Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 6 days TDR #56226856

Tender For Design, Manufacturing, Procurement Of Materials, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Cast Ggc Valves Including Documentation, All Pre-Commissioning, Commissioning/Start Up Spares (As Applicable), Freight

Issued by Boards / Undertakings / PSU · Vadodara, Gujarat
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 Jul 2026
6 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Vadodara → Gujarat
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Design, Manufacturing, Procurement Of Materials, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Cast Ggc Valves Including Documentation, All Pre-Commissioning, Commissioning/Start Up Spares (As Applicable), Freight Up To Site As Per The Enclosed Tender Standard Specifications, Job Specification Etc. And Other Codes And Standards Attached Or Referred As Per Material Requisition For Petrochemical And Lube Integration Project Lupech (J-18) At Iocl Gujarat Refinery, India. = Limited

BOQ

Name of Work:- Design, Manufacturing, Procurement of materials, testing at manufacturers works, inspection by TPIA, packing, supply of CAST GGC VALVES including Documentation, all pre-commissioning, commissioning/Start up spares (as applicable), Freight up to site as per the enclosed Tender standard specifications, Job specification etc. and other codes and standards attached or referred as per Material Requisition for Petrochemical and Lube Integration Project LuPech (J-18) at IOCL Gujarat Refinery, India.
Sl. No. Item Description
12 IN Dual Plate Check Valve Flanged Ends, -, API 594, ASTM B62 UNS C83600, 150 Lbs, Installation: Horizontal or Vertical, FF, Ends as per ASME B16.5, -, -, -, -, -, -, -, -, Seats: -, Bronze, -, -, -, -, Retainerless, -,
218 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A216 Gr.WCB, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 8, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, GO, -, -, -, -, -, Category ‘‘D’’ service, Refer to Axens specification IN-042.0 for additional requirements
312 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A351 Gr.CF8M + Sour Service, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7M/A194 Gr.2HM, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, GO, -, -, -, -, -, -,
410 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A216 Gr.WCB, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 8, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Hydrocarbon Service, Full vacuum service, Refer to Axens specification IN-042.0 for additional requirements
58 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A351 Gr.CF8, 300 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Hydrocarbon Service
64 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A351 Gr.CF8, 300 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Hydrocarbon Service
72 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A216 Gr.WCB, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 8, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Full vacuum service,Hydrocarbon Service
86 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A216 Gr.WCB, 300 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Full vacuum service,Hydrocarbon Service
910 IN Globe Valve Flanged Ends, -, API 623, Seat Leakage as per API 598, ASTM A351 Gr.CF8, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Swivel Plug Disc, -, Stem: OS & Y/RSRO, -, HO, -, -, -, -, -, Full vacuum service,Hydrocarbon Service
1012 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A351 Gr.CF8, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, GO, -, -, -, -, -, Full vacuum service,Hydrocarbon Service
118 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A351 Gr.CF8, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Full vacuum service,Hydrocarbon Service
124 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A351 Gr.CF8, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Full vacuum service,Hydrocarbon Service
133 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A351 Gr.CF8, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Full vacuum service,Hydrocarbon Service
142 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A351 Gr.CF8, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 12, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Full vacuum service,Hydrocarbon Service
1512 IN Dual Plate Check Valve Flanged Ends, -, API 594, ASTM A216 Gr.WCB, 150 Lbs, Installation: Horizontal or Vertical, RF, Ends as per ASME B16.5, -, -, -, -, -, -, Spring: UNS N07750, Integral Seats, Seats: -, API Trim No 8, -, -, -, -, -, -,
168 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A216 Gr.WCB, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 8, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, -,
174 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A216 Gr.WCB, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 8, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, -,
1812 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A216 Gr.WCB, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 8, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, GO, -, -, -, -, -, -,
198 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A216 Gr.WCB, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 8, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, Category ‘‘D’’ service
202 IN Swing Check Valve Flanged Ends, -, API 594, ASTM A216 Gr.WCB + PWHT + Sour Service + HIC test, 150 Lbs, Installation: Horizontal or Vertical, RF, Ends as per ASME B16.5, -, Bolted Cover, A193 Gr.B7M/A194 Gr.2HM, -, SPW AISI 316/Graphite, -, Renewable Seats, Seats: -, API Trim No 12, -, -, -, -, -, Full vacuum service, C.A. = 6 mm
216 IN Swing Check Valve Flanged Ends, -, API 594, ASTM A216 Gr.WCB, 300 Lbs, Installation: Horizontal or Vertical, RF, Ends as per ASME B16.5, -, Bolted Cover, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, -, Renewable Seats, Seats: -, API Trim No 12, -, -, -, -, -, -,
228 IN Dual Plate Check Valve Flanged Ends, -, API 594, ASTM A351 Gr.CF8, 150 Lbs, Installation: Horizontal or Vertical, RF, Ends as per ASME B16.5, -, -, -, -, -, -, Spring: UNS N07750, Integral Seats, Seats: -, API Trim No 12, -, -, -, -, -, Full vacuum service
2312 IN Dual Plate Check Valve Flanged Ends, -, API 594, ASTM A351 Gr.CF8, 150 Lbs, Installation: Horizontal or Vertical, RF, Ends as per ASME B16.5, -, -, -, -, -, -, Spring: UNS N07750, Integral Seats, Seats: -, API Trim No 12, -, -, -, -, -, Full vacuum service
246 IN Gate Valve Flanged Ends, -, API 600, Seat Leakage as per API 598, ASTM A216 Gr.WCB, 150 Lbs, RF, Ends as per ASME B16.5, -, Bolted Bonnet, A193 Gr.B7/A194 Gr.2H, -, SPW AISI 316/Graphite, Packing: Graphite, -, API Trim No 8, Renewable Seats, Seats: -, Flexible Wedge, -, Stem: OS & Y/RSNRO, -, HO, -, -, -, -, -, IBR+Full vacuum service
252 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.1
26Spare no. - 1 (Mention the spare name- Qty- Unit)
27Spare no. - 2 (Mention the spare name- Qty- Unit)
28Spare no. - 3 (Mention the spare name- Qty- Unit)
29Spare no. - 4 (Mention the spare name- Qty- Unit)
30Spare no. - 5 (Mention the spare name- Qty- Unit)
312 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.2
32Spare no. - 1 (Mention the spare name- Qty- Unit)
33Spare no. - 2 (Mention the spare name- Qty- Unit)
34Spare no. - 3 (Mention the spare name- Qty- Unit)
35Spare no. - 4 (Mention the spare name- Qty- Unit)
36Spare no. - 5 (Mention the spare name- Qty- Unit)
372 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.3
38Spare no. - 1 (Mention the spare name- Qty- Unit)
39Spare no. - 2 (Mention the spare name- Qty- Unit)
40Spare no. - 3 (Mention the spare name- Qty- Unit)
41Spare no. - 4 (Mention the spare name- Qty- Unit)
42Spare no. - 5 (Mention the spare name- Qty- Unit)
432 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.4
44Spare no. - 1 (Mention the spare name- Qty- Unit)
45Spare no. - 2 (Mention the spare name- Qty- Unit)
46Spare no. - 3 (Mention the spare name- Qty- Unit)
47Spare no. - 4 (Mention the spare name- Qty- Unit)
48Spare no. - 5 (Mention the spare name- Qty- Unit)
492 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.5
50Spare no. - 1 (Mention the spare name- Qty- Unit)
51Spare no. - 2 (Mention the spare name- Qty- Unit)
52Spare no. - 3 (Mention the spare name- Qty- Unit)
53Spare no. - 4 (Mention the spare name- Qty- Unit)
54Spare no. - 5 (Mention the spare name- Qty- Unit)
552 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.6
56Spare no. - 1 (Mention the spare name- Qty- Unit)
57Spare no. - 2 (Mention the spare name- Qty- Unit)
58Spare no. - 3 (Mention the spare name- Qty- Unit)
59Spare no. - 4 (Mention the spare name- Qty- Unit)
60Spare no. - 5 (Mention the spare name- Qty- Unit)
612 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.7
62Spare no. - 1 (Mention the spare name- Qty- Unit)
63Spare no. - 2 (Mention the spare name- Qty- Unit)
64Spare no. - 3 (Mention the spare name- Qty- Unit)
65Spare no. - 4 (Mention the spare name- Qty- Unit)
66Spare no. - 5 (Mention the spare name- Qty- Unit)
672 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.8
68Spare no. - 1 (Mention the spare name- Qty- Unit)
69Spare no. - 2 (Mention the spare name- Qty- Unit)
70Spare no. - 3 (Mention the spare name- Qty- Unit)
71Spare no. - 4 (Mention the spare name- Qty- Unit)
72Spare no. - 5 (Mention the spare name- Qty- Unit)
732 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.9
74Spare no. - 1 (Mention the spare name- Qty- Unit)
75Spare no. - 2 (Mention the spare name- Qty- Unit)
76Spare no. - 3 (Mention the spare name- Qty- Unit)
77Spare no. - 4 (Mention the spare name- Qty- Unit)
78Spare no. - 5 (Mention the spare name- Qty- Unit)
792 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.10
80Spare no. - 1 (Mention the spare name- Qty- Unit)
81Spare no. - 2 (Mention the spare name- Qty- Unit)
82Spare no. - 3 (Mention the spare name- Qty- Unit)
83Spare no. - 4 (Mention the spare name- Qty- Unit)
84Spare no. - 5 (Mention the spare name- Qty- Unit)
852 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.11
86Spare no. - 1 (Mention the spare name- Qty- Unit)
87Spare no. - 2 (Mention the spare name- Qty- Unit)
88Spare no. - 3 (Mention the spare name- Qty- Unit)
89Spare no. - 4 (Mention the spare name- Qty- Unit)
90Spare no. - 5 (Mention the spare name- Qty- Unit)
912 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.12
92Spare no. - 1 (Mention the spare name- Qty- Unit)
93Spare no. - 2 (Mention the spare name- Qty- Unit)
94Spare no. - 3 (Mention the spare name- Qty- Unit)
95Spare no. - 4 (Mention the spare name- Qty- Unit)
96Spare no. - 5 (Mention the spare name- Qty- Unit)
972 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.13
98Spare no. - 1 (Mention the spare name- Qty- Unit)
99Spare no. - 2 (Mention the spare name- Qty- Unit)
100Spare no. - 3 (Mention the spare name- Qty- Unit)
101Spare no. - 4 (Mention the spare name- Qty- Unit)
102Spare no. - 5 (Mention the spare name- Qty- Unit)
1032 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.14
104Spare no. - 1 (Mention the spare name- Qty- Unit)
105Spare no. - 2 (Mention the spare name- Qty- Unit)
106Spare no. - 3 (Mention the spare name- Qty- Unit)
107Spare no. - 4 (Mention the spare name- Qty- Unit)
108Spare no. - 5 (Mention the spare name- Qty- Unit)
1092 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.15
110Spare no. - 1 (Mention the spare name- Qty- Unit)
111Spare no. - 2 (Mention the spare name- Qty- Unit)
112Spare no. - 3 (Mention the spare name- Qty- Unit)
113Spare no. - 4 (Mention the spare name- Qty- Unit)
114Spare no. - 5 (Mention the spare name- Qty- Unit)
1152 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.16
116Spare no. - 1 (Mention the spare name- Qty- Unit)
117Spare no. - 2 (Mention the spare name- Qty- Unit)
118Spare no. - 3 (Mention the spare name- Qty- Unit)
119Spare no. - 4 (Mention the spare name- Qty- Unit)
120Spare no. - 5 (Mention the spare name- Qty- Unit)
1212 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.17
122Spare no. - 1 (Mention the spare name- Qty- Unit)
123Spare no. - 2 (Mention the spare name- Qty- Unit)
124Spare no. - 3 (Mention the spare name- Qty- Unit)
125Spare no. - 4 (Mention the spare name- Qty- Unit)
126Spare no. - 5 (Mention the spare name- Qty- Unit)
1272 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.18
128Spare no. - 1 (Mention the spare name- Qty- Unit)
129Spare no. - 2 (Mention the spare name- Qty- Unit)
130Spare no. - 3 (Mention the spare name- Qty- Unit)
131Spare no. - 4 (Mention the spare name- Qty- Unit)
132Spare no. - 5 (Mention the spare name- Qty- Unit)
1332 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.19
134Spare no. - 1 (Mention the spare name- Qty- Unit)
135Spare no. - 2 (Mention the spare name- Qty- Unit)
136Spare no. - 3 (Mention the spare name- Qty- Unit)
137Spare no. - 4 (Mention the spare name- Qty- Unit)
138Spare no. - 5 (Mention the spare name- Qty- Unit)
1392 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.20
140Spare no. - 1 (Mention the spare name- Qty- Unit)
141Spare no. - 2 (Mention the spare name- Qty- Unit)
142Spare no. - 3 (Mention the spare name- Qty- Unit)
143Spare no. - 4 (Mention the spare name- Qty- Unit)
144Spare no. - 5 (Mention the spare name- Qty- Unit)
1452 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.21
146Spare no. - 1 (Mention the spare name- Qty- Unit)
147Spare no. - 2 (Mention the spare name- Qty- Unit)
148Spare no. - 3 (Mention the spare name- Qty- Unit)
149Spare no. - 4 (Mention the spare name- Qty- Unit)
150Spare no. - 5 (Mention the spare name- Qty- Unit)
1512 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.22
152Spare no. - 1 (Mention the spare name- Qty- Unit)
153Spare no. - 2 (Mention the spare name- Qty- Unit)
154Spare no. - 3 (Mention the spare name- Qty- Unit)
155Spare no. - 4 (Mention the spare name- Qty- Unit)
156Spare no. - 5 (Mention the spare name- Qty- Unit)
1572 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.23
158Spare no. - 1 (Mention the spare name- Qty- Unit)
159Spare no. - 2 (Mention the spare name- Qty- Unit)
160Spare no. - 3 (Mention the spare name- Qty- Unit)
161Spare no. - 4 (Mention the spare name- Qty- Unit)
162Spare no. - 5 (Mention the spare name- Qty- Unit)
1632 years Normal operational & maintenance spares (as per vendor recommendation) for Item BOQ Sl.No.24
164Spare no. - 1 (Mention the spare name- Qty- Unit)
165Spare no. - 2 (Mention the spare name- Qty- Unit)
166Spare no. - 3 (Mention the spare name- Qty- Unit)
167Spare no. - 4 (Mention the spare name- Qty- Unit)
168Spare no. - 5 (Mention the spare name- Qty- Unit) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56226856
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 15-07-2026
Authority
Authority Name Indian Oil Corporation Limited
Work Description Tender for Design, Manufacturing, Procurement Of Materials, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Cast Ggc Valves Including Documentation, All Pre-Commissioning, Commissioning/Start Up Spares (As Applicable), Freight Up To Site As Per The Enclosed Tender Standard Specifications, Job Specification Etc. And Other Codes And Standards Attached Or Referred As Per Material Requisition For Petrochemical And Lube Integration Project Lupech (J-18) At Iocl Gujarat Refinery, India. = Limited
Basic Detail
Tender No TP/077154C001/000/1310-701/435
Bidding Type Tender
Location
City Vadodara
State Gujarat
Key Dates
Publish Date 30 Jun 2026
Submission Date 15 Jul 2026
Open Date 16 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
077154C-000-MR-1310-701_A_1.pdf
98370dc4-f6ad-42a7-bd54-c825097edd3b.html
Bidders_help_Document_for_1.pdf
BOQ_200697.xls
FAQs-IOCL-Online-EMD.pdf
GPC.pdf
GuidelinesonPersonalProte_2.pdf
ITB.pdf
SPC.pdf
Special_Instructions_to_t_3.pdf
Tender-Acceptance-Format.pdf
Tendernotice_1 (11).pdf
Unpriced_Bid_Documents.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 15, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Jul 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
pdf

077154C-000-MR-1310-701_A_1.pdf

html

98370dc4-f6ad-42a7-bd54-c825097edd3b.html

pdf

Bidders_help_Document_for_1.pdf

xls

BOQ_200697.xls

pdf

FAQs-IOCL-Online-EMD.pdf

pdf

GPC.pdf

pdf

GuidelinesonPersonalProte_2.pdf

pdf

ITB.pdf

pdf

SPC.pdf

pdf

Special_Instructions_to_t_3.pdf

pdf

Tender-Acceptance-Format.pdf

pdf

Tendernotice_1 (11).pdf

xls

Unpriced_Bid_Documents.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders