Power Government Departments Closing in 34 days TDR #56227033

Tender for Tender for Renovation, Modernization And Upgradation Of Kulhal Hydroelectric Project On Turn Key Basis

Issued by Government Departments · Dehradun, Uttarakhand
Tender Value
110.57 Crore
Estimated cost
Bid Submission
05 Aug 2026
34 days left
EMD
2.22 Crore
Bank guarantee accepted
Document Fee
1.18 Lakhs
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Dehradun → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Renovation, Modernization And Upgradation Of Kulhal Hydroelectric Project On Turn Key Basis

BOQ

Name of Work:- RMU works of Kulhal (3X10 MW) HEP
Sl. No. Item Description
1SCHEDULE 1 - Plant and Equipment (all New Supplies Including Specified/Mandatory Spare Parts and Tools & Instruments against the tender shall be filled hereunder) with corresponding taxes and duties.
2Turbine and Auxiliaries (As per Section IX-1)
3Runner Chamber,complete in all respect.
4Compensating Cone, complete in all respect.
5Runner Assembly with its Operating Mechanism ,complete in all respects.
6Turbine Shaft along with Fastners and Coupling Bolts, complete in all respect.
7Top Cover/ Head Cover complete in all respect.
8Bottom Ring/ Lower Ring complete in all respect.
9Turbine Guide Bearing Assembly complete in all respect.
10Turbine Shaft Seal Assembly & its cooling system complete in all respect.
11Regulating Ring, complete in all respect.
12Guide vanes complete in all respect.
13Linkage Mechanism (Guide Vane Servomotor, Lever, Links, pins and Spacers, bush housing, self lubricating bushes & sliding guides for all locations including bolting materials,fastener and appruntenances etc.), complete in all respect.
14Supply of Turbine Discharge Flowmeter (Ultrasonic Intrusive type) Including all other mechancial equipment and accessories, monitoring & data acquisition system, complete in all respect.
15Bottom Ring/Lower Ring Guide Vane Self-lubricated Bushes, complete in all respect.
16Top Cover/Head Cover Drainage Pumps complete in all respect.
17Runner Oil Head Assembly and its Associated Parts, complete in all respect.
18Sealing material, O rings, gaskits, pin & fastnesrs for manholes of penstock , draft tube and spiral casing complete in all respect.
19Lighting, Ventilation equipment & Thermal insulation piping of Turbine Pit, complete in all respect.
20Turbine Gauge panel complete in all respect.
21Mobile oil handling set for oil filtration and conditioning complete in all respect.
22Spiral Casing Drain Valve including associated flanges, complete in all respect.
23Penstock Drain Valve including associated flanges, complete in all respect.
24Draft Tube Drain Valve with extended spindle arrangement, complete in all respect.
25Draft Tube Liner, complete in all respect.
26Paint material for spiral casing ,Draft tube & draft tube gates etc.complete in all respect.
27Special spare parts as per clause 4.1.2 (a) (xxxix)
28Special spare parts as per clause 4.1.2 (a) (xxxii)
29Special spare parts as per clause 4.3 (x)
30Special spare parts as per clause 4.5.2 (g)
31Special spare parts as per clause 4.6.2 (xix)
32Special spare parts as per clause 4.7.2 (lvii)
33Special spare parts as per clause 4.8.2 (a) (xxxvi)
34Special spare parts as per clause 4.5.3
35Hydraulic Torque Tensioner with power pack for Runner/Turbine shaft coupling bolts.
36Hydraulic Torque Tensioner with power pack for Turbine shaft/ Generator shaft flange coupling bolts.
37Special Handling Devices and Fixtures for Turbine Components, complete in all respect.
38Draft Tube Inspection & Maintenance Platform (removable), complete in all respect.
39All Special Tools and Instruments, required for Assembly, Disassembly, Maintenance and handling of the equipment, complete in all respect.
40Templates for the Kaplan Runner Blade profiles
41Templates for the Guide Vane profiles
42Manual Noise Measuring Instrument
43Governing System and Auxiliaries (As per Section IX-2)
44Supply of New Hgh Pressure Governing system with digital control panel, including monitoring & data acquisition system, complete in all respect.
45Supply of all wiring, power, control, signal, and instrumentation cables, Local Control Box (LCB), earthing materials, and associated accessories required for the Governor System, complete in all respect.
46Digital Electronic Controller complete in all respect.
47Supply of Nitrogen-Charged Hydraulic Accumulator complete with all accessories, mounting arrangements, fittings, and associated components, in all respects.
48Supply of Governor Oil Pressure Unit (OPU) complete with oil tank, pumps, valves, piping, instruments, controls, and all associated accessories, in all respects.
49Nitrogen Bank for Governor system.
50Miscellaneous Components and Auxiliary Systems complete in all respect
51Control, Monitoring and Related items and Services complete in all respect.
52Mandatory spare parts for Govering system as per clause 20
53Mechanical/ Hydraulic over speed protection device.
54Control/Starter Panels (LCB) for auxiliaries.
55Coordination and supply of associated interfaces, provision of necessary contacts and/ports for integration of generators, accessories and monitoring systems with plant SCADA system including all hardware, software, services and other inputs complete in all respect.
56Cooling System (As per Section IX-5)
57Supply of materials for the Cooling Water (CW) system, including pipes, flanges, valves, non-return valves (NRVs), flow meters, pressure gauges, Booster pumps,Strainer system and all associated accessories complete in all respect.
58Supply of all wiring for power, control, signal, and instrumentation cables and earthing material required for the Cooling Water (CW) system complete In all respect.
59Supply of matrial for building platform of cooling water system complete in all respect.
60Supply of all necessary instrumentation and control devices, including sensors, transmitters, alarm and annunciation panel, cabling, and wiring etc. complete in all respect
61Supply of Local Control Board (LCB) for Cooling water system complete in all respect.
62Mandatory Spare Parts for Cooling Water System, as per clause 4.9.
63Generator and Auxiliaries (As per Section-IX-3)
64Supply of Stator Core & Punching, complete in all respect.
65Supply of Stator Winding, complete in all respect.
66Supply of Collector RIng/Slip Ring Assembly, Rotor Current Carrying Leads, Carbon Brush Assembly & Slip Ring Housing Assembly complete in all respect.
67Supply of Rotor Pole Assemblies, including Field Windings, Pole Bodies, and Pole Fixing Arrangements, complete in all respect.
68Supply of Carbon Dust Collector System, complete in all respect.
69Supply of Oil Mist Exhaust System, complete in all respect.
70Supply of Brake Dust Collector System, complete in all respect.
71Supply of Generator Shaft Assembly including all other accessories, complete in all respect.
72Supply of Brake Liner, complete in all respect.
73Supply of Generator Thrust & Guide Bearing Assembly including bearing pads, support structure, oil retaining and distribution components, temperature detectors, instrumentation and all associated accessories, complete in all respect.
74Supply of Condensate Management System, complete in all respect.
75Supply of complete Stator Air Cooling System (air water heat exchanger type) including coolers, piping, fittings, valves, gaskets, supports, interconnections, and all associated accessories, complete in all respect.
76Supply of complete High-Speed Lifting System (HSLS) with all associated equipment, piping, fittings, valves, instrumentation, control components, and accessories, complete in all respect.
77Supply of complete Water Mist Fire Protection System for Generator, including all equipment, piping, fittings, valves, controls, accessories, and associated components required for a complete and functional system, complete in all respect.
78Supply Space Heaters including LCB with local/remote, manual/ automatic control features; interface to ACS complete in all respect.
79Supply of Generator Monitoring and Interface Cubicles, complete in all respect.
80Supply of Vibration Monitoring System, complete in all respect.
81Supply of Brake Ring & Carrier and Rotor Fan Assembly complete in all respect.
82Supply of Extension Shaft/ Stub shaft complete in all respect.
83Supply of Generator Cover and Lower Bracket Platform complete in all respect.
84Mandatory Spare parts for stator Air cooler and cooling system as per clause 12.1.1(b),xviii.
85Mandatory Spare parts for Rotor Hub, Spider & Rim Assembly as per clause 3.6.2 (j).
86Mandatory Spare parts for Rotor Pole Assembly as per clause 3.7.2 (xxxviii)
87Mandatory Spare parts for Brake Dust collection system, as per clause 14.2.21
88Mandatory Spare parts for Mist Fire Extinguisher system of Hydro-generator, as per clause 15.2.27.
89Mandatory Spare parts for Brake and Jacking System, as per clause 16.2.25.
90Mandatory Spare parts for Carbon Dust Collector System as per clause.17.2.16.
91Mandatory Spare parts for Vibration monitoring system as per clause 18.2.24
92Mandatory Spare parts for HSLS as per clause 20.2.20.
93Mandatory Spare parts for Thrust and Guide Bearing Assembly, as per clause 3.4.3(llll).
94Mandatory Spare parts for Generator Shaft Assembly,3.5.3 (s).
95Mandatory Spare parts for Stub Shaft Assembly as per clause 7.3.22
96Mandatory Spare parts for Carbon Brush Assembly as per clause. 9.2.
97Mandatory Spare parts for Slip Ring Housing Assembly as per clause 10.3.14.
98Mandatory Spare parts for Stator Winding as per clause 11.3.1 (m),(Viii).
99Supply of all Special Tools & Plants (T&P), tackles, fixtures, handling devices, and maintenance instruments required for assembly, disassembly, maintenance, inspection, and handling of the equipment, complete in all respect
100Supply of Rotor Rim Assembly complete in all respect.
101Excitation system and Auxiliaries (As per Section-IX-4)
102Static Excitation System Equipments complete with digital type AVR , Exciatation Transformer and other accessories, complete in all respect, as per Section -IX-4.
103Tool and Instruments, Laptop (01 nos) for testing, commissioning and setting of parameters,
104Mandatory spare parts for Excitation system, as per clause 4.1.
105Instrumentation and Control System (As per Section IX-6)
106All Supply of Instrumentation and Control system, as per Section IX-6.
107Generator Termination Equipment (As per Section IX-3)
108Neutral grounding cubicles complete with neutral grounding transformers, current limiting resistor, disconnecting switch etc.complee
109Branch – off and CT for connecting the excitation transformers
110Branch – off and CT for connecting the unit auxiliary transformers
111Line side current transformers
112Neutral side current transformers
113Voltage transformers
114Surge protection equipment
115Generator Transformer and Auxiliaries (As per Section-IX-7)
116Supply of Generator Transformer 6.6/132 kV, 50 Hz, 12.5 MVA (ONAN Type) with Marshalling Kiosks and related accessories complete in all respects.
117Supply of Nitrogen Injection Fire Protection System complete with all accessories, pipe, fitting , valve etc for Generator Transformers, in all respects.
118Lightning protection system for Generator Transformers comprising of lightning protection conductors, lightning masts with peaks, lightning arrestors, grounding flat connectors etc. complete in all respect.
119Special spare parts Generator Transformera as per clause 15.1
120UPS and Auxiliaries (As per Section-IX-10)
121Uninterrupted Power Supply (UPS) System, as per specification, complete in all respect
122Cables & Cabling System (As per Section-IX-11)
1233.5x95 mm², XLPE insulated,Al,Armoured,cable including all accessories.
1243.5x70 mm², XLPE insulated,AL,Armoured cable including all accessories.
1253.5x25 mm², XLPE insulated, AL,Armoured cable including all accessories.
1264x6 mm², XLPE insulated,Copper conductor,Armoured, cable including all accessories.
1271.1 kV,1.5 mm² x 4 core Copper Armoured control cables, including all accessories
1281.1 kV,1.5 mm² x 8 core Copper Armoured control cables, including all accessories
1291.1 kV,1.5 mm² x 12 core Copper Armoured control cables, including all accessories
1301.1 kV,6 mm² x 2 core Copper Armoured control cables, including all accessories
1311.1 kV,4 mm² x 2 core Copper Armoured control cables, including all accessories
1321.1 kV, 1.5mm² x 4 core Copper Armoured control cables, including all accessories
1331.1 kV,1.5 mm² x 16 core Copper Armoured control cables, including all accessories
1341.1 kV,1.5 mm² x 4 core Copper Unarmoured control cables including all accessories
1351.1 kV,1.5 mm² x 8 core Copper Unarmoured control cables including all accessories
1361.1 kV,1.5 mm² x 12 core Copper Unarmoured control cables including all accessories
1371.1kV,1.5 mm² x 16 core Unarmoured Copper control cables including all accessories
1381.1 kV,1.5 mm² x 4core Copper Unarmoured control cables including all accessories
1391.1kV,4 mm² x 4 core copper unarmoured control cables including all accessories
1401.1kV,0.75 mm² x 4 core shield control cables including all accessories
1411.1kV,6 mm² x 4 core Unarmoured Copper control cables including all accessories
142Supply of Cable Trays, Cable Racks, and all associated accessories, including supports, brackets, clamps, fasteners, bends, tees, reducers, and other required fittings, complete in all respects
143Any cable not specifically covered above but necessarily required for completeness of power, control, instrumentation, signal, and termination works, complete in all respects.
144Fire Protection System (As per Section-IX-12)
145Supply of Fire Detection & Alarm Panel for Power House and associated plant areas, complete with compatible smoke detectors, modules, annunciation devices, SCADA interface, accessories, and all associated components, in all respects.
146Supply of Smoke Detection System for Control Room, Cable Trenches/Galleries, Battery Room, LT Rooms,Turbine & Generator floor UAT & SAT room and other electrical and control equipment areas, complete in all respects.
147Mandatory spare parts for fire protection system, as per clause 8.
148HVAC System (As per Section-IX13)
149Supply of HVAC system I.e exhaust fans, ventilation duct etc.complete in all respect.
150Earthing and Lightning System (As per Section-IX-14)
151Main grid conductor
152Risers
153Ground rods, earthing material (salt & charcoal), connector etc.
154SCADA System (As per Section-IX-8)
155Supply of Control & Monitoring System comprising SCADA Control Boards, Routers/Gateways, Workstations, Industrial Computers, Large Screen LED Display Unit, Control Network, Optical Fibre Cables, Software, Control & Instrumentation Cables, Printers, Operating Keyboards and all associated accessories, complete in all respect.
156Supply of Global positioning System (GPS) including antenna, surge protection, cable, master clock, interface, supply system etc.complete in all respect.
157Mandatory spare parts for SCADA system as per clause 6.7.
158EOT Crane and Auxiliaries(As per Section-IX-15)
159Supply of Hoist wire Ropes with clamps for Main and Auxiliary Hoists, complete in all respect.
160Supply of Wireless remote control
161Supply of independent load cell system for main and aurxiliary hoist, complete in all respect.
162Supply all panels, controllers, contactors, relays, resistances, cabling, wiring, motors, brakes, brake thrusters, limit switches, protection systems, operator controls, lighting, signaling systems, sensors, feedback devices, DSL system, VFD drive, Festoon arrangement and associated accessories , complete in all respect.
163Mandatory spare parts for EOT crane as per clause 5.0.
164TRCM & Trash Rack Panels (As per Section IX-9)
165Supply of New standard cable operated TRCM with automatic cable reeling drum, movable trash collecting container, jib-type revolving hoist and associated accessories as per specification , complete in all respect.
166Supply of New Trash Rack and New Rail Track, including all associated accessories, complete in all respect.
167Chequered steel plates for rplaceing grating cover.
168Mandatory spare parts for TRCM as per clause 7.0.
169Supply of Water level transmitter and indicator/ recording instruments (compatible with ACS) in headrace and tailrace side along with required panels Consumables, complete in all respect.
170Power House Auxiliaries (As per Section IX-16)
171Supply of Material for Overhauling of Existing Air Compressor System, acoustically treated sound-proof enclosure,all CTs and VTs associated with metering and protection of Generator and UAT, Excitation Transformer and SAT complete in all respect.
172Supply of Material for Renovation of Control Room, LV Rooms, Battery Room, and Offices, complete in all respect.
173Split AC 2.0 Ton, including voltage stablizer complete in all respect.
174SCHEDULE 2 - Local Transportations Including Port Clearance & Port Charges and Inland Insurance for (all New Supplies Including Specified/Mandatory Spare Parts and Tools & Instruments against the tender shall be filled hereunder) with corresponding taxes and duties.
175Freight & Insurance Charges for all Components of the Turbine and Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-1)
176Freight & Insurance Charges for all Components of the Governor and Auxiliaries its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-2)
177Freight & Insurance Charges for all Components of the Generator and Auxiliries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-3)
178Freight & Insurance Charges for all Components of the Exciatation System and Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges, Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-4)
179Freight & Insurance Charges for all Components of the Cooling System and its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-5)
180Freight & Insurance Charges for all Components of the Instrumentation & Control System and its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-6)
181Freight & Insurance Charges for all Components of the Generator Transformer and Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respects for two units (as per Section IX-7)
182Freight & Insurance Charges for all Components of the SCADA System and its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-8)
183Freight & Insurance Charges for all Components of the TRCM & Trash Rack Panels, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,, packaging, unloading, and stacking, complete in all respect (as per Section IX-9)
184Freight & Insurance Charges for all Components of the UPS & Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties,packaging, unloading, and stacking, complete in all respect (as per Section IX-10)
185Freight & Insurance Charges for all Items of Cables & Cabling System and its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-11)
186Freight & Insurance Charges for all Items of Fire Protection System its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-12)
187Freight & Insurance Charges for all Items for HVAC System, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-13)
188Freight & Insurance Charges for all Items for Earthing and Lightining system, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respects (as per Section IX-14)
189Freight & Insurance Charges for all Items for EOT Crane and Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-15)
190Freight & Insurance Charges for all Items for Power House Auxiliaries, its Specified/Mandatory Spares, Tools & Instruments, and Testing Devices/Instruments, including Port Clearance, Port Charges,Entry Tax, Toll Tax, Octroi Tax,Inland Insurance along with corresponding taxes and duties, packaging, unloading, and stacking, complete in all respect (as per Section IX-16)
191SCHEDULE 3 - Dismantling, Refurbishment, Installation & Other Services for (all Works against the tender shall be filled hereunder) with corresponding taxes and duties.
192Reverse Engineering complete in all respect.
193Model Test
194Major Design
195Turbine & Auxiliaries (As per Section - IX-1)
196Site Inspection and Testing for Penstock, Draft Tube with DT cone & Spiral casing complete in all respect.
197Site Inspection and Testing for Stay Vanes & Stay Ring with Flanges.complete in all respect.
198Repair,Restoration, Refurbishment and Painting & Coating of Penstock, Draft Tube with DT cone,turbine pit and spiral Casing complete in all respect .
199Testing, commissioning of new flow metering and pressure measuring equipment for each turbine, complete with IP 66 protected local control board (LCB) with interface to automatic control system (ACS) of the power station, including all internal LV power and signal cabling.complete in all respect.
200Repair,Restoration & Refurbishment of Stay Vanes & Stay Ring with Flanges complete in all respect.
201Installation,ErectionTesting & Commissioning of Runner Chamber Complete in all respect.
202Installation,Erection,Testing & Commissioning of Compensating Cone complete in all respect.
203Installation,Erection,Testing, and Commissioning of Runner Assembly complete in all respect.
204Installation,Erection,Testing, and Commissioning of Turbine Shaft complete in all respect.
205Installation,Erection,Testing, and Commissioning of Top Cover/Head Cover complete in all respect.
206Installation,Erection,Testing, and Commissioning of Top Bottom Ring/ Lower Ring complete in all respect.
207Installation,Erection,Testing, and Commissioning of Turbine Guide Bearing Assembly complete in all respect.
208Installation,Erection,Testing, and Commissioning of Turbine Shaft Seal Assembly & its Cooling System complete in all respect.
209Installation,Erection,Testing, and Commissioning of Guide Vane Assembly including all associated mechanical accessories, complete in all respect.
210Installation,Erection,Testing, and Commissioning of Regulating Ring & Linkage Mechanism including all associated mechanical accessories,complete in all respect.
211Installation,Erection,Testing, and Commissioning of Turbine Discharge Flow Meter (Ultrasonic intrusive type) including all other associated mechanical accessories, monitoring & data acquisition system and integration with plant SCADA system complete in all respect.
212Refurbishment of manhole doors and window of penstock,window draft tube & window spiral casing including replcement of O rings, gaskits, pin & fastnesrs etc complete in all respect.
213Hydro blasting/shot blasting complete painting (Primer & Finish) of inside and outside surfaces (exposed) of Penstock, Draft Tube & Spiral Casing including all arrangements for completion of work.
214Dismantling, removal, handling, stacking, transportation, and storage of all existing components, Including unused, unserviceable, and scrap materials, at the designated UJVNL site/store, complete in all respect.
215Governors and Auxiliaries (As per Section IX-2 )
216Dismantling and removal of the existing Governing System, including but not limited to the HMC, HP and LP Compressor Systems, OPU System, Guide Vane Servomotors, Master Switch, Feedback Mechanism, interconnecting pipelines, and all associated appurtenances, including all miscellaneous repair works, and stacking and storing of dismantled/unused materials at the UJVNL site/store.
217Installation,Erection,Testing, and Commissioning of New Governing System complete in all respect.
218Construction of foundations and platforms for the Governing System equipment including covering of nearby cavities/openings with suitable chequered plates, and execution of all necessary civil works arising out of the replacement activities, complete in all respect.
219Installation, Erection,Testing & Commissioning of all power, control, signal, and instrumentation cables along with cable tray, Local Control Box (LCB), earthing and associated accessories required for the Governor System, complete in all respect.
220Cooling System (as per section IX-5)
221Dismantling, removal, stacking, and storage of unused materials at the UJVNL site/store; execution of all miscellaneous repair works; and Installation, Erection, Testing, and Commissioning of the New Cooling Water System, including builing platfom and all associated services, complete in all respects.
222Generators and Auxiliaries (As per Section IX-2)
223Inspection, engineering evaluation, structural integrity verification, residual life assessment of Stator and Lower Bracket Foundation, including FEA and associated studies, complete in all respect.
224Refurbishment/Strengthening of Stator and Lower Bracket Foundation, as required based on the findings of inspection and assessment, complete in all respect.
225Inspection, engineering evaluation, structural integrity verification, residual life assessment of Lower Supporting Bracket, including FEA and associated studies, complete in all respect.
226Refurbishment/Strengthening of Lower Supporting Bracket, as required based on the findings of inspection and assessment, complete in all respect.
227Inspection, engineering evaluation, structural integrity verification, residual life assessment of Upper Supporting Bracket, including FEA and associated studies, complete in all respect.
228Refurbishment/Strengthening of Upper Supporting Bracket, as required based on the findings of inspection and assessment, complete in all respect.
229Refurbishment, Inspection, Testing, and necessary repair of Stator Frame, complete in all respect.
230Installation, assembly, alignment, testing, and commissioning of new stator core including dismantling and removal of existing stator core, complete in all respect.
231Refurbishment of Rotor Hub and Spider, including necessary repairs and restoration works, complete in all respect.
232Installation, assembly, alignment, testing, and commissioning of new stator winding, including dismantling and removal of the existing stator winding, complete in all respect.
233Installation, assembly, alignment, testing, and commissioning of new Collector RIng/Slip Ring Assembly, Rotor Current Carrying Leads, Carbon Brush Assembly, & Slip Ring Housing Assembly including dismantling and removal of the existing, complete in all respect.
234Installation, assembly, testing, and commissioning of carbon dust collector system ,complete in all respect.
235Installation, assembly, testing, and commissioning of oil mist exhaust system, complete in all respect.
236Installation, assembly, testing, and commissioning of brake dust collector system ,complete in all respect.
237Refurbishment and upgradation of the existing Brake and Jacking System, including required modifications for compatibility and integration with the new ACS, complete in all respect.
238Replacement of Brake Liners, including dismantling of existing liners and installation of new liners, complete in all respect.
239Installation, assembly, testing, and commissioning of Monitoring System, complete in all respect.
240Installation, assembly, testing, and commissioning of Vibration Monitoring System, complete in all respect.
241Installation, assembly, testing, and commissioning of Generator Monitoring and Interface Cubical, complete in all respect.
242Installation,testing, and commissioning of standstill Heaters with LCB, complete in all respect.
243Inspection, Repair & Refurbishment of Generator Pit & Barrel complete in all respect.
244Provideing Generator Barrel Lighting including all fixtures, wiring, accessories, and associated works, complete in all respect.
245Replacement of Pole Assemblies, including pole windings, pole bodies, and pole fixing arrangements, comprising dismantling and removal of existing pole assemblies and installation of new pole assemblies, complete in all respect.
246Replacement of Extension Shaft/Stub Shaft Assembly, comprising dismantling and removal of the existing assembly and installation and alignment of the new Extension Shaft/Stub Shaft Assembly, complete in all respect.
247Replacement of Rotor Rim, comprising dismantling and removal of the existing rotor rim, installation, alignment, and fitting of the new rotor rim, complete in all respect.
248Replacement of Thrust Bearing Assembly and Guide Bearing Assembly, comprising dismantling and removal of the existing thrust bearing assembly and guide bearing assembly, and installation, alignment, testing, and commissioning of the new thrust bearing assembly and guide bearing assembly, complete in all respect.
249Replacement of Stator Air Cooler & Cooling System, comprising dismantling and removal of the existing Stator Air Cooler & Cooling System along with associated piping, fittings, and accessories, and installation, testing, and commissioning of the Stator Air Cooler & Cooling System Including Condensate Collecting System work,complete in all respect.
250Installation, assembly, testing, and commissioning of High-Speed Lifting System (HSLS), including all piping, fittings, accessories, and associated works, complete in all respect
251Installation, testing, and commissioning of Water Mist Fire Protection System for Generator, including all piping, nozzles, valves, supports, fittings, accessories, and associated works and Integration with fire alarm system & ACS complete in all respect.
252Installation, assembly, testing, and commissioning of Brake Ring & Carrier, Rotor Fan Assembly complete in all respect.
253Installation & assembly Generator Cover and Lower Bracket Platform complete in all respect.
254Excitation system and Auxiliaries (As per Section IX-4)
255Dismantling, removal, stacking, and storage of existing/unused materials at the site/store of UJVNL, and Installation, Erection, Testing, and Commissioning of the new Excitation System, including Excitation Transformer, accessories, and associated works, complete in all respects.
256Instrumentation and Control System (As per Section IX-6)
257installation, testing, calibration, and commissioning of the complete instrumentation and control (I&C) system required for monitoring, control, protection, and safe operation of the turbine, generator, and auxiliary systems etc. complete in all respect.
258Generator Termination Equipment (As per Section IX-3)
259Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and Installation, erection, testing and commissioning of Gnerator Termination Equipments, complete in all respects.
260Generator Transformers and Auxiliaries (As per Section IX-7)
261Dismantling, removal and storage of the existing Generator transformer and associated material at site/store of UJVNL, including all miscellaneous repair works, complete in all respect.
262Installation, Erection, Testing, and Commissioning of the new Generator Transformer (ONAN Type) Integration with Nitrogen Injection Fire Protection System, including all mechanical, civil and miscellaneous installation/repair works required for complete installation and commissioning, complete in all respect.
263Design and construction of Transformer Oil Pit inline with the Nirogen injection fire protection system ( 2no. for new , 01 for existing) complete in all respect.
264UPS and Auxiliaries (As per Section IX-10)
265Installation, erection, testing and commissioning of new UPS system capable to supply uninterrupted power to SCADA servers, Operator work stations, RTUs / PLC panels, Control and protection panels, Communication equipment, Emergency lighting system complete in all respects.
266Cables and Cabling System (As per Section IX-11)
267Disconnection and removal from site of all power, control,signal, instrumnetation cables of all sizes, shifting of removed cables to stores, and supply erection testing and commissioning of all new cables including all assesiories complete in all respect.
268Dismantling of damaged cable tray and racks from all location and Installation, erection, alignment, fixing, and commissioning of new Cable Trays and Cable Racks, including supports, brackets, clamps, fasteners, bends, tees, reducers, and all associated accessories, complete in all respects.
269Laying, dressing, termination, testing, and commissioning of all existing power, control, instrumentation, and signal cables, including all accessories and associated works, complete in all respects
270Laying, dressing, termination, testing, and commissioning of power, control, instrumentation, and signal cables, including all accessories and associated works, complete in all respects
271Surface preparation and painting of cable racks with primer and finish and application of fire-retardant coating on cables complete in all respect.
272Cleaning of existing cable trenches in Cable gallery, switchyard and other plant areas, complete in all respects
273Fire Protection Syatem (As per Section IX-12)
274Installation, Erection, Testing, and Commissioning of new Fire protection stytem complete in all respect as per Section-IX-12.
275HVAC Systems (As per Section IX-13)
276Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
277Earthing and Lightning (As per Section IX-14)
278Excavation and refilling of trenches for main grid conductor
279Laying of main grid conductor including welding of sections, as required
280Laying of risers including welding/ interconnection at both ends
281Erection of ground rods including digging and refilling of pits, as per Specifications
282Work of laying of ground mat in Power house area for interconnection of digital equipment including inter-connectors and all types of conductors, ground rods, risers etc. as required
283Testing and commissioning of complete earthing system
284SCADA Systems (As per section IX-8)
285Installation,Testing and Commissioning of the SCADA System, including integration of existing retained systems/equipment and associated auxiliaries, complete in all respect
286nstallation, Testing and Commissioning of the GPS Time Synchronization System, including all mounting arrangements, cabling, interfacing, configuration and associated services, complete in all respect
287EOT Crane and Auxiliaries (As per Section IX-15)
288Inspection, testing, repair, resotration , refurbishment of EOT crane,complete in all respect.
289Replacement of wire ropes, rope clamps, and associated gaskets of the Main Hoist and Auxiliary Hoist, including safety latches and dismantling of existing components, installation, adjustment, testing, and commissioning, complete in all respect.
290Replacement of the existing current conductor system and replace it with a new DSL shrouded conductor system complete with conductor rails, current collectors, insulating supports, expansion joints, feed arrangements, end caps, hanger clamps, joints, and all associated accessories, complete in all respect.
291Installation of load cell system or Main and Auxiliary Hoist system complete in all respect.
292Replacement of all panels, controllers, contactors, relays, resistances, cabling, wiring, motors, brakes, brake thrusters, limit switches, protection systems, operator controls, lighting, signaling systems, sensors, feedback devices, festoon arrangement and associated accessories
293Installation, testing, and commissioning of all panels, associated control equipment, power and control cabling, braking integration, protections, feedback devices, control logic, operator interface, limit switches and all accessories
294Overhauling of all Reduction Gear Boxes, complete in all respect.
295TRCM & Intake Trash Rack Panels (As per Section IX-9)
296Dismantling and removal of the existing trash rack fittings , supports and all associated appurtenance complete in all respect and shifting of unsused material to UJVNL site/store.
297Installation and Commissioning of Trash Racks Panels, complete in all respect.
298Installation, Testing and Commissioning of TRCM complete in all respect.
299Installation, testing, commissioning of new forebay water level and head loss measuring equipment complete with transducers, outdoor type IP 66 protected local control board (LCB) with interface to automatic control system (ACS) of the power station.
300Field sand blasting and painting of trash racks and frames.
301Painting of embedded parts above water.
302Replacement of grating covers by chequered steel plates
303Power House Auxiliaries (As per Section IX-16)
304Repair, Replacement and Modification of the existing system, including SITC of new components, terminations, interlocks, associated cabling with trays and auxiliaries and integration with existing and new systems through the SCADA interface, including signal transmission, annunciation, tripping, remote monitoring and control functions, complete in all respect.
305Overhauling of the existing Air Compressor System,fabrication, installation, testing and commissioning of acoustically treated sound-proof enclosure for the existing compressor units and replacement of the existing delivery line, including all associated works, complete in all respects, as per the relevant specifications.
306Work of removing, all old control and instrumentation cables and laying, termination of new cable with associated trays, complete in all respect as per Section-IX-16.
307Renovation Work of Control Room, LV Room, Battery Room, and Offices, including Dismantling, Removal, Stacking, and Storage of Unused Materials at Site/Store, along with Installation, Testing, Commissioning, and Other Associated Services.
308SCHEDULE 4 - Grand Summary (Schedules no 1 to 3)
309SCHEDULE 1 - Plant and Equipment (all New Supplies Including Specified/Mandatory Spare Parts and Tools & Instruments against the tender shall be filled hereunder) with corresponding taxes and duties.
310SCHEDULE 2 - Local Transportations Including Port Clearance & Port Charges and Inland Insurance for (all New Supplies Including Specified/Mandatory Spare Parts and Tools & Instruments against the tender shall be filled hereunder) with corresponding taxes and duties.
311SCHEDULE 3 - Dismantling, Refurbishment, Installation & Other Services for (all Works against the tender shall be filled hereunder) with corresponding taxes and duties.
312Recommended Spare Parts
313Recommended Spare Parts Item - 1
314Recommended Spare Parts Item - 2
315Recommended Spare Parts Item - 3
316Recommended Spare Parts Item - 4
317Recommended Spare Parts Item - 5
318Recommended Spare Parts Item - 6
319Recommended Spare Parts Item - 7
320Recommended Spare Parts Item - 8
321Recommended Spare Parts Item - 9
322Recommended Spare Parts Item - 10
323Recommended Spare Parts Item - 11
324Recommended Spare Parts Item - 12
325Recommended Spare Parts Item - 13
326Recommended Spare Parts Item - 14
327Recommended Spare Parts Item - 15
328Recommended Spare Parts Item - 16
329Recommended Spare Parts Item - 17
330Recommended Spare Parts Item - 18
331Recommended Spare Parts Item - 19
332Recommended Spare Parts Item - 20
333Recommended Spare Parts Item - 21
334Recommended Spare Parts Item - 22
335Recommended Spare Parts Item - 23
336Recommended Spare Parts Item - 24
337Recommended Spare Parts Item - 25
338Recommended Spare Parts Item - 26
339Recommended Spare Parts Item - 27
340Recommended Spare Parts Item - 28
341Recommended Spare Parts Item - 29
342Recommended Spare Parts Item - 30
343Recommended Spare Parts Item - 31
344Recommended Spare Parts Item - 32
345Recommended Spare Parts Item - 33
346Recommended Spare Parts Item - 34
347Recommended Spare Parts Item - 35
348Recommended Spare Parts Item - 36
349Recommended Spare Parts Item - 37
350Recommended Spare Parts Item - 38
351Recommended Spare Parts Item - 39
352Recommended Spare Parts Item - 40
353Recommended Spare Parts Item - 41
354Recommended Spare Parts Item - 42
355Recommended Spare Parts Item - 43
356Recommended Spare Parts Item - 44
357Recommended Spare Parts Item - 45
358Recommended Spare Parts Item - 46
359Recommended Spare Parts Item - 47
360Recommended Spare Parts Item - 48
361Recommended Spare Parts Item - 49
362Recommended Spare Parts Item - 50
363Recommended Spare Parts Item - 51
364Recommended Spare Parts Item - 52
365Recommended Spare Parts Item - 53
366Recommended Spare Parts Item - 54
367Recommended Spare Parts Item - 55
368Recommended Spare Parts Item - 56
369Recommended Spare Parts Item - 57
370Recommended Spare Parts Item - 58
371Recommended Spare Parts Item - 59
372Recommended Spare Parts Item - 60
373Recommended Spare Parts Item - 61
374Recommended Spare Parts Item - 62
375Recommended Spare Parts Item - 63
376Recommended Spare Parts Item - 64
377Recommended Spare Parts Item - 65
378Recommended Spare Parts Item - 66
379Recommended Spare Parts Item - 67
380Recommended Spare Parts Item - 68
381Recommended Spare Parts Item - 69
382Recommended Spare Parts Item - 70
383Recommended Spare Parts Item - 71
384Recommended Spare Parts Item - 72
385Recommended Spare Parts Item - 73
386Recommended Spare Parts Item - 74
387Recommended Spare Parts Item - 75
388Recommended Spare Parts Item - 76
389Recommended Spare Parts Item - 77
390Recommended Spare Parts Item - 78
391Recommended Spare Parts Item - 79
392Recommended Spare Parts Item - 80
393Recommended Spare Parts Item - 81
394Recommended Spare Parts Item - 82
395Recommended Spare Parts Item - 83
396Recommended Spare Parts Item - 84
397Recommended Spare Parts Item - 85
398Recommended Spare Parts Item - 86
399Recommended Spare Parts Item - 87
400Recommended Spare Parts Item - 88
401Recommended Spare Parts Item - 89
402Recommended Spare Parts Item - 90
403Recommended Spare Parts Item - 91
404Recommended Spare Parts Item - 92
405Recommended Spare Parts Item - 93
406Recommended Spare Parts Item - 94
407Recommended Spare Parts Item - 95
408Recommended Spare Parts Item - 96
409Recommended Spare Parts Item - 97
410Recommended Spare Parts Item - 98
411Recommended Spare Parts Item - 99
412Recommended Spare Parts Item - 100 Please Enable Macros to View BoQ information
413List of \\"Deviations with Cost of Withdrawal\\"
414Deviation No. - 1
415Deviation No. - 2
416Deviation No. - 3
417Deviation No. - 4
418Deviation No. - 5
419Deviation No. - 6
420Deviation No. - 7
421Deviation No. - 8
422Deviation No. - 9
423Deviation No. - 10
424Deviation No. - 11
425Deviation No. - 12
426Deviation No. - 13
427Deviation No. - 14
428Deviation No. - 15
429Deviation No. - 16
430Deviation No. - 17
431Deviation No. - 18
432Deviation No. - 19
433Deviation No. - 20
434Deviation No. - 21
435Deviation No. - 22
436Deviation No. - 23
437Deviation No. - 24
438Deviation No. - 25
439Deviation No. - 26
440Deviation No. - 27
441Deviation No. - 28
442Deviation No. - 29
443Deviation No. - 30
444Deviation No. - 31
445Deviation No. - 32
446Deviation No. - 33
447Deviation No. - 34
448Deviation No. - 35
449Deviation No. - 36
450Deviation No. - 37
451Deviation No. - 38
452Deviation No. - 39
453Deviation No. - 40
454Deviation No. - 41
455Deviation No. - 42
456Deviation No. - 43
457Deviation No. - 44
458Deviation No. - 45
459Deviation No. - 46
460Deviation No. - 47
461Deviation No. - 48
462Deviation No. - 49
463Deviation No. - 50
464Deviation No. - 51
465Deviation No. - 52
466Deviation No. - 53
467Deviation No. - 54
468Deviation No. - 55
469Deviation No. - 56
470Deviation No. - 57
471Deviation No. - 58
472Deviation No. - 59
473Deviation No. - 60
474Deviation No. - 61
475Deviation No. - 62
476Deviation No. - 63
477Deviation No. - 64
478Deviation No. - 65
479Deviation No. - 66
480Deviation No. - 67
481Deviation No. - 68
482Deviation No. - 69
483Deviation No. - 70
484Deviation No. - 71
485Deviation No. - 72
486Deviation No. - 73
487Deviation No. - 74
488Deviation No. - 75
489Deviation No. - 76
490Deviation No. - 77
491Deviation No. - 78
492Deviation No. - 79
493Deviation No. - 80
494Deviation No. - 81
495Deviation No. - 82
496Deviation No. - 83
497Deviation No. - 84
498Deviation No. - 85
499Deviation No. - 86
500Deviation No. - 87
501Deviation No. - 88
502Deviation No. - 89
503Deviation No. - 90
504Deviation No. - 91
505Deviation No. - 92
506Deviation No. - 93
507Deviation No. - 94
508Deviation No. - 95
509Deviation No. - 96
510Deviation No. - 97
511Deviation No. - 98
512Deviation No. - 99
513Deviation No. - 100

AI Tender Summary

OUR REF NO 56227033
AUTHORITY Government Departments
TENDER VALUE 110.57 Crore
LAST DATE 05-08-2026
Authority
Authority Name Uttranchal Jal Vidyut Nigam Ltd
Work Description Tender for Renovation, Modernization And Upgradation Of Kulhal Hydroelectric Project On Turn Key Basis
Basic Detail
Tender No 1 DGM MU YV 2026 27
Bidding Type Tender
Location
City Dehradun
State Uttarakhand
Key Dates
Publish Date 30 Jun 2026
Submission Date 05 Aug 2026
Open Date 10 Aug 2026
Finance
Tender Value 110.57 Crore
Tender Fee 1.18 Lakhs
EMD 2.22 Crore
Exemption Not Available
Document List
78cd5e21-63eb-4696-8e7e-af682bbf4c55.html
BOQ_114655.xls
KulhalRMUBiddoc.pdf
Tendernotice_1 (11).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 05, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 34 days
Aug 10, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 39 days

Tender Documents

Download All (ZIP) ↓
html

78cd5e21-63eb-4696-8e7e-af682bbf4c55.html

xls

BOQ_114655.xls

pdf

KulhalRMUBiddoc.pdf

pdf

Tendernotice_1 (11).pdf

TenderDetail
Loading tenders