Power Government Departments Closing in 6 days TDR #56215044

Bids Are invited for Custom Bid For Services - 33 Kv Line Strengthening Work And Lt Line Strengthening Work And Other Lt Line Associated Work On Semi-Turnkey Basis In Business Plan 2026-27 Under The Area Of Edd, Kiraoli And Kheragarh Agra - Part-A (S

Issued by Government Departments · Agra, Uttar Pradesh
Tender Value
6.44 Lakhs
Estimated cost
Bid Submission
14 Jul 2026
6 days left
EMD
6500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bids Are invited for Custom Bid For Services - 33 Kv Line Strengthening Work And Lt Line Strengthening Work And Other Lt Line Associated Work On Semi-Turnkey Basis In Business Plan 2026-27 Under The Area Of Edd, Kiraoli And Kheragarh Agra - Part-A (Supply Of Material)Suspension Cl With I Hook , I Hook , J Hook , Dead End Cl With I Hook , Cl For Lt Distribution Box , Piercing Connector , Lt Pole Cl With Nut & Bolt For Pcc Pole , Earth Wire Cl For Pcc Pole , Pg Cl , V Type Cross Arm Cl For 33 Kv , F-Bracket For 33 Kv , Alu. Paint , Red Oxide Paint , Top Channel For 33 Kv , Holding Cl , Brassing Set , Cl For Fixing Of Cable And Cable Box , Part-B (Erection Work)Carriage Of Pcc Pole 8.5 Mtr. Long From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of St Pole 11 Mtr Long From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) , Cartiage Of Line Material From Store Center Agra To Work Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) Line Material Viz. Lt Distribution Box (48), Stone Pad (96), Stay Set (13), Earthing Complete (23), V Type Cross Arm For 33 Kv (15), Polymer Pin Insulator For 33 Kv (51), Dropper Channel (2), Disc Fitting For 33 Kv (12), Disc Insulator For 33 Kv (12), Jointing Kit O/D 3X300 Sqmm (2) Etc And Other Line Material As Required In Estimate/Package) , Cartiage Of Lt Abc Cable 3X50 Sqmm (320 Mtr.), Lt Abc Cable 3X95 Sqmm (2750 Mtr.), Lt Abc Cable 3X120 Sqmm (440 Mtr.), Alu. Cable 1X16 Sqmm (40 Mtr.), 33 Kv Cable 3X300 Sqmm (100 Mtr.) From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50Kms.) , Erection And Grouting Of Pcc 8.5 Mtr. Long Single Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of St Pole 11 Mtr. Long Single Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of St Pole 11 Mtr. Long (Double Pole) In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Digging & Laying Of 33 Kv Cable 3X300 Sqmm Then Laying Earth And Its Levelling And Rammuring Etc. Complete Work As Respo Norms As Per Respo Norms And Direction By Superivising Engineer. , Laying Of 11 Kv Xlpe Cable 3X300 Sqmm Overhead With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Abc Cable 3X50 Sqmm/3X95/3X120 Overhead With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Alu. Cable 1X16 Sqmm Overhead With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Filling Of 33 Kv Cable Jointing Kit 3X300 Sqmm O/D And Making Connection As Per Respo Norms & Direction By Supervising Engineer. , Erection And Grouting Of Stay Set As Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Erection Of Earthing Complete As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Concreting Of Support Pcc/St Pole. Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Concreting Of Support Of Stay Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Concreting Of Led 1X16 Sqmm Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Fixing Of Dropper Channel With Cl As Per Resop Norms And Direction By Supervising Engineer. , Fixing Of Top Channel For 33 Kv As Per Resop Norms And Direction By Supervising Engineer. , Fixing Of F-Bracket For 33 Kv As Required On Poles As Per Respo Norms And Direction By Supervising Engineer. , Installation Of Lt Distribution Box With Cl S As Per Respo Norms And Direction By Supervising Engineer. , Fixing Of P.G. Cl S As Per Respo Norms , Fixing Of V Type Cross Arm Cl For 33 Kv As Per Respo Norms , Fixing Of Polymer Pin Insulator For 33 Kv As Per Respo Norms , Fixing Of Suspension Cl With I Hook As Per Respo Norms , Fixing Of I Hook As Per Respo Norms , Fixing Of J Hook As Per Respo Norms , Fixing Of Cl For Cable Box , Fixing Of Disc Fitting For 33 Kv , Fixing Of Brassing Set , Fixing Of Piercing Connector As Per Respo Norms , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Single Coat Of Red Oxide Paint As Per Respo Norms And Direction By Supervising Engineer. , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Double Coat Of Alu. Paint As Per Respo Norms And Direction By Supervising Engineer. , Removal Of Old & Used Lt Cable 3X50 Sqmm/1X16 Sqmm And Receive Back To Store Center Agra From Work Site Along With Loading Unloading Both Ends (Approx 50 To 70 Km.). , Removal Of Old & Used Weasel Conductor And Receive Back To Store Center Agra From Work Site Along With Loading Unloading Both Ends (Approx 50 To 70 Km.).

BOQ

Sl. No. Item TitleItem Description
1Part-A (Supply of Material)Suspension Clamp with I HookPart-A (Supply of Material)Suspension Clamp with I Hook
2I HookI Hook
3J HookJ Hook
4Dead End Clamp with I HookDead End Clamp with I Hook
5Clamp for LT Distribution BoxClamp for LT Distribution Box
6Piercing ConnectorPiercing Connector
7LT Pole Clamp with Nut & Bolt for PCC PoleLT Pole Clamp with Nut & Bolt for PCC Pole
8Earth Wire Clamp for PCC PoleEarth Wire Clamp for PCC Pole
9PG ClampPG Clamp
10V Type Cross Arm Clamp for 33 KVV Type Cross Arm Clamp for 33 KV
11F-Bracket for 33 KVF-Bracket for 33 KV
12Alu. PaintAlu. Paint
13Red Oxide PaintRed Oxide Paint
14Top Channel for 33 KVTop Channel for 33 KV
15Holding ClampHolding Clamp
16Brassing SetBrassing Set
17Clamp for Fixing of Cable and Cable BoxClamp for Fixing of Cable and Cable Box
18Part-B (Erection work)Carriage of PCC Pole 8.5 Mtr. Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Part-B (Erection work)Carriage of PCC Pole 8.5 Mtr. Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
19Carriage of ST Pole 11 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)Carriage of ST Pole 11 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
20Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. LT Distribution Box (48), Stone Pad (96), Stay Set (13), Earthing Complete (23), V Type Cross Arm for 33 KV (15), Polymer Pin Insulator for 33 KV (51), Dropper Channel (2), Disc fitting for 33 KV (12), Disc Insulator for 33 KV (12), Jointing Kit O/D 3x300 sqmm (2) etc and other line Material as required in Estimate/Package)Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. LT Distribution Box (48), Stone Pad (96), Stay Set (13), Earthing Complete (23), V Type Cross Arm for 33 KV (15), Polymer Pin Insulator for 33 KV (51), Dropper Channel (2), Disc fitting for 33 KV (12), Disc Insulator for 33 KV (12), Jointing Kit O/D 3x300 sqmm (2) etc and other line Material as required in Estimate/Package)
21Cartiage of LT ABC Cable 3x50 sqmm (320 Mtr.), LT ABC Cable 3x95 sqmm (2750 Mtr.), LT ABC Cable 3x120 sqmm (440 Mtr.), Alu. Cable 1x16 sqmm (40 Mtr.), 33 KV Cable 3x300 sqmm (100 Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)Cartiage of LT ABC Cable 3x50 sqmm (320 Mtr.), LT ABC Cable 3x95 sqmm (2750 Mtr.), LT ABC Cable 3x120 sqmm (440 Mtr.), Alu. Cable 1x16 sqmm (40 Mtr.), 33 KV Cable 3x300 sqmm (100 Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
22Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
23Erection and grouting of ST Pole 11 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of ST Pole 11 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
24Erection and grouting of ST Pole 11 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of ST Pole 11 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
25Digging & Laying of 33 KV Cable 3x300 sqmm then laying earth and its levelling and rammuring etc. complete work as RESPO norms as per RESPO Norms and direction by superivising Engineer.Digging & Laying of 33 KV Cable 3x300 sqmm then laying earth and its levelling and rammuring etc. complete work as RESPO norms as per RESPO Norms and direction by superivising Engineer.
26Laying of 11 KV XLPE cable 3x300 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.Laying of 11 KV XLPE cable 3x300 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.
27Laying of LT ABC cable 3x50 sqmm/3x95/3x120 overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.Laying of LT ABC cable 3x50 sqmm/3x95/3x120 overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.
28Laying of Alu. cable 1x16 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.Laying of Alu. cable 1x16 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.
29Filling of 33 KV Cable Jointing Kit 3x300 sqmm O/D and making connection as per respo norms & direction by supervising engineer.Filling of 33 KV Cable Jointing Kit 3x300 sqmm O/D and making connection as per respo norms & direction by supervising engineer.
30Erection and grouting of stay set as ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.Erection and grouting of stay set as ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
31Erection of Earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Erection of Earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
32Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work.Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work.
33Concreting of Support of Stay including the cost of arrangement of labour & required material T&P etc for proper completion of work.Concreting of Support of Stay including the cost of arrangement of labour & required material T&P etc for proper completion of work.
34Concreting of Led 1x16 sqmm including the cost of arrangement of labour & required material T&P etc for proper completion of work.Concreting of Led 1x16 sqmm including the cost of arrangement of labour & required material T&P etc for proper completion of work.
35Fixing of Dropper channel with clamp as per resop norms and direction by supervising engineer.Fixing of Dropper channel with clamp as per resop norms and direction by supervising engineer.
36Fixing of Top channel for 33 KV as per resop norms and direction by supervising engineer.Fixing of Top channel for 33 KV as per resop norms and direction by supervising engineer.
37Fixing of F-Bracket for 33 KV as required on Poles as per RESPO norms and direction by supervising Engineer.Fixing of F-Bracket for 33 KV as required on Poles as per RESPO norms and direction by supervising Engineer.
38Installation of LT Distribution Box with clamps as per RESPO norms and direction by supervising Engineer.Installation of LT Distribution Box with clamps as per RESPO norms and direction by supervising Engineer.
39Fixing of P.G. Clamps as per RESPO normsFixing of P.G. Clamps as per RESPO norms
40Fixing of V Type Cross Arm Clamp for 33 KV as per RESPO normsFixing of V Type Cross Arm Clamp for 33 KV as per RESPO norms
41Fixing of Polymer Pin Insulator for 33 KV as per RESPO normsFixing of Polymer Pin Insulator for 33 KV as per RESPO norms
42Fixing of Suspension clamp with I hook as per RESPO normsFixing of Suspension clamp with I hook as per RESPO norms
43Fixing of I hook as per RESPO normsFixing of I hook as per RESPO norms
44Fixing of J hook as per RESPO normsFixing of J hook as per RESPO norms
45Fixing of Clamp for cable BoxFixing of Clamp for cable Box
46Fixing of Disc Fitting for 33 KVFixing of Disc Fitting for 33 KV
47Fixing of Brassing SetFixing of Brassing Set
48Fixing of Piercing Connector as per RESPO normsFixing of Piercing Connector as per RESPO norms
49Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer.Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer.
50Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer.Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer.
51Removal of old & Used LT Cable 3x50 sqmm/1x16 sqmm and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.).Removal of old & Used LT Cable 3x50 sqmm/1x16 sqmm and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.).
52Removal of old & Used weasel conductor and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.).Removal of old & Used weasel conductor and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.).

AI Tender Summary

OUR REF NO 56215044
AUTHORITY Government Departments
TENDER VALUE 6.44 Lakhs
LAST DATE 14-07-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Custom Bid For Services - 33 Kv Line Strengthening Work And Lt Line Strengthening Work And Other Lt Line Associated Work On Semi-Turnkey Basis In Business Plan 2026-27 Under The Area Of Edd, Kiraoli And Kheragarh Agra - Part-A (Supply Of Material)Suspension Cl With I Hook , I Hook , J Hook , Dead End Cl With I Hook , Cl For Lt Distribution Box , Piercing Connector , Lt Pole Cl With Nut & Bolt For Pcc Pole , Earth Wire Cl For Pcc Pole , Pg Cl , V Type Cross Arm Cl For 33 Kv , F-Bracket For 33 Kv , Alu. Paint , Red Oxide Paint , Top Channel For 33 Kv , Holding Cl , Brassing Set , Cl For Fixing Of Cable And Cable Box , Part-B (Erection Work)Carriage Of Pcc Pole 8.5 Mtr. Long From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of St Pole 11 Mtr Long From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) , Cartiage Of Line Material From Store Center Agra To Work Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) Line Material Viz. Lt Distribution Box (48), Stone Pad (96), Stay Set (13), Earthing Complete (23), V Type Cross Arm For 33 Kv (15), Polymer Pin Insulator For 33 Kv (51), Dropper Channel (2), Disc Fitting For 33 Kv (12), Disc Insulator For 33 Kv (12), Jointing Kit O/D 3X300 Sqmm (2) Etc And Other Line Material As Required In Estimate/Package) , Cartiage Of Lt Abc Cable 3X50 Sqmm (320 Mtr.), Lt Abc Cable 3X95 Sqmm (2750 Mtr.), Lt Abc Cable 3X120 Sqmm (440 Mtr.), Alu. Cable 1X16 Sqmm (40 Mtr.), 33 Kv Cable 3X300 Sqmm (100 Mtr.) From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50Kms.) , Erection And Grouting Of Pcc 8.5 Mtr. Long Single Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of St Pole 11 Mtr. Long Single Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of St Pole 11 Mtr. Long (Double Pole) In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Digging & Laying Of 33 Kv Cable 3X300 Sqmm Then Laying Earth And Its Levelling And Rammuring Etc. Complete Work As Respo Norms As Per Respo Norms And Direction By Superivising Engineer. , Laying Of 11 Kv Xlpe Cable 3X300 Sqmm Overhead With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Abc Cable 3X50 Sqmm/3X95/3X120 Overhead With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Alu. Cable 1X16 Sqmm Overhead With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Filling Of 33 Kv Cable Jointing Kit 3X300 Sqmm O/D And Making Connection As Per Respo Norms & Direction By Supervising Engineer. , Erection And Grouting Of Stay Set As Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Erection Of Earthing Complete As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Concreting Of Support Pcc/St Pole. Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Concreting Of Support Of Stay Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Concreting Of Led 1X16 Sqmm Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Fixing Of Dropper Channel With Cl As Per Resop Norms And Direction By Supervising Engineer. , Fixing Of Top Channel For 33 Kv As Per Resop Norms And Direction By Supervising Engineer. , Fixing Of F-Bracket For 33 Kv As Required On Poles As Per Respo Norms And Direction By Supervising Engineer. , Installation Of Lt Distribution Box With Cl S As Per Respo Norms And Direction By Supervising Engineer. , Fixing Of P.G. Cl S As Per Respo Norms , Fixing Of V Type Cross Arm Cl For 33 Kv As Per Respo Norms , Fixing Of Polymer Pin Insulator For 33 Kv As Per Respo Norms , Fixing Of Suspension Cl With I Hook As Per Respo Norms , Fixing Of I Hook As Per Respo Norms , Fixing Of J Hook As Per Respo Norms , Fixing Of Cl For Cable Box , Fixing Of Disc Fitting For 33 Kv , Fixing Of Brassing Set , Fixing Of Piercing Connector As Per Respo Norms , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Single Coat Of Red Oxide Paint As Per Respo Norms And Direction By Supervising Engineer. , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Double Coat Of Alu. Paint As Per Respo Norms And Direction By Supervising Engineer. , Removal Of Old & Used Lt Cable 3X50 Sqmm/1X16 Sqmm And Receive Back To Store Center Agra From Work Site Along With Loading Unloading Both Ends (Approx 50 To 70 Km.). , Removal Of Old & Used Weasel Conductor And Receive Back To Store Center Agra From Work Site Along With Loading Unloading Both Ends (Approx 50 To 70 Km.).
Basic Detail
Tender No GEM/2026/B/7723541
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 29 Jun 2026
Submission Date 14 Jul 2026
Open Date 14 Jul 2026
Finance
Tender Value 6.44 Lakhs
Tender Fee Ref. Documents
EMD 6500
Exemption Not Available
Document List
a7e27291-bd5c-4c9b-abdd-c33897effa29.pdf
1782739886.pdf
1782739891.pdf
1782739896.pdf
1782739903.pdf
1782739908.pdf
1782739912.pdf
1782739921.pdf
1782739945.pdf
1782739952.pdf
1782739956.pdf
1782739964.pdf
1782739969.pdf
1782739976.pdf
1782740833.xlsx
atc_ffcb5781-f080-4277-86ce1782740307471_EDC1AGRABUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 29, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 14, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Jul 14, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

a7e27291-bd5c-4c9b-abdd-c33897effa29.pdf

pdf

1782739886.pdf

pdf

1782739891.pdf

pdf

1782739896.pdf

pdf

1782739903.pdf

pdf

1782739908.pdf

pdf

1782739912.pdf

pdf

1782739921.pdf

pdf

1782739945.pdf

pdf

1782739952.pdf

pdf

1782739956.pdf

pdf

1782739964.pdf

pdf

1782739969.pdf

pdf

1782739976.pdf

xlsx

1782740833.xlsx

pdf

atc_ffcb5781-f080-4277-86ce1782740307471_EDC1AGRABUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders