- 4 inch diameter (MS)
82Schedule work item no 10Dismantling fabrication and Erection of Bend Size- 5 inch diameter (MS)
83Schedule work item no 11Dismantling fabrication and Erection of Bend Size- 6 inch diameter (MS)
84Schedule work item no 12Dismantling fabrication and Erection of Bend Size- 8 inch diameter (MS)
85Schedule work item no 13Dismantling fabrication and Erection of Bend Size-10 inch diameter (MS)
86Schedule work item no 14Dismantling fabrication and Erection of Bend Size-12 inch diameter (MS)
87Schedule work item no 15Dismantling fabrication and Erection of Nipple Size- 1inch diameter (MS)
88Schedule work item no 16Dismantling fabrication and Erection of Nipple Size- 2 inch diameter (MS)
89Schedule work item no 17Dismantling fabrication and Erection of Nipple Size- 3 inch diameter (MS)
90Schedule work item no 18Dismantling fabrication and Erection of Nipple Size- 4 inch diameter (MS)
91Schedule work item no 19Dismantling fabrication and Erection of Nipple Size- 5 inch diameter (MS)
92Schedule work item no 20Dismantling fabrication and Erection of Nipple Size- 6 inch diameter (MS)
93Schedule work item no 21Dismantling fabrication and Erection of Nipple Size- 8 inch diameter (MS)
94Schedule work item no 22Dismantling fabrication and Erection of Nipple Size- 10 inch diameter (MS)
95Schedule work item no 23Dismantling fabrication and Erection of Nipple Size- 12 inch diameter (MS)
96Schedule work item no 24Dismantling fabrication and Erection of Cross Size- 6 inch diameter (MS)
97Schedule work item no 25Dismantling fabrication and Erection of Cross Size- 8 inch diameter (MS)
98Schedule work item no 26Dismantling fabrication and Erection of Cross Size- 10 inch diameter (MS)
99Schedule work item no 27Dismantling fabrication and Erection of Tee Size- 4 inch diameter (MS)
100Schedule work item no 28Dismantling fabrication and Erection of Tee Size- 5 inch diameter (MS)
101Schedule work item no 29Dismantling fabrication and Erection of Tee Size- 6 inch diameter (MS)
102Schedule work item no 30Dismantling fabrication and Erection of Tee Size- 8 inch diameter (MS)
103Schedule work item no 31Dismantling fabrication and Erection of Tee Size- 10 inch diameter (MS)
104Schedule work item no 32Dismantling fabrication and Erection of Tee Size- 12 inch diameter (MS)
105Schedule work item no 33Dismantling fabrication and Erection of Flange Size- 4 inch diameter (MS)
106Schedule work item no 34Dismantling fabrication and Erection of Flange Size- 5 inch diameter (MS)
107Schedule work item no 35Dismantling fabrication and Erection of Flange Size- 6 inch diameter (MS)
108Schedule work item no 36Dismantling fabrication and Erection of Flange Size- 8 inch diameter (MS)
109Schedule work item no 37Dismantling fabrication and Erection of Flange Size- 10 inch diameter (MS)
110Schedule work item no 38Dismantling fabrication and Erection of Flange Size- 12 inch diameter (MS)
111Schedule work item no 39Dismantling fabrication and Erection of Reducer Size-4 inch diameter (MS)
112Schedule work item no 40Dismantling fabrication and Erection of Reducer Size-5 inch diameter (MS)
113Schedule work item no 41Dismantling fabrication and Erection of Reducer Size-6 inch diameter (MS)
114Schedule work item no 42Dismantling fabrication and Erection of Reducer Size-8 inch diameter (MS)
115Schedule work item no 43Dismantling fabrication and Erection of Reducer Size-10 inch diameter (MS)
116Schedule work item no 44Dismantling fabrication and Erection of Reducer Size-12 inch diameter (MS)
117Schedule work item no 45Dismantling and fitting of valve Size- 3 inch diameter
118Schedule work item no 46Dismantling and fitting of valve Size- 4 inch diameter
119Schedule work item no 47Dismantling and fitting of valve Size- 5 inch diameter
120Schedule work item no 48Dismantling and fitting of valve Size- 6 inch diameter
121Schedule work item no 49Dismantling and fitting of valve Size- 8 inch diameter
