Tender For Supply, Installation And Configuration Of Gateway At 132 Kv Gis Hanuman Setu, 132 Kv Gis Mehtab Bagh And 132 Kv S/S Mohaan Road For Telemetry Data Transmission On Ice104 Protocol To Sldc, Lucknow And Backup Sldc Modipuram Under Etd - I, Lu
Tender Overview
Project Description
Tender for Supply, Installation And Configuration Of Gateway At 132 Kv Gis Hanuman Setu, 132 Kv Gis Mehtab Bagh And 132 Kv S/S Mohaan Road For Telemetry Data Transmission On Ice104 Protocol To Sldc, Lucknow And Backup Sldc Modipuram Under Etd - I, Lucknow
BOQ
| Sl. No. | Item Description |
| 1 | Scope: Supply , installation and configuration of Gateway for telementary data over IEC104 protocal to SLDC Lucknow and Modipuram at 132kV GIS s/s HanumanSetu under ETD-I, Lucknow. |
| 2 | Providing & Installation of New Gateway at 132 KV S/S Hanuman Setu Lucknow with following specification as follows -(1) Multiple-Master Communication capability.(2) Support IEC60870-5-101/103/104, DNP3serial/TCP MODBUS RTU/ASCII/TCP,IEC62056-DLMS, IEC61850, SNMP, SNTP,MQTT(3) Data Point Support:-5000(4) Port Connectors: 4 Serial (RS232/485) and 2 Ethernet(5) Power Supply (AC-DC) 85-265VAC 50-60HZ or 100-370VDC(6) Reliability: IEC61850-3 complitant hardware, (7) Time Sync based on NTP/SNTP/NEMA/Protoco specific Synchronization (IEC104/DNP3.0etc)Suitable for Existing SEL Make SCADA System as Installed at 132 KV S/S Hanuman Setu work Included as Installation & all Software configuration and its testing if required as per site condition and all other associated work to complete the job satisfactory. Except BCU/ relay configuration, Supply of any other material mentioned above like fibre Cables/splicing and field wiring termination etc, |
| 3 | Following work to be carried out for Lucknow SLDC -Work Included:-(a)Complete checking of SAS gateway panel included architecture and settings.(b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Lucknow(c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Lucknow |
| 4 | Following work to be carried out for Modipuram ALDS -Work Included:-(a)Complete checking of SAS gateway panel included architecture and settings.(b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Modipuram.(c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Modipuram. |
| 5 | IEC61850 based BCPUs. ICD/.CID file configuration of SEL make relays for 132kV & 33kV Feeders. i). 132kV Feeders-5Nos ii). 33kV Feeders-14Nos |
| 6 | Scope: Supply , installation and configuration of Gateway for telementary data over IEC104 protocal to SLDC Lucknow and Modipuram at 132kV S/s Mehtabag under ETD-I, Lucknow. |
| 7 | Providing & Installation of New Gateway at 132 KV S/S Mehtabag Lucknow with following specification as follows -(1) Multiple-Master Communication capability.(2) Support IEC60870-5-101/103/104, DNP3serial/TCP MODBUS RTU/ASCII/TCP,IEC62056-DLMS, IEC61850, SNMP, SNTP,MQTT(3) Data Point Support:-5000(4) Port Connectors: 4 Serial (RS232/485) and 2 Ethernet(5) Power Supply (AC-DC) 85-265VAC 50-60HZ or 100-370VDC(6) Reliability: IEC61850-3 complitant hardware, (7) Time Sync based on NTP/SNTP/NEMA/Protoco specific Synchronization (IEC104/DNP3.0etc)Suitable for Existing Siemens Make SCADA System as Installed at 132 KV S/S Mehtabhag work Included as Installation & all Software configuration and its testing if required as per site condition and all other associated work to complete the job satisfactory. Except BCU/ relay configuration, Supply of any other material mentioned above like fibre Cables/splicing and field wiring termination etc, |
| 8 | Following work to be carried out for Lucknow SLDC -Work Included:-(a)Complete checking of SAS gateway panel included architecture and settings.(b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Lucknow(c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Lucknow |
| 9 | Following work to be carried out for Modipuram ALDS -Work Included:-(a)Complete checking of SAS gateway panel included architecture and settings.(b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Modipuram.(c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Modipuram. |
| 10 | IEC61850 based BCPUs. ICD/.CID file configuration of Siemens make relays for 132kV & 33kV Feeders. i). 132kV Feeders-8Nos ii). 33kV Feeders-24Nos |
| 11 | Scope: Supply , installation and configuration of Gateway for telementary data over IEC104 protocal to SLDC Lucknow and Modipuram at 132kV S/s Mohan Road under ETD-I, Lucknow. |
| 12 | Providing & Installation of New Gateway at 132 KV S/S Mohan Road Lucknow with following specification as follows -(1) Multiple-Master Communication capabililty(2) Support IEC60870-5-101/103/104, DNP3serial/TCP MODBUS RTU/ASCII/TCP,IEC62056-DLMS, IEC61850, SNMP, SNTP,MQTT(3) Data Point Support:-5000(4) Port Connectors: 4 Serial (RS232/485) and 2 Ethernet(5) Power Supply (AC-DC) 85-265VAC 50-60HZ or 100-370VDC(6) Reliability: IEC61850-3 complitant hardware, (7) Time Sync based on NTP/SNTP/NEMA/Protoco specific Synchronization (IEC104/DNP3.0etc)Suitable for Existing Siemens Make SCADA System as Installed at 132 KV S/S Mohan Road work Included as Installation & all Software configuration and its testing if required as per site condition and all other associated work to complete the job satisfactory. Except BCU/ relay configuration, Supply of any other material mentioned above like fibre Cables/splicing and field wiring termination etc, |
| 13 | Following work to be carried out for Lucknow SLDC -Work Included:-(a)Complete checking of SAS gateway panel included architecture and settings.(b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Lucknow(c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Lucknow |
| 14 | Following work to be carried out for Modipuram ALDS -Work Included:-(a)Complete checking of SAS gateway panel included architecture and settings.(b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Modipuram.(c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Modipuram. |
| 15 | IEC61850 based BCPUs. ICD/.CID file configuration of Siemens make relays for 132kV & 33kV Feeders. i). 132kV Feeders-6Nos ii). 33kV Feeders-12Nos Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
TodayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender