Tender for Tender for Renovation, Modernization And Upgradation Of Kulhal Hydroelectric Project On Turn Key Basis
Tender Value
110.57 Crore
Estimated cost
Bid Submission
05 Aug 2026
34 days left
EMD
2.22 Crore
Bank guarantee accepted
Document Fee
1.18 Lakhs
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Dehradun → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Renovation, Modernization And Upgradation Of Kulhal Hydroelectric Project On Turn Key Basis
BOQ
| Sl. No. | Item Description |
| 1 | SCHEDULE 1 - Plant and Equipment (all New Supplies Including Specified/Mandatory Spare Parts and Tools & Instruments against the tender shall be filled hereunder) with corresponding taxes and duties. |
| 2 | Turbine and Auxiliaries (As per Section IX-1) |
| 3 | Runner Chamber,complete in all respect. |
| 4 | Compensating Cone, complete in all respect. |
| 5 | Runner Assembly with its Operating Mechanism ,complete in all respects. |
| 6 | Turbine Shaft along with Fastners and Coupling Bolts, complete in all respect. |
| 7 | Top Cover/ Head Cover complete in all respect. |
| 8 | Bottom Ring/ Lower Ring complete in all respect. |
| 9 | Turbine Guide Bearing Assembly complete in all respect. |
| 10 | Turbine Shaft Seal Assembly & its cooling system complete in all respect. |
| 11 | Regulating Ring, complete in all respect. |
| 12 | Guide vanes complete in all respect. |
| 13 | Linkage Mechanism (Guide Vane Servomotor, Lever, Links, pins and Spacers, bush housing, self lubricating bushes & sliding guides for all locations including bolting materials,fastener and appruntenances etc.), complete in all respect. |
| 14 | Supply of Turbine Discharge Flowmeter (Ultrasonic Intrusive type) Including all other mechancial equipment and accessories, monitoring & data acquisition system, complete in all respect. |
| 15 | Bottom Ring/Lower Ring Guide Vane Self-lubricated Bushes, complete in all respect. |
| 16 | Top Cover/Head Cover Drainage Pumps complete in all respect. |
| 17 | Runner Oil Head Assembly and its Associated Parts, complete in all respect. |
| 18 | Sealing material, O rings, gaskits, pin & fastnesrs for manholes of penstock , draft tube and spiral casing complete in all respect. |
| 19 | Lighting, Ventilation equipment & Thermal insulation piping of Turbine Pit, complete in all respect. |
| 20 | Turbine Gauge panel complete in all respect. |
| 21 | Mobile oil handling set for oil filtration and conditioning complete in all respect. |
| 22 | Spiral Casing Drain Valve including associated flanges, complete in all respect. |
| 23 | Penstock Drain Valve including associated flanges, complete in all respect. |
| 24 | Draft Tube Drain Valve with extended spindle arrangement, complete in all respect. |
| 25 | Draft Tube Liner, complete in all respect. |
| 26 | Paint material for spiral casing ,Draft tube & draft tube gates etc.complete in all respect. |
| 27 | Special spare parts as per clause 4.1.2 (a) (xxxix) |
| 28 | Special spare parts as per clause 4.1.2 (a) (xxxii) |
| 29 | Special spare parts as per clause 4.3 (x) |
| 30 | Special spare parts as per clause 4.5.2 (g) |
| 31 | Special spare parts as per clause 4.6.2 (xix) |
| 32 | Special spare parts as per clause 4.7.2 (lvii) |
| 33 | Special spare parts as per clause 4.8.2 (a) (xxxvi) |
| 34 | Special spare parts as per clause 4.5.3 |
| 35 | Hydraulic Torque Tensioner with power pack for Runner/Turbine shaft coupling bolts. |
| 36 | Hydraulic Torque Tensioner with power pack for Turbine shaft/ Generator shaft flange coupling bolts. |
| 37 | Special Handling Devices and Fixtures for Turbine Components, complete in all respect. |
| 38 | Draft Tube Inspection & Maintenance Platform (removable), complete in all respect. |
| 39 | All Special Tools and Instruments, required for Assembly, Disassembly, Maintenance and handling of the equipment, complete in all respect. |
| 40 | Templates for the Kaplan Runner Blade profiles |
| 41 | Templates for the Guide Vane profiles |
| 42 | Manual Noise Measuring Instrument |
| 43 | Governing System and Auxiliaries (As per Section IX-2) |
| 44 | Supply of New Hgh Pressure Governing system with digital control panel, including monitoring & data acquisition system, complete in all respect. |
| 45 | Supply of all wiring, power, control, signal, and instrumentation cables, Local Control Box (LCB), earthing materials, and associated accessories required for the Governor System, complete in all respect. |
| 46 | Digital Electronic Controller complete in all respect. |
| 47 | Supply of Nitrogen-Charged Hydraulic Accumulator complete with all accessories, mounting arrangements, fittings, and associated components, in all respects. |
| 48 | Supply of Governor Oil Pressure Unit (OPU) complete with oil tank, pumps, valves, piping, instruments, controls, and all associated accessories, in all respects. |
| 49 | Nitrogen Bank for Governor system. |
| 50 | Miscellaneous Components and Auxiliary Systems complete in all respect |
| 51 | Control, Monitoring and Related items and Services complete in all respect. |
| 52 | Mandatory spare parts for Govering system as per clause 20 |
| 53 | Mechanical/ Hydraulic over speed protection device. |
| 54 | Control/Starter Panels (LCB) for auxiliaries. |
| 55 | Coordination and supply of associated interfaces, provision of necessary contacts and/ports for integration of generators, accessories and monitoring systems with plant SCADA system including all hardware, software, services and other inputs complete in all respect. |
| 56 | Cooling System (As per Section IX-5) |
| 57 | Supply of materials for the Cooling Water (CW) system, including pipes, flanges, valves, non-return valves (NRVs), flow meters, pressure gauges, Booster pumps,Strainer system and all associated accessories complete in all respect. |
| 58 | Supply of all wiring for power, control, signal, and instrumentation cables and earthing material required for the Cooling Water (CW) system complete In all respect. |
| 59 | Supply of matrial for building platform of cooling water system complete in all respect. |
| 60 | Supply of all necessary instrumentation and control devices, including sensors, transmitters, alarm and annunciation panel, cabling, and wiring etc. complete in all respect |
| 61 | Supply of Local Control Board (LCB) for Cooling water system complete in all respect. |
| 62 | Mandatory Spare Parts for Cooling Water System, as per clause 4.9. |
| 63 | Generator and Auxiliaries (As per Section-IX-3) |
| 64 | Supply of Stator Core & Punching, complete in all respect. |
| 65 | Supply of Stator Winding, complete in all respect. |
| 66 | Supply of Collector RIng/Slip Ring Assembly, Rotor Current Carrying Leads, Carbon Brush Assembly & Slip Ring Housing Assembly complete in all respect. |
| 67 | Supply of Rotor Pole Assemblies, including Field Windings, Pole Bodies, and Pole Fixing Arrangements, complete in all respect. |
| 68 | Supply of Carbon Dust Collector System, complete in all respect. |
| 69 | Supply of Oil Mist Exhaust System, complete in all respect. |
| 70 | Supply of Brake Dust Collector System, complete in all respect. |
| 71 | Supply of Generator Shaft Assembly including all other accessories, complete in all respect. |
| 72 | Supply of Brake Liner, complete in all respect. |
| 73 | Supply of Generator Thrust & Guide Bearing Assembly including bearing pads, support structure, oil retaining and distribution components, temperature detectors, instrumentation and all associated accessories, complete in all respect. |
| 74 | Supply of Condensate Management System, complete in all respect. |
| 75 | Supply of complete Stator Air Cooling System (air water heat exchanger type) including coolers, piping, fittings, valves, gaskets, supports, interconnections, and all associated accessories, complete in all respect. |
| 76 | Supply of complete High-Speed Lifting System (HSLS) with all associated equipment, piping, fittings, valves, instrumentation, control components, and accessories, complete in all respect. |
| 77 | Supply of complete Water Mist Fire Protection System for Generator, including all equipment, piping, fittings, valves, controls, accessories, and associated components required for a complete and functional system, complete in all respect. |
| 78 | Supply Space Heaters including LCB with local/remote, manual/ automatic control features; interface to ACS complete in all respect. |
| 79 | Supply of Generator Monitoring and Interface Cubicles, complete in all respect. |
| 80 | Supply of Vibration Monitoring System, complete in all respect. |
| 81 | Supply of Brake Ring & Carrier and Rotor Fan Assembly complete in all respect. |
| 82 | Supply of Extension Shaft/ Stub shaft complete in all respect. |
| 83 | Supply of Generator Cover and Lower Bracket Platform complete in all respect. |
| 84 | Mandatory Spare parts for stator Air cooler and cooling system as per clause 12.1.1(b),xviii. |
| 85 | Mandatory Spare parts for Rotor Hub, Spider & Rim Assembly as per clause 3.6.2 (j). |
| 86 | Mandatory Spare parts for Rotor Pole Assembly as per clause 3.7.2 (xxxviii) |
| 87 | Mandatory Spare parts for Brake Dust collection system, as per clause 14.2.21 |
| 88 | Mandatory Spare parts for Mist Fire Extinguisher system of Hydro-generator, as per clause 15.2.27. |
| 89 | Mandatory Spare parts for Brake and Jacking System, as per clause 16.2.25. |
| 90 | Mandatory Spare parts for Carbon Dust Collector System as per clause.17.2.16. |
| 91 | Mandatory Spare parts for Vibration monitoring system as per clause 18.2.24 |
| 92 | Mandatory Spare parts for HSLS as per clause 20.2.20. |
| 93 | Mandatory Spare parts for Thrust and Guide Bearing Assembly, as per clause 3.4.3(llll). |
| 94 | Mandatory Spare parts for Generator Shaft Assembly,3.5.3 (s). |
| 95 | Mandatory Spare parts for Stub Shaft Assembly as per clause 7.3.22 |
| 96 | Mandatory Spare parts for Carbon Brush Assembly as per clause. 9.2. |
| 97 | Mandatory Spare parts for Slip Ring Housing Assembly as per clause 10.3.14. |
| 98 | Mandatory Spare parts for Stator Winding as per clause 11.3.1 (m),(Viii). |
| 99 | Supply of all Special Tools & Plants (T&P), tackles, fixtures, handling devices, and maintenance instruments required for assembly, disassembly, maintenance, inspection, and handling of the equipment, complete in all respect |
| 100 | Supply of Rotor Rim Assembly complete in all respect. |
| 101 | Excitation system and Auxiliaries (As per Section-IX-4) |
| 102 | Static Excitation System Equipments complete with digital type AVR , Exciatation Transformer and other accessories, complete in all respect, as per Section -IX-4. |
| 103 | Tool and Instruments, Laptop (01 nos) for testing, commissioning and setting of parameters, |
| 104 | Mandatory spare parts for Excitation system, as per clause 4.1. |
| 105 | Instrumentation and Control System (As per Section IX-6) |
| 106 | All Supply of Instrumentation and Control system, as per Section IX-6. |
| 107 | Generator Termination Equipment (As per Section IX-3) |
| 108 | Neutral grounding cubicles complete with neutral grounding transformers, current limiting resistor, disconnecting switch etc.complee |
| 109 | Branch – off and CT for connecting the excitation transformers |
| 110 | Branch – off and CT for connecting the unit auxiliary transformers |
| 111 | Line side current transformers |
| 112 | Neutral side current transformers |
| 113 | Voltage transformers |
| 114 | Surge protection equipment |
| 115 | Generator Transformer and Auxiliaries (As per Section-IX-7) |
| 116 | Supply of Generator Transformer 6.6/132 kV, 50 Hz, 12.5 MVA (ONAN Type) with Marshalling Kiosks and related accessories complete in all respects. |
| 117 | Supply of Nitrogen Injection Fire Protection System complete with all accessories, pipe, fitting , valve etc for Generator Transformers, in all respects. |
| 118 | Lightning protection system for Generator Transformers comprising of lightning protection conductors, lightning masts with peaks, lightning arrestors, grounding flat connectors etc. complete in all respect. |
| 119 | Special spare parts Generator Transformera as per clause 15.1 |
| 120 | UPS and Auxiliaries (As per Section-IX-10) |
| 121 | Uninterrupted Power Supply (UPS) System, as per specification, complete in all respect |
| 122 | Cables & Cabling System (As per Section-IX-11) |
| 123 | 3.5x95 mm², XLPE insulated,Al,Armoured,cable including all accessories. |
| 124 | 3.5x70 mm², XLPE insulated,AL,Armoured cable including all accessories. |
| 125 | 3.5x25 mm², XLPE insulated, AL,Armoured cable including all accessories. |
| 126 | 4x6 mm², XLPE insulated,Copper conductor,Armoured, cable including all accessories. |
| 127 | 1.1 kV,1.5 mm² x 4 core Copper Armoured control cables, including all accessories |
| 128 | 1.1 kV,1.5 mm² x 8 core Copper Armoured control cables, including all accessories |
| 129 | 1.1 kV,1.5 mm² x 12 core Copper Armoured control cables, including all accessories |
| 130 | 1.1 kV,6 mm² x 2 core Copper Armoured control cables, including all accessories |
| 131 | 1.1 kV,4 mm² x 2 core Copper Armoured control cables, including all accessories |
| 132 | 1.1 kV, 1.5mm² x 4 core Copper Armoured control cables, including all accessories |
| 133 | 1.1 kV,1.5 mm² x 16 core Copper Armoured control cables, including all accessories |
| 134 | 1.1 kV,1.5 mm² x 4 core Copper Unarmoured control cables including all accessories |
| 135 | 1.1 kV,1.5 mm² x 8 core Copper Unarmoured control cables including all accessories |
| 136 | 1.1 kV,1.5 mm² x 12 core Copper Unarmoured control cables including all accessories |
| 137 | 1.1kV,1.5 mm² x 16 core Unarmoured Copper control cables including all accessories |
| 138 | 1.1 kV,1.5 mm² x 4core Copper Unarmoured control cables including all accessories |
| 139 | 1.1kV,4 mm² x 4 core copper unarmoured control cables including all accessories |
| 140 | 1.1kV,0.75 mm² x 4 core shield control cables including all accessories |
| 141 | 1.1kV,6 mm² x 4 core Unarmoured Copper control cables including all accessories |
| 142 | Supply of Cable Trays, Cable Racks, and all associated accessories, including supports, brackets, clamps, fasteners, bends, tees, reducers, and other required fittings, complete in all respects |
| 143 | Any cable not specifically covered above but necessarily required for completeness of power, control, instrumentation, signal, and termination works, complete in all respects. |
| 144 | Fire Protection System (As per Section-IX-12) |
| 145 | Supply of Fire Detection & Alarm Panel for Power House and associated plant areas, complete with compatible smoke detectors, modules, annunciation devices, SCADA interface, accessories, and all associated components, in all respects. |
| 146 | Supply of Smoke Detection System for Control Room, Cable Trenches/Galleries, Battery Room, LT Rooms,Turbine & Generator floor UAT & SAT room and other electrical and control equipment areas, complete in all respects. |
| 147 | Mandatory spare parts for fire protection system, as per clause 8. |
| 148 | HVAC System (As per Section-IX13) |
| 149 | Supply of HVAC system I.e exhaust fans, ventilation duct etc.complete in all respect. |
| 150 | Earthing and Lightning System (As per Section-IX-14) |
| 151 | Main grid conductor |
| 152 | Risers |
| 153 | Ground rods, earthing material (salt & charcoal), connector etc. |
| 154 | SCADA System (As per Section-IX-8) |
| 155 | Supply of Control & Monitoring System comprising SCADA Control Boards, Routers/Gateways, Workstations, Industrial Computers, Large Screen LED Display Unit, Control Network, Optical Fibre Cables, Software, Control & Instrumentation Cables, Printers, Operating Keyboards and all associated accessories, complete in all respect. |
| 156 | Supply of Global positioning System (GPS) including antenna, surge protection, cable, master clock, interface, supply system etc.complete in all respect. |
| 157 | Mandatory spare parts for SCADA system as per clause 6.7. |
| 158 | EOT Crane and Auxiliaries(As per Section-IX-15) |
| 159 | Supply of Hoist wire Ropes with clamps for Main and Auxiliary Hoists, complete in all respect. |
| 160 | Supply of Wireless remote control |
| 161 | Supply of independent load cell system for main and aurxiliary hoist, complete in all respect. |
| 162 | Supply all panels, controllers, contactors, relays, resistances, cabling, wiring, motors, brakes, brake thrusters, limit switches, protection systems, operator controls, lighting, signaling systems, sensors, feedback devices, DSL system, VFD drive, Festoon arrangement and associated accessories , complete in all respect. |
| 163 | Mandatory spare parts for EOT crane as per clause 5.0. |
| 164 | TRCM & Trash Rack Panels (As per Section IX-9) |
| 165 | Supply of New standard cable operated TRCM with automatic cable reeling drum, movable trash collecting container, jib-type revolving hoist and associated accessories as per specification , complete in all respect. |
| 166 | Supply of New Trash Rack and New Rail Track, including all associated accessories, complete in all respect. |
| 167 | Chequered steel plates for rplaceing grating cover. |
| 168 | Mandatory spare parts for TRCM as per clause 7.0. |
| 169 | Supply of Water level transmitter and indicator/ recording instruments (compatible with ACS) in headrace and tailrace side along with required panels Consumables, complete in all respect. |
| 170 | Power House Auxiliaries (As per Section IX-16) |
| 171 | Supply of Material for Overhauling of Existing Air Compressor System, acoustically treated sound-proof enclosure,all CTs and VTs associated with metering and protection of Generator and UAT, Excitation Transformer and SAT complete in all respect. |
| 172 | Supply of Material for Renovation of Control Room, LV Rooms, Battery Room, and Offices, complete in all respect. |
| 173 | Split AC 2.0 Ton, including voltage stablizer complete in all respect. |
| 174 | SCHEDULE 2 - Local Transportations Including Port Clearance & Port Charges and Inland Insurance for (all New Supplies Including Specified/Mandatory Spare Parts and Tools & Instruments against the tender shall be filled hereunder) with corresponding taxes and duties. |
| 175 | Freight & Insurance Charges for all Components of the Turbine and Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-1) |
| 176 | Freight & Insurance Charges for all Components of the Governor and Auxiliaries its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-2) |
| 177 | Freight & Insurance Charges for all Components of the Generator and Auxiliries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-3) |
| 178 | Freight & Insurance Charges for all Components of the Exciatation System and Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges, Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-4) |
| 179 | Freight & Insurance Charges for all Components of the Cooling System and its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-5) |
| 180 | Freight & Insurance Charges for all Components of the Instrumentation & Control System and its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-6) |
| 181 | Freight & Insurance Charges for all Components of the Generator Transformer and Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respects for two units (as per Section IX-7) |
| 182 | Freight & Insurance Charges for all Components of the SCADA System and its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-8) |
| 183 | Freight & Insurance Charges for all Components of the TRCM & Trash Rack Panels, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-9) |
| 184 | Freight & Insurance Charges for all Components of the UPS & Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,packaging, unloading, and stacking, complete in all respect (as per Section IX-10) |
| 185 | Freight & Insurance Charges for all Items of Cables & Cabling System and its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-11) |
| 186 | Freight & Insurance Charges for all Items of Fire Protection System its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-12) |
| 187 | Freight & Insurance Charges for all Items for HVAC System, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-13) |
| 188 | Freight & Insurance Charges for all Items for Earthing and Lightining system, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respects (as per Section IX-14) |
| 189 | Freight & Insurance Charges for all Items for EOT Crane and Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-15) |
| 190 | Freight & Insurance Charges for all Items for Power House Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-16) |
| 191 | SCHEDULE 3 - Dismantling, Refurbishment, Installation & Other Services for (all Works against the tender shall be filled hereunder) with corresponding taxes and duties. |
| 192 | Reverse Engineering complete in all respect. |
| 193 | Model Test |
| 194 | Major Design |
| 195 | Turbine & Auxiliaries (As per Section - IX-1) |
| 196 | Site Inspection and Testing for Penstock, Draft Tube with DT cone & Spiral casing complete in all respect. |
| 197 | Site Inspection and Testing for Stay Vanes & Stay Ring with Flanges.complete in all respect. |
| 198 | Repair,Restoration, Refurbishment and Painting & Coating of Penstock, Draft Tube with DT cone,turbine pit and spiral Casing complete in all respect . |
| 199 | Testing, commissioning of new flow metering and pressure measuring equipment for each turbine, complete with IP 66 protected local control board (LCB) with interface to automatic control system (ACS) of the power station, including all internal LV power and signal cabling.complete in all respect. |
| 200 | Repair,Restoration & Refurbishment of Stay Vanes & Stay Ring with Flanges complete in all respect. |
| 201 | Installation,ErectionTesting & Commissioning of Runner Chamber Complete in all respect. |
| 202 | Installation,Erection,Testing & Commissioning of Compensating Cone complete in all respect. |
| 203 | Installation,Erection,Testing, and Commissioning of Runner Assembly complete in all respect. |
| 204 | Installation,Erection,Testing, and Commissioning of Turbine Shaft complete in all respect. |
| 205 | Installation,Erection,Testing, and Commissioning of Top Cover/Head Cover complete in all respect. |
| 206 | Installation,Erection,Testing, and Commissioning of Top Bottom Ring/ Lower Ring complete in all respect. |
| 207 | Installation,Erection,Testing, and Commissioning of Turbine Guide Bearing Assembly complete in all respect. |
| 208 | Installation,Erection,Testing, and Commissioning of Turbine Shaft Seal Assembly & its Cooling System complete in all respect. |
| 209 | Installation,Erection,Testing, and Commissioning of Guide Vane Assembly including all associated mechanical accessories, complete in all respect. |
| 210 | Installation,Erection,Testing, and Commissioning of Regulating Ring & Linkage Mechanism including all associated mechanical accessories,complete in all respect. |
| 211 | Installation,Erection,Testing, and Commissioning of Turbine Discharge Flow Meter (Ultrasonic intrusive type) including all other associated mechanical accessories, monitoring & data acquisition system and integration with plant SCADA system complete in all respect. |
| 212 | Refurbishment of manhole doors and window of penstock,window draft tube & window spiral casing including replcement of O rings, gaskits, pin & fastnesrs etc complete in all respect. |
| 213 | Hydro blasting/shot blasting complete painting (Primer & Finish) of inside and outside surfaces (exposed) of Penstock, Draft Tube & Spiral Casing including all arrangements for completion of work. |
| 214 | Dismantling, removal, handling, stacking, transportation, and storage of all existing components, Including unused, unserviceable, and scrap materials, at the designated UJVNL site/store, complete in all respect. |
| 215 | Governors and Auxiliaries (As per Section IX-2 ) |
| 216 | Dismantling and removal of the existing Governing System, including but not limited to the HMC, HP and LP Compressor Systems, OPU System, Guide Vane Servomotors, Master Switch, Feedback Mechanism, interconnecting pipelines, and all associated appurtenances, including all miscellaneous repair works, and stacking and storing of dismantled/unused materials at the UJVNL site/store. |
| 217 | Installation,Erection,Testing, and Commissioning of New Governing System complete in all respect. |
| 218 | Construction of foundations and platforms for the Governing System equipment including covering of nearby cavities/openings with suitable chequered plates, and execution of all necessary civil works arising out of the replacement activities, complete in all respect. |
| 219 | Installation, Erection,Testing & Commissioning of all power, control, signal, and instrumentation cables along with cable tray, Local Control Box (LCB), earthing and associated accessories required for the Governor System, complete in all respect. |
| 220 | Cooling System (as per section IX-5) |
| 221 | Dismantling, removal, stacking, and storage of unused materials at the UJVNL site/store; execution of all miscellaneous repair works; and Installation, Erection, Testing, and Commissioning of the New Cooling Water System, including builing platfom and all associated services, complete in all respects. |
| 222 | Generators and Auxiliaries (As per Section IX-2) |
| 223 | Inspection, engineering evaluation, structural integrity verification, residual life assessment of Stator and Lower Bracket Foundation, including FEA and associated studies, complete in all respect. |
| 224 | Refurbishment/Strengthening of Stator and Lower Bracket Foundation, as required based on the findings of inspection and assessment, complete in all respect. |
| 225 | Inspection, engineering evaluation, structural integrity verification, residual life assessment of Lower Supporting Bracket, including FEA and associated studies, complete in all respect. |
| 226 | Refurbishment/Strengthening of Lower Supporting Bracket, as required based on the findings of inspection and assessment, complete in all respect. |
| 227 | Inspection, engineering evaluation, structural integrity verification, residual life assessment of Upper Supporting Bracket, including FEA and associated studies, complete in all respect. |
| 228 | Refurbishment/Strengthening of Upper Supporting Bracket, as required based on the findings of inspection and assessment, complete in all respect. |
| 229 | Refurbishment, Inspection, Testing, and necessary repair of Stator Frame, complete in all respect. |
| 230 | Installation, assembly, alignment, testing, and commissioning of new stator core including dismantling and removal of existing stator core, complete in all respect. |
| 231 | Refurbishment of Rotor Hub and Spider, including necessary repairs and restoration works, complete in all respect. |
| 232 | Installation, assembly, alignment, testing, and commissioning of new stator winding, including dismantling and removal of the existing stator winding, complete in all respect. |
| 233 | Installation, assembly, alignment, testing, and commissioning of new Collector RIng/Slip Ring Assembly, Rotor Current Carrying Leads, Carbon Brush Assembly, & Slip Ring Housing Assembly including dismantling and removal of the existing, complete in all respect. |
| 234 | Installation, assembly, testing, and commissioning of carbon dust collector system ,complete in all respect. |
| 235 | Installation, assembly, testing, and commissioning of oil mist exhaust system, complete in all respect. |
| 236 | Installation, assembly, testing, and commissioning of brake dust collector system ,complete in all respect. |
| 237 | Refurbishment and upgradation of the existing Brake and Jacking System, including required modifications for compatibility and integration with the new ACS, complete in all respect. |
| 238 | Replacement of Brake Liners, including dismantling of existing liners and installation of new liners, complete in all respect. |
| 239 | Installation, assembly, testing, and commissioning of Monitoring System, complete in all respect. |
| 240 | Installation, assembly, testing, and commissioning of Vibration Monitoring System, complete in all respect. |
| 241 | Installation, assembly, testing, and commissioning of Generator Monitoring and Interface Cubical, complete in all respect. |
| 242 | Installation,testing, and commissioning of standstill Heaters with LCB, complete in all respect. |
| 243 | Inspection, Repair & Refurbishment of Generator Pit & Barrel complete in all respect. |
| 244 | Provideing Generator Barrel Lighting including all fixtures, wiring, accessories, and associated works, complete in all respect. |
| 245 | Replacement of Pole Assemblies, including pole windings, pole bodies, and pole fixing arrangements, comprising dismantling and removal of existing pole assemblies and installation of new pole assemblies, complete in all respect. |
| 246 | Replacement of Extension Shaft/Stub Shaft Assembly, comprising dismantling and removal of the existing assembly and installation and alignment of the new Extension Shaft/Stub Shaft Assembly, complete in all respect. |
| 247 | Replacement of Rotor Rim, comprising dismantling and removal of the existing rotor rim, installation, alignment, and fitting of the new rotor rim, complete in all respect. |
| 248 | Replacement of Thrust Bearing Assembly and Guide Bearing Assembly, comprising dismantling and removal of the existing thrust bearing assembly and guide bearing assembly, and installation, alignment, testing, and commissioning of the new thrust bearing assembly and guide bearing assembly, complete in all respect. |
| 249 | Replacement of Stator Air Cooler & Cooling System, comprising dismantling and removal of the existing Stator Air Cooler & Cooling System along with associated piping, fittings, and accessories, and installation, testing, and commissioning of the Stator Air Cooler & Cooling System Including Condensate Collecting System work,complete in all respect. |
| 250 | Installation, assembly, testing, and commissioning of High-Speed Lifting System (HSLS), including all piping, fittings, accessories, and associated works, complete in all respect |
| 251 | Installation, testing, and commissioning of Water Mist Fire Protection System for Generator, including all piping, nozzles, valves, supports, fittings, accessories, and associated works and Integration with fire alarm system & ACS complete in all respect. |
| 252 | Installation, assembly, testing, and commissioning of Brake Ring & Carrier, Rotor Fan Assembly complete in all respect. |
| 253 | Installation & assembly Generator Cover and Lower Bracket Platform complete in all respect. |
| 254 | Excitation system and Auxiliaries (As per Section IX-4) |
| 255 | Dismantling, removal, stacking, and storage of existing/unused materials at the site/store of UJVNL, and Installation, Erection, Testing, and Commissioning of the new Excitation System, including Excitation Transformer, accessories, and associated works, complete in all respects. |
| 256 | Instrumentation and Control System (As per Section IX-6) |
| 257 | installation, testing, calibration, and commissioning of the complete instrumentation and control (I&C) system required for monitoring, control, protection, and safe operation of the turbine, generator, and auxiliary systems etc. complete in all respect. |
| 258 | Generator Termination Equipment (As per Section IX-3) |
| 259 | Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and Installation, erection, testing and commissioning of Gnerator Termination Equipments, complete in all respects. |
| 260 | Generator Transformers and Auxiliaries (As per Section IX-7) |
| 261 | Dismantling, removal and storage of the existing Generator transformer and associated material at site/store of UJVNL, including all miscellaneous repair works, complete in all respect. |
| 262 | Installation, Erection, Testing, and Commissioning of the new Generator Transformer (ONAN Type) Integration with Nitrogen Injection Fire Protection System, including all mechanical, civil and miscellaneous installation/repair works required for complete installation and commissioning, complete in all respect. |
| 263 | Design and construction of Transformer Oil Pit inline with the Nirogen injection fire protection system ( 2no. for new , 01 for existing) complete in all respect. |
| 264 | UPS and Auxiliaries (As per Section IX-10) |
| 265 | Installation, erection, testing and commissioning of new UPS system capable to supply uninterrupted power to SCADA servers, Operator work stations, RTUs / PLC panels, Control and protection panels, Communication equipment, Emergency lighting system complete in all respects. |
| 266 | Cables and Cabling System (As per Section IX-11) |
| 267 | Disconnection and removal from site of all power, control,signal, instrumnetation cables of all sizes, shifting of removed cables to stores, and supply erection testing and commissioning of all new cables including all assesiories complete in all respect. |
| 268 | Dismantling of damaged cable tray and racks from all location and Installation, erection, alignment, fixing, and commissioning of new Cable Trays and Cable Racks, including supports, brackets, clamps, fasteners, bends, tees, reducers, and all associated accessories, complete in all respects. |
| 269 | Laying, dressing, termination, testing, and commissioning of all existing power, control, instrumentation, and signal cables, including all accessories and associated works, complete in all respects |
| 270 | Laying, dressing, termination, testing, and commissioning of power, control, instrumentation, and signal cables, including all accessories and associated works, complete in all respects |
| 271 | Surface preparation and painting of cable racks with primer and finish and application of fire-retardant coating on cables complete in all respect. |
| 272 | Cleaning of existing cable trenches in Cable gallery, switchyard and other plant areas, complete in all respects |
| 273 | Fire Protection Syatem (As per Section IX-12) |
| 274 | Installation, Erection, Testing, and Commissioning of new Fire protection stytem complete in all respect as per Section-IX-12. |
| 275 | HVAC Systems (As per Section IX-13) |
| 276 | Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services |
| 277 | Earthing and Lightning (As per Section IX-14) |
| 278 | Excavation and refilling of trenches for main grid conductor |
| 279 | Laying of main grid conductor including welding of sections, as required |
| 280 | Laying of risers including welding/ interconnection at both ends |
| 281 | Erection of ground rods including digging and refilling of pits, as per Specifications |
| 282 | Work of laying of ground mat in Power house area for interconnection of digital equipment including inter-connectors and all types of conductors, ground rods, risers etc. as required |
| 283 | Testing and commissioning of complete earthing system |
| 284 | SCADA Systems (As per section IX-8) |
| 285 | Installation,Testing and Commissioning of the SCADA System, including integration of existing retained systems/equipment and associated auxiliaries, complete in all respect |
| 286 | nstallation, Testing and Commissioning of the GPS Time Synchronization System, including all mounting arrangements, cabling, interfacing, configuration and associated services, complete in all respect |
| 287 | EOT Crane and Auxiliaries (As per Section IX-15) |
| 288 | Inspection, testing, repair, resotration , refurbishment of EOT crane,complete in all respect. |
| 289 | Replacement of wire ropes, rope clamps, and associated gaskets of the Main Hoist and Auxiliary Hoist, including safety latches and dismantling of existing components, installation, adjustment, testing, and commissioning, complete in all respect. |
| 290 | Replacement of the existing current conductor system and replace it with a new DSL shrouded conductor system complete with conductor rails, current collectors, insulating supports, expansion joints, feed arrangements, end caps, hanger clamps, joints, and all associated accessories, complete in all respect. |
| 291 | Installation of load cell system or Main and Auxiliary Hoist system complete in all respect. |
| 292 | Replacement of all panels, controllers, contactors, relays, resistances, cabling, wiring, motors, brakes, brake thrusters, limit switches, protection systems, operator controls, lighting, signaling systems, sensors, feedback devices, festoon arrangement and associated accessories |
| 293 | Installation, testing, and commissioning of all panels, associated control equipment, power and control cabling, braking integration, protections, feedback devices, control logic, operator interface, limit switches and all accessories |
| 294 | Overhauling of all Reduction Gear Boxes, complete in all respect. |
| 295 | TRCM & Intake Trash Rack Panels (As per Section IX-9) |
| 296 | Dismantling and removal of the existing trash rack fittings , supports and all associated appurtenance complete in all respect and shifting of unsused material to UJVNL site/store. |
| 297 | Installation and Commissioning of Trash Racks Panels, complete in all respect. |
| 298 | Installation, Testing and Commissioning of TRCM complete in all respect. |
| 299 | Installation, testing, commissioning of new forebay water level and head loss measuring equipment complete with transducers, outdoor type IP 66 protected local control board (LCB) with interface to automatic control system (ACS) of the power station. |
| 300 | Field sand blasting and painting of trash racks and frames. |
| 301 | Painting of embedded parts above water. |
| 302 | Replacement of grating covers by chequered steel plates |
| 303 | Power House Auxiliaries (As per Section IX-16) |
| 304 | Repair, Replacement and Modification of the existing system, including SITC of new components, terminations, interlocks, associated cabling with trays and auxiliaries and integration with existing and new systems through the SCADA interface, including signal transmission, annunciation, tripping, remote monitoring and control functions, complete in all respect. |
| 305 | Overhauling of the existing Air Compressor System,fabrication, installation, testing and commissioning of acoustically treated sound-proof enclosure for the existing compressor units and replacement of the existing delivery line, including all associated works, complete in all respects, as per the relevant specifications. |
| 306 | Work of removing, all old control and instrumentation cables and laying, termination of new cable with associated trays, complete in all respect as per Section-IX-16. |
| 307 | Renovation Work of Control Room, LV Room, Battery Room, and Offices, including Dismantling, Removal, Stacking, and Storage of Unused Materials at Site/Store, along with Installation, Testing, Commissioning, and Other Associated Services. |
| 308 | SCHEDULE 4 - Grand Summary (Schedules no 1 to 3) |
| 309 | SCHEDULE 1 - Plant and Equipment (all New Supplies Including Specified/Mandatory Spare Parts and Tools & Instruments against the tender shall be filled hereunder) with corresponding taxes and duties. |
| 310 | SCHEDULE 2 - Local Transportations Including Port Clearance & Port Charges and Inland Insurance for (all New Supplies Including Specified/Mandatory Spare Parts and Tools & Instruments against the tender shall be filled hereunder) with corresponding taxes and duties. |
| 311 | SCHEDULE 3 - Dismantling, Refurbishment, Installation & Other Services for (all Works against the tender shall be filled hereunder) with corresponding taxes and duties. |
| 312 | Recommended Spare Parts |
| 313 | Recommended Spare Parts Item - 1 |
| 314 | Recommended Spare Parts Item - 2 |
| 315 | Recommended Spare Parts Item - 3 |
| 316 | Recommended Spare Parts Item - 4 |
| 317 | Recommended Spare Parts Item - 5 |
| 318 | Recommended Spare Parts Item - 6 |
| 319 | Recommended Spare Parts Item - 7 |
| 320 | Recommended Spare Parts Item - 8 |
| 321 | Recommended Spare Parts Item - 9 |
| 322 | Recommended Spare Parts Item - 10 |
| 323 | Recommended Spare Parts Item - 11 |
| 324 | Recommended Spare Parts Item - 12 |
| 325 | Recommended Spare Parts Item - 13 |
| 326 | Recommended Spare Parts Item - 14 |
| 327 | Recommended Spare Parts Item - 15 |
| 328 | Recommended Spare Parts Item - 16 |
| 329 | Recommended Spare Parts Item - 17 |
| 330 | Recommended Spare Parts Item - 18 |
| 331 | Recommended Spare Parts Item - 19 |
| 332 | Recommended Spare Parts Item - 20 |
| 333 | Recommended Spare Parts Item - 21 |
| 334 | Recommended Spare Parts Item - 22 |
| 335 | Recommended Spare Parts Item - 23 |
| 336 | Recommended Spare Parts Item - 24 |
| 337 | Recommended Spare Parts Item - 25 |
| 338 | Recommended Spare Parts Item - 26 |
| 339 | Recommended Spare Parts Item - 27 |
| 340 | Recommended Spare Parts Item - 28 |
| 341 | Recommended Spare Parts Item - 29 |
| 342 | Recommended Spare Parts Item - 30 |
| 343 | Recommended Spare Parts Item - 31 |
| 344 | Recommended Spare Parts Item - 32 |
| 345 | Recommended Spare Parts Item - 33 |
| 346 | Recommended Spare Parts Item - 34 |
| 347 | Recommended Spare Parts Item - 35 |
| 348 | Recommended Spare Parts Item - 36 |
| 349 | Recommended Spare Parts Item - 37 |
| 350 | Recommended Spare Parts Item - 38 |
| 351 | Recommended Spare Parts Item - 39 |
| 352 | Recommended Spare Parts Item - 40 |
| 353 | Recommended Spare Parts Item - 41 |
| 354 | Recommended Spare Parts Item - 42 |
| 355 | Recommended Spare Parts Item - 43 |
| 356 | Recommended Spare Parts Item - 44 |
| 357 | Recommended Spare Parts Item - 45 |
| 358 | Recommended Spare Parts Item - 46 |
| 359 | Recommended Spare Parts Item - 47 |
| 360 | Recommended Spare Parts Item - 48 |
| 361 | Recommended Spare Parts Item - 49 |
| 362 | Recommended Spare Parts Item - 50 |
| 363 | Recommended Spare Parts Item - 51 |
| 364 | Recommended Spare Parts Item - 52 |
| 365 | Recommended Spare Parts Item - 53 |
| 366 | Recommended Spare Parts Item - 54 |
| 367 | Recommended Spare Parts Item - 55 |
| 368 | Recommended Spare Parts Item - 56 |
| 369 | Recommended Spare Parts Item - 57 |
| 370 | Recommended Spare Parts Item - 58 |
| 371 | Recommended Spare Parts Item - 59 |
| 372 | Recommended Spare Parts Item - 60 |
| 373 | Recommended Spare Parts Item - 61 |
| 374 | Recommended Spare Parts Item - 62 |
| 375 | Recommended Spare Parts Item - 63 |
| 376 | Recommended Spare Parts Item - 64 |
| 377 | Recommended Spare Parts Item - 65 |
| 378 | Recommended Spare Parts Item - 66 |
| 379 | Recommended Spare Parts Item - 67 |
| 380 | Recommended Spare Parts Item - 68 |
| 381 | Recommended Spare Parts Item - 69 |
| 382 | Recommended Spare Parts Item - 70 |
| 383 | Recommended Spare Parts Item - 71 |
| 384 | Recommended Spare Parts Item - 72 |
| 385 | Recommended Spare Parts Item - 73 |
| 386 | Recommended Spare Parts Item - 74 |
| 387 | Recommended Spare Parts Item - 75 |
| 388 | Recommended Spare Parts Item - 76 |
| 389 | Recommended Spare Parts Item - 77 |
| 390 | Recommended Spare Parts Item - 78 |
| 391 | Recommended Spare Parts Item - 79 |
| 392 | Recommended Spare Parts Item - 80 |
| 393 | Recommended Spare Parts Item - 81 |
| 394 | Recommended Spare Parts Item - 82 |
| 395 | Recommended Spare Parts Item - 83 |
| 396 | Recommended Spare Parts Item - 84 |
| 397 | Recommended Spare Parts Item - 85 |
| 398 | Recommended Spare Parts Item - 86 |
| 399 | Recommended Spare Parts Item - 87 |
| 400 | Recommended Spare Parts Item - 88 |
| 401 | Recommended Spare Parts Item - 89 |
| 402 | Recommended Spare Parts Item - 90 |
| 403 | Recommended Spare Parts Item - 91 |
| 404 | Recommended Spare Parts Item - 92 |
| 405 | Recommended Spare Parts Item - 93 |
| 406 | Recommended Spare Parts Item - 94 |
| 407 | Recommended Spare Parts Item - 95 |
| 408 | Recommended Spare Parts Item - 96 |
| 409 | Recommended Spare Parts Item - 97 |
| 410 | Recommended Spare Parts Item - 98 |
| 411 | Recommended Spare Parts Item - 99 |
| 412 | Recommended Spare Parts Item - 100 Please Enable Macros to View BoQ information |
| 413 | List of \\"Deviations with Cost of Withdrawal\\" |
| 414 | Deviation No. - 1 |
| 415 | Deviation No. - 2 |
| 416 | Deviation No. - 3 |
| 417 | Deviation No. - 4 |
| 418 | Deviation No. - 5 |
| 419 | Deviation No. - 6 |
| 420 | Deviation No. - 7 |
| 421 | Deviation No. - 8 |
| 422 | Deviation No. - 9 |
| 423 | Deviation No. - 10 |
| 424 | Deviation No. - 11 |
| 425 | Deviation No. - 12 |
| 426 | Deviation No. - 13 |
| 427 | Deviation No. - 14 |
| 428 | Deviation No. - 15 |
| 429 | Deviation No. - 16 |
| 430 | Deviation No. - 17 |
| 431 | Deviation No. - 18 |
| 432 | Deviation No. - 19 |
| 433 | Deviation No. - 20 |
| 434 | Deviation No. - 21 |
| 435 | Deviation No. - 22 |
| 436 | Deviation No. - 23 |
| 437 | Deviation No. - 24 |
| 438 | Deviation No. - 25 |
| 439 | Deviation No. - 26 |
| 440 | Deviation No. - 27 |
| 441 | Deviation No. - 28 |
| 442 | Deviation No. - 29 |
| 443 | Deviation No. - 30 |
| 444 | Deviation No. - 31 |
| 445 | Deviation No. - 32 |
| 446 | Deviation No. - 33 |
| 447 | Deviation No. - 34 |
| 448 | Deviation No. - 35 |
| 449 | Deviation No. - 36 |
| 450 | Deviation No. - 37 |
| 451 | Deviation No. - 38 |
| 452 | Deviation No. - 39 |
| 453 | Deviation No. - 40 |
| 454 | Deviation No. - 41 |
| 455 | Deviation No. - 42 |
| 456 | Deviation No. - 43 |
| 457 | Deviation No. - 44 |
| 458 | Deviation No. - 45 |
| 459 | Deviation No. - 46 |
| 460 | Deviation No. - 47 |
| 461 | Deviation No. - 48 |
| 462 | Deviation No. - 49 |
| 463 | Deviation No. - 50 |
| 464 | Deviation No. - 51 |
| 465 | Deviation No. - 52 |
| 466 | Deviation No. - 53 |
| 467 | Deviation No. - 54 |
| 468 | Deviation No. - 55 |
| 469 | Deviation No. - 56 |
| 470 | Deviation No. - 57 |
| 471 | Deviation No. - 58 |
| 472 | Deviation No. - 59 |
| 473 | Deviation No. - 60 |
| 474 | Deviation No. - 61 |
| 475 | Deviation No. - 62 |
| 476 | Deviation No. - 63 |
| 477 | Deviation No. - 64 |
| 478 | Deviation No. - 65 |
| 479 | Deviation No. - 66 |
| 480 | Deviation No. - 67 |
| 481 | Deviation No. - 68 |
| 482 | Deviation No. - 69 |
| 483 | Deviation No. - 70 |
| 484 | Deviation No. - 71 |
| 485 | Deviation No. - 72 |
| 486 | Deviation No. - 73 |
| 487 | Deviation No. - 74 |
| 488 | Deviation No. - 75 |
| 489 | Deviation No. - 76 |
| 490 | Deviation No. - 77 |
| 491 | Deviation No. - 78 |
| 492 | Deviation No. - 79 |
| 493 | Deviation No. - 80 |
| 494 | Deviation No. - 81 |
| 495 | Deviation No. - 82 |
| 496 | Deviation No. - 83 |
| 497 | Deviation No. - 84 |
| 498 | Deviation No. - 85 |
| 499 | Deviation No. - 86 |
| 500 | Deviation No. - 87 |
| 501 | Deviation No. - 88 |
| 502 | Deviation No. - 89 |
| 503 | Deviation No. - 90 |
| 504 | Deviation No. - 91 |
| 505 | Deviation No. - 92 |
| 506 | Deviation No. - 93 |
| 507 | Deviation No. - 94 |
| 508 | Deviation No. - 95 |
| 509 | Deviation No. - 96 |
| 510 | Deviation No. - 97 |
| 511 | Deviation No. - 98 |
| 512 | Deviation No. - 99 |
| 513 | Deviation No. - 100 |
AI Tender Summary
Tender Timeline
Jun 30, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 34 daysAug 10, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 39 days