122Schedule work item no 50Dismantling and fitting of valve Size- 10 inch diameter
123Schedule work item no 51Dismantling and fitting of valve Size- 12 inch diameter
124Schedule work item no 52Dismantling Fabrication and fitting of man hole
125Schedule work item no 53Dismantling Fabrication and erection of platform by using old/new plate
126Schedule work item no 54Fabrication and erection of railing from old Material
127Schedule work item no 55Fabrication and erection of T ring for strengthening of evaporator /Pan vapour Pipe
128Schedule work item no 56Dismantling of MS heavy structure / Tank
129Schedule work item no 57Dismantling of MS Light structure
130Schedule work item no 58Fabrication and Erection Light structure
131Schedule work item no 59Fabrication and Erection heavy structure
132Schedule work item no 60Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 7 5 H P
133Schedule work item no 61Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 10 H P
134Schedule work item no 62Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 25 H P
135Schedule work item no 63Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 30 H P
136Schedule work item no 64Dismantling and cleaning of MS Pipe Line with bend, flange , nipple etc
137Schedule work item no 65Fitting of MS pipe line with bend, flange ,nipple etc after cleaning
138Schedule work item no 66Fabrication and Erection of complete Square / Rectangular /Round Tank with conical Bottom
139Schedule work item no 67Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-25mm
140Schedule work item no 68Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-50mm
141Schedule work item no 69Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-75mm
142Schedule work item no 70Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-100mm
143Schedule work item no 71Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-125mm
144Schedule work item no 72Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-150mm
145Schedule work item no 73Dismantling, Fabrication and fitting of new Cone and umbrella any where in the factory Cone above 01 Mtr Dia upto 25mtr dia
146Schedule work item no 74Dismantling , Fabrication and fitting of new Cone and umbrella any where in the factory, Cone above 25 Mtr Dia
147Schedule work item no 75Fabrication and Patchwork of equipments using old/ New MS plate by 6/8 mm thick plate over round vessels/any vessels
148Schedule work item no 76Disamntling Fabrication and Erection of Weak Vapor/Exhaust steam Pipe line and bend Dia from 500mm to 900mm complete in all respect with leak proof trial
149Schedule work item no 77Disamntling Fabrication and Erection of intermediate Vapor pipe/Vapor pipe and bends of Quad bodies and Vapor pipe and bends of PAN dia from 900 mm to 1300 mm complete in all respect with leak proof trial

AI Tender Summary

OUR REF NO 56234123
AUTHORITY Cooperative
TENDER VALUE 15 Lakhs
LAST DATE 15-07-2026
Authority
Authority Name Uttar Pradesh Cooperative Sugar Factories Federation Limited
Work Description Bids Are invited for Boiling House Febrication Evaporator And Clarification House Item No 1 - Dismantling Cleaning Repairing And Refitting Work Of Catcher Internal Elements Of New Semikestner (2300 M2) With Leak Proof Trial , Evaporator And Clarification House Item No 2 - Dismantling Fabrication And Erection Work Of Evaporator Body Or Semikestner Or Vapour Shell Complete With Save All Of Uttam Quad Set , Evaporator And Clarification House Item No 3 - Major Repair Of Save All Of The Evaporator Body Or Semikestner Or Vapour Shell Along With Leak Proof Water And Vacuum Trail , Evaporator And Clarification House Item No 4 - Dismantling Fabrication And Erection Of Weak Or Worn Out Partition Plate Of Top And Bottom Header Of Juice Heater And Repairing Of Rubber Strip Holding Grooves Along With Fitting Of Both Cover Leak Proof Water And Vacuum Trial , Evaporator And Clarification House Item No 5 - Dismantling Fabrication And Erection Work Of The Sulphur Furnace Melter Along With Hydraulic Tested Steam Coil With All Connections And Satisfactory Trial , Evaporator And Clarification House Item No 6 - Dismantling Fabrication And Erection Work Of The Sulphur Furnace Melt Receiver Along With Hydraulic Tested Steam Coil With All Connections And Satisfactory Trial , Evaporator And Clarification House Item No 7 - Dismantling Fabrication And Erection Of Sulphur Furnace Secondary Cooler With Its Cooling Coil And Complete Connection Of Water And Associated Pipe Lines With Satisfactory Trial , Evaporator And Clarification House Item No 8 - Repairing Of Sulphur Furnace Secondry Cooler By Replacing Bunch Of Cooling Pipe By Providing All Its Existing Connection , Evaporator And Clarification House Item No 9 - Dismantling Fabrication And Erection Of Juice Receiving Bottle Fitted At Vacuum Filter Station By Providing All Its Existing Connection , Evaporator And Clarification House Item No 10 - Dismantling Fabrication And Erection Of Weak Or Leak Condenser At Vacuum Filter , Evaporator And Clarification House Item No 11 - Dismantling Fabrication And Erection Of Muddy Juice Receiving Tank Complete With All Connection And Associated Pipe Lines Along With Leak Proof Trial , Evaporator And Clarification House Item No 12 - Dismantling Fabrication And Erection Of Mud Tray Of Vacuum Filter 10Feet X 20Feet Vacuum Filter Along With Satisfactory Trial , Evaporator And Clarification House Item No 13 - Dismantling Fabrication And Erection Weak Mud Agitator Of 10Feet X 20Feet Vacuum Filter Along With Satisfactory Trial , Evaporator And Clarification House Item No 14 - Dismantling Fabrication And Erection Of Mud Tray Of Vacuum Filter 14Feet X 28Feet Vacuum Filter Along With Satisfactory Trial , Evaporator And Clarification House Item No 15 - Dismantling Fabrication And Erection Weak Mud Agitator Of 14Feet X 28Feet Vacuum Filter Along With Satisfactory Trial , Evaporator And Clarification House Item No 16 - Dismantling Fabrication And Erection Of Weak Juice Box Of Juice Heater Along With Fitting Of Double Beat Valve And Leak Proof Trial , Evaporator And Clarification House Item No 17 - Dismantling Fabrication And Erection Of Weak Or Worn Out Portion Of Clear Juice Liquidation Box Along With Leak Proof Trial , Evaporator And Clarification House Item No 18 - Dismantling Fabrication And Erection Of Weak Or Worn Out Clarifier Mud Boot Along With Leak Proof Trial , Evaporator And Clarification House Item No 19 - Dismantling Fabrication And Erection Weak Shell Of Compartment No 1 And 2 Of Juice Clarifier (Big) Work Of New Dorr Diameter 28Feet Capacity 3750 Hl Body Shell Including Completion Of All Connections And Leak Proof Trial , Evaporator And Clarification House Item No 20 - Dismantling Fabrication And Erection Weak Shell Of Compartment No 1 Of Juice Clarifier (Small) Work Of New Dorr Diameter 24Feet Capacity 2550 Hl Body Shell Including Completion Of All Connections And Leak Proof Trial , Evaporator And Clarification House Item No 21 - Dismantling Fabrication And Erection Of Weak Shell Of Juice Sulphiter 320 Hl Including Completion Of All Connection And Leak Proof Trial , Evaporator And Clarification House Item No 22 - Dismantling Fabrication And Erection Of Juice Catcher For Raw Or Vacuum Orsugar Melter Orsulphited Juice Pumps With Suction Or Delivery Connection , Evaporator And Clarification House Item No 23 - Repairing Of Juice Heater Condensate Bottle Or Evaporator Or Syrup Receiving Bottle With Leak Proof Testing Partition Plate With All Connection , Evaporator And Clarification House Item No 24 - Repairing Of So2 Furnace Sublimation Pipe With Its Leaking Tower Etc With Testing , Evaporator And Clarification House Item No 25 - Dismantling Fabrication And Erection Of Vacuum Filter Mud Mixer Body And Fitting Of Screw Conveyor With Proper Alignment And Satisfactory Trial , Evaporator And Clarification House Item No 26 - Fabrication And Erection Of Screw Conveyor As Per Old S Le For Mud Mixture From 6Mm Thick Plate With Satisfactory Trial , Evaporator And Clarification House Item No 27 - Dismantling Fabrication And Fitting Of New Down Take Of Quad Or Old Or New Semikestner Etc , Evaporator And Clarification House Item No 28 - Dismantling Fabrication And Erection Of Weak Or Leaky Recovery Tower Of Juice Sulphiter Or Syrup Sulphiter , Evaporator And Clarification House Item No 29 - Repairing Of Umbrella And Providing Essential Supports Of Quad , Evaporator And Clarification House Item No 30 - Dismantling Fabrication And Erection Of Worn Out Umbrella Of Quad With Old Or New Plates , Evaporator And Clarification House Item No 31 - Dismantling Fabrication And Erection Of Saveall Of Quad Old Bodies , Evaporator And Clarification House Item No 32 - Replacement Of Worn-Out Top Conical Portion Of Quad And Vapour Shell With Save All Proper Strengthening With Associated Machinery , Evaporator And Clarification House Item No 33 - Dismantling Of Worn Out Arms And Shell (Outside And Inside) Of Juice Sulphiter Drum Fabrication And Erection With Satisfactory Trial , Evaporator And Clarification House Item No 34 - To Replace Worn Out Clear Juice Box Or Mud Discharge Box With Valve Of New Dorr Followed By Satisfactory Trial , Evaporator And Clarification House Item No 35 - Replacement Of Worn Out Mud Scrapper Plate And Fitting Of Mud Scrapper At Vacuum Filter , Evaporator And Clarification House Item No 36 - Major Repair Of Lime Slaker With Proper Alignment And Trial , Evaporator And Clarification House Item No 37 - To Replace Worn Out Sulphur Furnace Header Of Size 8 Inch Or 10 Inch Between After Burner And Cooler , Evaporator And Clarification House Item No 38 - Replacement Of Worn-Out Stirrer Arms Of Clarifier Completed With All Support And Squeezers Etc , Evaporator And Clarification House Item No 39 - Replacement Of Partition Plate Of Old Dorr Compartment Or Intermediameterte Tray With 5 Or 6Mm Ms Plate , Evaporator And Clarification House Item No 40 - Dismantling Of Existing 700 Sqm H S Area Of Quad Body First (Uttam Set Calandria ) Providing The Support For Stay The Shell Above Calandria Unloading Of New Calandria From Vehicle By Their Resources Shifting Of New Calandria At The Site Fitting And Erection Of Calandria At The Place Of Old Calandria With Shell Fitting Of Bottom Cone Of Calandria Inlet Vapour Or Exhaust Steam Connection Water Line Connection And Making All Other Connection To Run The Body Complete In All Respect , Pan House Item No 1 - Repairing Of Down-Take Of Pan For 40 Or 50 Ton Pan , Pan House Item No 2 - Repairing Of Down-Take Of Pan For 60 Or 80 Ton Pan , Pan House Item No 3 - Dismantling Of Gutter Of Molasses Magma And Massecuite , Pan House Item No 4 - Fabrication And Fitting Of Gutter Of Molasses Magma And Massecuite , Pan House Item No 5 - Repairing Of Hinge Type Cover Of Gutter , Pan House Item No 6 - Replacement Of Worn-Out Condensate Box Of Pans Quad And Juice Heaters , Pan House Item No 7 - Dismantling Fabrication And Fitting Of New Umbrella In Pans With Supports And J Pipes 40 Or 50 Ton Pan , Pan House Item No 8 - Dismantling Fabrication And Fitting Of New Umbrella In Pans With Supports And J Pipes 60 Or 80 Ton Pan , Pan House Item No 9 - Repairing Of Umbrella Of Pans With Supports And J Pipes 40 Or 50 Ton Pan , Pan House Item No 10 - Repairing Of Umbrella Of Pans With Supports And J Pipes 60 Or 80 Ton Pan , Pan House Item No 11 - Replacement Of Worn Out Distributor By New For 40 Or 50 Ton Pan , Pan House Item No 12 - Replacement Of Worn Out Distributor By New For 60 Or 80 Ton Pan , Pan House Item No 13 - Replacement Of Weak Sight Glass Flanges Of Pan And Evaporater Body Along With Leak Proof Water And Vaccuum Trial , Pan House Item No 14 - Replacement Of Complete Worn-Out Or Weak Top Cone Of 40 Or 50 Ton Pan By New With Supports And Strengthening Of Associated Machinery Parts Proper Along With Leak Proof Water And Vacuum Trial , Pan House Item No 15 - Replacement Of Complete Worn-Out Or Weak Top Cone Of 60 Or 80 Ton Pan By New With Supports And Strengthening Of Associated Machinery Parts Proper Along With Leak Proof Water And Vacuum Trial , Pan House Item No 16 - Strengthening Of 40 Or 60 Ton Pan Body And Taper Portion With Channel Etc , Pan House Item No 17 - Dismantling Fabrication And Erection Of Box Type Feed Header For Each Pan With All Related Connections Including Valves Nipples Flanges Etc , Pan House Item No 18 - Dismantling Fabrication And Erection Of Weak Portion Of Pan Shell With 12Mm Ms Plate Along With Leak Proof Water And Vacuum Trial Welding Must Be Double Coated From Outside And Inside , Pan House Item No 19 - Replacement Of Weak Orworn Out Side And Bottom Plate Of Cold Or Hot Water Over Head Tank Syrup Tank And Molasses Storage Tanks At Pan Station By Providing Proper Strengthening , Pan House Item No 20 - Fabrication And Erection Of Complete New Down Take Of 40 Or 50 Ton Pan Along With Leak Proof Water And Vacuum Trial , Pan House Item No 21 - Fabrication And Erection Of Complete New Down Take Of 60 Or 80 Ton Pan Along With Leak Proof Water And Vacuum Trial , Pan House Item No 22 - Repairing Of Weak Orworn Out Save-All Of 40 Or 50 Ton Pan Along With Leak Proof Water And Vacuum Trial , Pan House Item No 23 - Dismantling Fabrication And Erection Of Pan Save All With Proper Trial 40 Or 50 Ton Along With Leak Proof Water And Vacuum Trial , Pan House Item No 24 - Dismantling Fabrication And Erection Of 60 Or 80 Ton Pan Save All Along With Leak Proof Water And Vacuum Trial , Pan House Item No 25 - Repairing Of Weak Save-All Of 60 Or 80 Ton Pan Along With Leak Proof Water And Vacuum Trial , Pan House Item No 26 - Dismantling Fabrication And Erection Of Worn Out Portion Of The Chute For Pan Discharge Valve With Satisfactory Trial , Pan House Item No 27 - Repairing Or Patching Of Weak Body Shell Of Molasses Conditioner Along With Alignment Of Reduction Gear Box And Motor , Pan House Item No 28 - Dismantling Fabrication And Fitting Work Of 80Ton Pan Save All Internals , Pan House Item No 29 - Disamantling,Reapiring And Re-Fitting With Leak Proof Trial Of Collapsed Ss Venturi Of Pan No 10 Condensor , Injection Item No 1 - Replacement Of Weak/Leaky Suction And Delivery Pipe Of Mf- 50X50/ 40X40 Injection And Spray Pump As Per Old S Le Making And Fitting Of Stone Catcher Fitting Of Pipe With Pump , Injection Item No 2 - Dismantling ,Fabrication And Erection Of Weak/Wornout Delivery Pipe Of Injection Pump Having One End Reducer , Injection Item No 3 - Disamantling,Fabrication And Fitting Work Of Injection Header Suction Pipe Mesh Type Stainer , Schedule Work Item No 1 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 1 Inch Diameter , Schedule Work Item No 2 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 2 Inch Diameter , Schedule Work Item No 3 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 3 Inch Diameter , Schedule Work Item No 4 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 4 Inch Diameter , Schedule Work Item No 5 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 5 Inch Diameter , Schedule Work Item No 6 - Dismantling ,Fabrication And Erection Of M S Pipe Line Including Bend Or Flange Etc 6 Inch Diameter , Schedule Work Item No 7 - Dismantling Fabrication And Erection Of Bend Size-2 Inch Diameter (Ms) , Schedule Work Item No 8 - Dismantling Fabrication And Erection Of Bend Size- 3 Inch Diameter (Ms) , Schedule Work Item No 9 - Dismantling Fabrication And Erection Of Bend Size- 4 Inch Diameter (Ms) , Schedule Work Item No 10 - Dismantling Fabrication And Erection Of Bend Size- 5 Inch Diameter (Ms) , Schedule Work Item No 11 - Dismantling Fabrication And Erection Of Bend Size- 6 Inch Diameter (Ms) , Schedule Work Item No 12 - Dismantling Fabrication And Erection Of Bend Size- 8 Inch Diameter (Ms) , Schedule Work Item No 13 - Dismantling Fabrication And Erection Of Bend Size-10 Inch Diameter (Ms) , Schedule Work Item No 14 - Dismantling Fabrication And Erection Of Bend Size-12 Inch Diameter (Ms) , Schedule Work Item No 15 - Dismantling Fabrication And Erection Of Nipple Size- 1Inch Diameter (Ms) , Schedule Work Item No 16 - Dismantling Fabrication And Erection Of Nipple Size- 2 Inch Diameter (Ms) , Schedule Work Item No 17 - Dismantling Fabrication And Erection Of Nipple Size- 3 Inch Diameter (Ms) , Schedule Work Item No 18 - Dismantling Fabrication And Erection Of Nipple Size- 4 Inch Diameter (Ms) , Schedule Work Item No 19 - Dismantling Fabrication And Erection Of Nipple Size- 5 Inch Diameter (Ms) , Schedule Work Item No 20 - Dismantling Fabrication And Erection Of Nipple Size- 6 Inch Diameter (Ms) , Schedule Work Item No 21 - Dismantling Fabrication And Erection Of Nipple Size- 8 Inch Diameter (Ms) , Schedule Work Item No 22 - Dismantling Fabrication And Erection Of Nipple Size- 10 Inch Diameter (Ms) , Schedule Work Item No 23 - Dismantling Fabrication And Erection Of Nipple Size- 12 Inch Diameter (Ms) , Schedule Work Item No 24 - Dismantling Fabrication And Erection Of Cross Size- 6 Inch Diameter (Ms) , Schedule Work Item No 25 - Dismantling Fabrication And Erection Of Cross Size- 8 Inch Diameter (Ms) , Schedule Work Item No 26 - Dismantling Fabrication And Erection Of Cross Size- 10 Inch Diameter (Ms) , Schedule Work Item No 27 - Dismantling Fabrication And Erection Of Tee Size- 4 Inch Diameter (Ms) , Schedule Work Item No 28 - Dismantling Fabrication And Erection Of Tee Size- 5 Inch Diameter (Ms) , Schedule Work Item No 29 - Dismantling Fabrication And Erection Of Tee Size- 6 Inch Diameter (Ms) , Schedule Work Item No 30 - Dismantling Fabrication And Erection Of Tee Size- 8 Inch Diameter (Ms) , Schedule Work Item No 31 - Dismantling Fabrication And Erection Of Tee Size- 10 Inch Diameter (Ms) , Schedule Work Item No 32 - Dismantling Fabrication And Erection Of Tee Size- 12 Inch Diameter (Ms) , Schedule Work Item No 33 - Dismantling Fabrication And Erection Of Flange Size- 4 Inch Diameter (Ms) , Schedule Work Item No 34 - Dismantling Fabrication And Erection Of Flange Size- 5 Inch Diameter (Ms) , Schedule Work Item No 35 - Dismantling Fabrication And Erection Of Flange Size- 6 Inch Diameter (Ms) , Schedule Work Item No 36 - Dismantling Fabrication And Erection Of Flange Size- 8 Inch Diameter (Ms) , Schedule Work Item No 37 - Dismantling Fabrication And Erection Of Flange Size- 10 Inch Diameter (Ms) , Schedule Work Item No 38 - Dismantling Fabrication And Erection Of Flange Size- 12 Inch Diameter (Ms) , Schedule Work Item No 39 - Dismantling Fabrication And Erection Of Reducer Size-4 Inch Diameter (Ms) , Schedule Work Item No 40 - Dismantling Fabrication And Erection Of Reducer Size-5 Inch Diameter (Ms) , Schedule Work Item No 41 - Dismantling Fabrication And Erection Of Reducer Size-6 Inch Diameter (Ms) , Schedule Work Item No 42 - Dismantling Fabrication And Erection Of Reducer Size-8 Inch Diameter (Ms) , Schedule Work Item No 43 - Dismantling Fabrication And Erection Of Reducer Size-10 Inch Diameter (Ms) , Schedule Work Item No 44 - Dismantling Fabrication And Erection Of Reducer Size-12 Inch Diameter (Ms) , Schedule Work Item No 45 - Dismantling And Fitting Of Valve Size- 3 Inch Diameter , Schedule Work Item No 46 - Dismantling And Fitting Of Valve Size- 4 Inch Diameter , Schedule Work Item No 47 - Dismantling And Fitting Of Valve Size- 5 Inch Diameter , Schedule Work Item No 48 - Dismantling And Fitting Of Valve Size- 6 Inch Diameter , Schedule Work Item No 49 - Dismantling And Fitting Of Valve Size- 8 Inch Diameter , Schedule Work Item No 50 - Dismantling And Fitting Of Valve Size- 10 Inch Diameter , Schedule Work Item No 51 - Dismantling And Fitting Of Valve Size- 12 Inch Diameter , Schedule Work Item No 52 - Dismantling Fabrication And Fitting Of Man Hole , Schedule Work Item No 53 - Dismantling Fabrication And Erection Of Platform By Using Old/New Plate , Schedule Work Item No 54 - Fabrication And Erection Of Railing From Old Material , Schedule Work Item No 55 - Fabrication And Erection Of T Ring For Strengthening Of Evaporator /Pan Vapour Pipe , Schedule Work Item No 56 - Dismantling Of Ms Heavy Structure / Tank , Schedule Work Item No 57 - Dismantling Of Ms Light Structure , Schedule Work Item No 58 - Fabrication And Erection Light Structure , Schedule Work Item No 59 - Fabrication And Erection Heavy Structure , Schedule Work Item No 60 - Fabrication Of Pump Bed With Pump, Reduction Gear And Motor Alignment Up To 7 5 H P , Schedule Work Item No 61 - Fabrication Of Pump Bed With Pump, Reduction Gear And Motor Alignment Up To 10 H P , Schedule Work Item No 62 - Fabrication Of Pump Bed With Pump, Reduction Gear And Motor Alignment Up To 25 H P , Schedule Work Item No 63 - Fabrication Of Pump Bed With Pump, Reduction Gear And Motor Alignment Up To 30 H P , Schedule Work Item No 64 - Dismantling And Cleaning Of Ms Pipe Line With Bend, Flange , Nipple Etc , Schedule Work Item No 65 - Fitting Of Ms Pipe Line With Bend, Flange ,Nipple Etc After Cleaning , Schedule Work Item No 66 - Fabrication And Erection Of Complete Square / Rectangular /Round Tank With Conical Bottom , Schedule Work Item No 67 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-25Mm , Schedule Work Item No 68 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-50Mm , Schedule Work Item No 69 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-75Mm , Schedule Work Item No 70 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-100Mm , Schedule Work Item No 71 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-125Mm , Schedule Work Item No 72 - Fabrication And Fitting Of Ms Coil (Coils Are To Be Duly Bend And Not Offset Pipe Welding Offset Welds Shall Not Be Treated As Coils But As Pipes ) Size-150Mm , Schedule Work Item No 73 - Dismantling, Fabrication And Fitting Of New Cone And Umbrella Any Where In The Factory Cone Above 01 Mtr Dia Upto 25Mtr Dia , Schedule Work Item No 74 - Dismantling , Fabrication And Fitting Of New Cone And Umbrella Any Where In The Factory, Cone Above 25 Mtr Dia , Schedule Work Item No 75 - Fabrication And Patchwork Of Equipments Using Old/ New Ms Plate By 6/8 Mm Thick Plate Over Round Vessels/Any Vessels , Schedule Work Item No 76 - Disamntling Fabrication And Erection Of Weak Vapor/Exhaust Steam Pipe Line And Bend Dia From 500Mm To 900Mm Complete In All Respect With Leak Proof Trial , Schedule Work Item No 77 - Disamntling Fabrication And Erection Of Intermediate Vapor Pipe/Vapor Pipe And Bends Of Quad Bodies And Vapor Pipe And Bends Of Pan Dia From 900 Mm To 1300 Mm Complete In All Respect With Leak Proof Trial Total Quantity : 2333
Basic Detail
Tender No GEM/2026/B/7717445
Bidding Type Tender
Location
City Saharanpur
State Uttar Pradesh
Key Dates
Publish Date 30 Jun 2026
Submission Date 15 Jul 2026
Open Date 15 Jul 2026
Finance
Tender Value 15 Lakhs
Tender Fee Ref. Documents
EMD 30000
Exemption Not Available
Document List
d0facd4a-fd50-4645-9e6a-500c78bd2a2d.pdf
1782545801.xlsx
9527729_Boq_1.xlsx
DOC_8e1e3f4e-ca6e-4d9d-93681782546149882_bycn4.upcsffl.sre.pdf
febdoc_2026-06-27-12-57-54_8d5cd10016b202c045d7e37d5b67326f.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 15, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Jul 15, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

d0facd4a-fd50-4645-9e6a-500c78bd2a2d.pdf

xlsx

1782545801.xlsx

xlsx

9527729_Boq_1.xlsx

upcsffl

DOC_8e1e3f4e-ca6e-4d9d-93681782546149882_bycn4.upcsffl.sre.pdf

pdf

febdoc_2026-06-27-12-57-54_8d5cd10016b202c045d7e37d5b67326f.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders