Petroleum and Natural Gas Government Departments Closing in 7 days TDR #56213738

Tender For Tender For Rate Contract For The Period Of Two Years For Steel Pipeline Network Rerouting, Diversion And Maintenance Of Pipeline Network Assets For Cgd Network Of Mngl Nashik

Issued by Government Departments · Nashik, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Jul 2026
7 days left
EMD
2 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Nashik → Maharashtra
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Tender For Rate Contract For The Period Of Two Years For Steel Pipeline Network Rerouting, Diversion And Maintenance Of Pipeline Network Assets For Cgd Network Of Mngl Nashik

BOQ

Name of Work:- Tender for rate contract for the period of two years for Steel Pipeline Network rerouting, Diversion and maintenance of pipeline network assets for CGD Network of MNGL Nashik
Sl. No. Item Description
1Re-routing, Laying OR Replacement of Damage of UG Steel PipelineThe SOR covers re-routing, Laying, replacement of steel pipe line by Transportation, loading, unloading of the line pipes to the site, coordination, Liasioning, excavating the trench in all site conditions, laying of pipeline with dewatering and cleaning of pit or trench if required, Welding, NDT, DPT, joint coating, holiday testing, backfilling, laying of warning mat, painting, R-95, hydrotesting, pigging, swabbing of pipes, N2 purging etc. which required to complete the pipeline mechanically and commissioning of pipeline as per approval by EIC. This is operation and maintenance work so the scope covers closing the valves of both sides of the work place, venting the natural gas of the section, Nitrogen purging (Saperate rate as per below SOR) checking LEL & cutting the line from both ends of existing pipeline, surface and bevel preparation, DP checking, Drying of the section if required etc. and as per requirement at site and direction given by EIC. Contractor to carry out all the activities involved in Pre- commissioning and commissioning and ensure the safety requirements such as PPEs, barricading, sign boards, blinking light etc. to complete the section work in day and night as directed by EIC. Contractor to arrange all necessary equipment, DG, pipe line fittings, consumables, manpower with PPE's, Fire extinguishers, Fire fighting services of local coordination as required etc. to complete the job. After Completion of the job all related documents to be submitted. Job shall be carried out as per ASME B 31.8/ API 1104 in all aspect as per the satisfaction of MNGL.
24'' Dia REROUTING UG PIPELINE
36'' Dia REROUTING UG PIPELINE
410'' Dia REROUTING UG PIPELINE
5Above Ground PipingThe SOR covers re-routing, installation, Modification, Upgradation, Replacement of steel pipe line, valve, fittings, IJ etc. by Transportation, loading, unloading at the site, coordination, Permit, providing pipe support in all site conditions, Welding, IJ installation, NDT, DPT, pre-post & haydro testing, painting, swabbing, N2 purging, supply of safety equipments-PPEs which required to ensure the safe site and working conditions as per requirement and direction by EIC. This is operation and maintenance work so the scope covers closing the valves of both sides of the work place, venting the natural gas of the section, Nitrogen purging (Saperate rate as per below SOR), checking LEL & cutting the line, surface and bevel preparation, DP checking, Drying of the section etc. as per site requirement. After Completion of the job all related documents to be submitted. Job shall be carried out as per ASME B 31.8/ API 1104. SOR also covers the flange joint dismantling, providing support of pipeline, gasket & stud-bolts replacement as required, painting, flow direction, copper earthing jumpers, insulated, U-clamp, Neoprine sheet insulator, anchor fastener, installation, civil work etc. which required at site and satisfactory of the EIC. this SOR covers the hook up with commissioned pipeline and gas-in with approval from EIC without additional cost to MNGL. (Inch Dia = Pipe Diameter (in inches) × Number of Joints)
6Re-routing/Laying OR Replacement,AG PIPELINE for all size Dia
7Mobilization/Hook Up/ UG-AG Pipeline work connectivity etc.The SOR covers additional manpower, site coordination,Liasioning, tools, equipments, machines, excavation, welding, NDT, Coating, backfilling, etc. whichever is required to complete the given hook up work in totality for all size of UG Pipeline. vendor can claim only 1 hook up/Mobilization qty per site/job/location etc.The SOR covers the charges encoured with mobilization of manpower, tools, equipments, machines, site execution, transportation, coordination, safety Equipments,PPEs,water etc. against Planed, unplanned-emergency services/ job with timeline given and directed by EIC. it covers receiving & transportation, shifting of old pipes to MNGL’s designated place (Wherever applicable) etc. which required as per site requirement & directions by EIC.The SOR also covers, distribution of notice/ intimation letter to societies, police station, corporation, fire brigade etc. to execute the decommissioning and commissioning of the pipeline/ section including support for closing of both sides valves, venting the natural gas of the section, Nitrogen purging including supply, vaporizer, checking LEL etc. as per requirement at site and direction given by EIC. Contractor to carry out all the activities involved in De-commissioning and commissioning and ensure all safety requirements such as PPEs, barricading, sign boards, blinking light etc. to complete the section work in day and night as directed by EIC.
8Hook Up of steel line for All Dia Size/Mobilization
9Steel pipeline Road/Water Body/railway etc,CrossingThe SOR covers Complete work of the Water body, road & railway etc. crossing (between the limits are defined as approved drawings) by HDD/Boring method including “Receiving and taking over\\" owner supplied three layer PE coated line pipes from Owner's designated place to issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling loading, unloading, aligning etc., Site Co-cordination, Liasioning with Authority, Pre-construction survey, Manpower, equipment, other resources and acquiring the required land for storage, fabrication including string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type Heat Shrink Sleeve (Direx Sleeve) and repair of pipeline coating with special repair patch materials as per specification, pre-testing etc. of complete string made for crossing access for Contractor ,execution, supply of casing pipe as per tender, etc. but not limited to, following works in accordance with specifications and instruction of Engineer-in-charge and as per all provision of Contract Document. Backfilling of the ditch/ trench including restoration and clean-up of area and all other works including pigging, cleaning, final hydro testing etc. along with mainline works {as mentioned in Tender documents) required as per specification, approved drawings, calculations, methods and to the satisfaction of Engineer-in-charge and/or as directed by concerned Authority.In case crossing for MP Pipeline, will be executed as per the scope given above and in tender document with CS Pipeline. MDPE Pipeline will be connected at both end of the crossed pipeline section through 4\\"X 125 MM TF. The supply & installation of TF can be claimed separately as per given SOR in this tender.
10Steel Pipeline Road Crossing(Boring/HDD)upto 6\\"
11Steel Pipeline Road Crossing(Boring/HDD) 10/12\\"
12Steel Pipeline Crossing(Boring/HDD) upto 6\\" with supply & inst. Casing
13Steel Pipeline Crossing(Boring/HDD) 10/12\\" with supply & inst. Casing
14MDPE PIPELINE LAYING
15Laying OF MDPE Pipeline Dia=63-90 MM
16Laying OF MDPE Pipeline Dia=125-180 MM
17Replacement of steel valves (Flange End) Various sizes in piping system including blind removal providing temporary supports if necessary, nut bolt loosening / tightening/replacement as required, supply of gasket, painting and torque setting with all tools/tackles/manpower etc. of valves sizes, Hydra and other lifting equipment inclusive of scaffolding arrangement at site if required. Contractor to arrange including all necessary equipment, tools & tackles, consumables, transportation, manpower with PPE's. Dismantling of piping spool along with flanges from line for various pipe sizes and putting blind including nut bolt removing & handling with all tools / tackles / manpower/machinery etc. SOR also covers the transportetion of matril form / to MNGL stor, return, pre hydro etc. which required to complet the work.
18INSTALL,VALVE,STEEL,<=1''NB
19INSTALL,VALVE,STEEL,2''NB
20INSTALL,VALVE,STEEL,4\\"NB
21INSTALL,VALVE,STEEL 6''- 8\\"NB
22INSTALL,VALVE,STEEL, 10\\"- 12\\"NB
23Replacement of Steel Valves (Butt Welded) :-Valve replacement which is installed on steel pipe line network Activity shall be carried including transportation, old pipe/valve to / from MNGL store., loading, unloading of the valve to the site, excavating the trench for new valve installation, dewatering and cleaning of pit or trench, Painting, R-95,Welding the section for valve assembly, NDT, DPT, joint coating holiday testing, laying, cleaning section by pneumatic pressure, hydrotesting of valve assembly, closing the valves of both sides of the work place. if the tapping in between the section same to be close. venting the natural gas of the section, Nitrogen purging, Re-installation of purge valves (wherever required), barricading the site with sign boards, cutting the line from both ends of existing pipeline/valve section, surface and bevel preparation, DP checking and welding the pipe with the new section, NDT(Radiography, UT,) MPT coat and wrap for golden joints, Holiday testing, laying of warning mat and back-filling the same etc. Drying of the section if required & construction of valve chamber by RCC Grade M:20 (water proof Chamber) Pre-cast/Steel cover with necessary fabrication (50Ton load capacity). Contractor to carry out all the activities involved in Pre- commissioning and commissioning of the complete section work as directed by OWNER EIC. Contractor to arrange all necessary equipment, pipe line fittings, consumables, manpower with PPE's, Fire extinguishers, Fire fighting services of local corporation as required etc. to complete the job. After Completion of the job all related documents to be submitted. Job shall be carried out as per ASME B 31.8/ API 1104. Transportation, Pneumatic testing, Nitrogen Purging, Hydrotesting, Flushing, Swabbing, Drying and NDT etc.
24INSTALL,VALVE,STEEL,<=1''NB
25INSTALL,VALVE,STEEL,2''NB
26INSTALL,VALVE,STEEL,4\\"NB
27INSTALL,VALVE,STEEL,6'' & 8'' NB
28INSTALL,VALVE,STEEL, 10'' & 12\\"NB
29Painting of Pipeline, Structure, etc.Power Spray or by hand painting of pipelines / pipings/ fittings/piping spool / fixtures etc. including , supply of paint and application of 2 coat of high build chlorinated rubber. Poly urethane/ zinc phosphate primer of 70 micron (DFT) each and two coats of finished paint of epoxy paint of golden yellow colour 90 micron (DFT) each of approved make as per the approved vendor list attached with this tender to give an even shade after proper scraping of existing paint by power brushing or suitable method and clearing of surface free from foreign materials including stenciling of line numbers, pipe tagging, flow direction arrow, other lettering as found condition of pipeline as per instruction of OWNER EIC. Contractor to arrange including all necessary equipment, material (paint etc.), tools & tackles, consumables, transportation, manpower with PPE's.(Aboveground & Valve chamber)
30Painting of Exposed/Above Ground Pipeline
31Coating:The job includes the preparation of trenches, pipe & for steel valve surface preparation by mechanical cleaning through power brush, Primer application, wrapping of tape, edge preparation, holiday test etc. SOR covers supply of all consumables, utilities, equipment, manpower, cleaning and surface preparation tools, testing tool, handling, transportation etc. which required to complete the job as per instruction of EIC.the application are repair of Live line repair 3LPE coated straight pipe, Valve coating refurbishment etc. detail procider and surface preparation etc is define in tender document.
32Supply of VISCOELASTIC COATING/COLD TAPE & APPLICATION
33SUPPLY, FABRICATION AND INSTALLATION
34Fabrication work : PIPE SUPPORT, STRUCTURE, chequre platePipe Supports, Valve supports, Structures including C,T angle/channel & Plate upto 10-20 mm thick etc. fabrication and erection of all types of pipe supports, U clamps with sleeves of various sizes (2\\",4\\", 6\\", 10\\" and 12\\") , saddle, guide, stops, cradles, Neoprene sheet, turn buckles, anchors, T posts, stockade/trestle and pipe bridge for overhead piping, frames for canopy, approach ladders and platforms, crossover, cable tray supports etc., including painting suitable for highly corrosive area as per specification labour and supervision & complete work as per drawing, specifications and instructions of Engineer-in-charge (bolts, nuts, washers, u-clamps etc. for supporting shall be supplied by the Contractor within the rates quoted. These items will not be measured and paid separately) The work is to be completed in all respect as per scope of work and specification. Each and every item install in existing or new network, TC's & reports shall be submit to the Owner EIC. Contractor to arrange including all necessary equipment, tools & tackles, consumables, transportation, manpower with PPE's.
35SUPPLY, FABRICATION AND INSTALLATION
36SUPPLY OF MANPOWER, Tools, Equipment etc.Schedule of rates for extra works for manpower, machine, equipment etc. supply as per work requirement not relevent to reguler given work, need incase of Urgency or individual work etc. as per direction by EIC.(Additional manpower if required in case of emergency and approved by OWNER EIC) 8 hours=dayContractor to arrange all necessary equipment, tools & tackles, consumables, ladder, transportation, manpower with PPE's etc.
37SUPPLY, EXTRA, MANPOWER, RIGGER
38SUPPLY, EXTRA,MANPOWER,WELDER
39SUPPLY,EXTRA,MANPOWER, FITTER
40Helper/Unskilled Labour
41excavator with bucket/breakar
42Diesel operated power generator with oprator, 60 KVA
43Tractor breaker with pnumatic arrangement
44On rent Crane up to 12T with lifting belts
45Truck (19 ft. long) Ashok Ley (20km)
46Civil Work - Construction of Valve chamber with water proofing, DRS, MRS, Foundation,Pipline Protection, etc. as per direction of EIC
47RCC M20/25 INCL.STEEL DAI 12 mm
48PCC1:2:4
49Construction of STEEL VALVE Chambers RCC M25 & steel 12-16mm for all Size
50Supply & Inst. of RCC heavy duty covers, 40T & above
51Supply and installation of Steel Pipeline Pole, Route MarkerSOR covers the supply of manpower , materials, fabrication, civil work, etc. which required to installed the route markers viz,(Direction, Warning & KM Post) markers with painting as per drawing
52Pipeline RCC boundary / route marker
53Pipeline all Pole markers with post & foundations
54Supply & laying of RCC tiles as per drawing if any other location needed as per request by EIC
55Supply and Installation of Scaffolding
56SUPPLY, INSTALL,SCAFFOLDING
57Supply of 150/300 Class Spiral wound Gasket (Inner & Outer SS 316 with graphite filled)
58SUPPLY,GASKET,SPIRAL,WOUND,-,<=3\\" Dia
59SUPPLY,GASKET,SPIRAL,WOUND,-,4\\" Dia
60SUPPLY,GASKET,SPIRAL,WOUND,-,6\\" Dia
61SUPPLY,GASKET,SPIRAL,WOUND,#-,8\\" Dia
62SUPPLY,GASKET,SPIRAL,WOUND,-,10\\" Dia
63SUPPLY,GASKET,SPIRAL,WOUND,#,12\\" Dia
64Excavation of Built up surface/Hard Rock/Asphalt Surface/concrete road for U/G steel pipeline, shutdown activity, etc. on steel networkExcavation below1.5 meter (For additional excavation) by Man or Machine Providing Shuttering to entire Pits Providing Hard Barricading to entire Pit Shifting of Soil from site. Backfilling is also to be done if required
65EXCAVATION MUDDY SOIL,MANUAL/M/C, Backfilling (if required)
66Supply and Installation of Steel Pipeline Fittings
67Weld Neck (B-16.5,300 # A105, Serrated finish)
6810\\" NB, RF End thickness to match with pipe wall thickness
696\\" NB, RF End thickness to match with pipe wall thickness
704\\" NB, RF End thickness to match with pipe wall thickness
712\\" NB, RF End thickness to match with pipe wall thickness
721\\" NB, RF End thickness to match with pipe wall thickness
73Blind Flanges (B-16.5, 300 # A105, Serrated)
7410\\" NB, RF End thickness to match with pipe wall thickness
756\\" NB, RF End thickness to match with pipe wall thickness
764\\" NB, RF End thickness to match with pipe wall thickness
772\\" NB, RF End thickness to match with pipe wall thickness
781\\" NB, RF End thickness to match with pipe wall thickness
79Elbow (Seamless) 90° Elbow (A234 Gr. WPHY52, B-16.9, 1.5D) Min Thickness 6.4MM
8010\\" NB Sch. Std.
816\\" NB Sch. Std.
824\\" NB End thickness to match with pipe wall thickness
832\\" NB Sch. 80
841\\" NB SW, 3000#
85Elbow (Seamless) 45° Elbow (A234 Gr. WPHY52, B-16.9, 1.5D) Min Thickness 6.4MM
8610\\" NB Sch. Std.
876\\" NB Sch. Std.
884\\" NB End thickness to match with pipe wall thickness
892\\" NB Sch. 80
901\\" NB SW, 3000#
91Elbow (Seamless) 90° Elbow (A234 Gr. WPHY52, B-16.9, R= 3 D) Min Thickness 6.4MM
9210\\" NB Sch. Std.
936\\" NB Sch. Std.
944\\" NB End thickness to match with pipe wall thickness
952\\" NB Sch. 80
96Elbow (Seamless) 45° Elbow (A234 Gr. WPHY52, B-16.9, R= 3 D) Min Thickness 6.4MM
9710\\" NB Sch. Std.
986\\" NB Sch. Std.
994\\" NB End thickness to match with pipe wall thickness
1002\\" NB Sch. 80
101Elbow (Seamless) 22½° Elbow (A234 Gr. WPHY52, B-16.9, R= 3 D) Min Thickness 6.4MM
10210\\" NB Sch. Std.
1036\\" NB Sch. Std.
1044\\" NB End thickness to match with pipe wall thickness
105Elbow (Seamless) 11/½° Elbow (A234 Gr. WPHY52, B-16.9, R= 3 D) Min Thickness 6.4MM
10610\\" NB Sch. Std.
1076\\" NB Sch. Std.
1084\\" NB End thickness to match with pipe wall thickness
109Tees (Seamless) Equal Tee/Unequal Tee (A234 Gr. WPHY52, B16.9) Min Thickness 6.4MM
11010\\" NB x 10\\" NB x 10\\" NB Sch. Std.x Sch. Std.
11110\\" NB x 10\\" NB x 6\\" NB Sch. Std.x Sch. Std.
11210\\" NB x 10\\" NB x 4\\" NB Sch. Std.x Sch. XS
1136\\" NB x 6\\" NB x 6\\" NB Sch. Std.x Sch. Std.
1146\\" NB x 6\\" NB x 4\\" NB Sch. Std.x Sch. XS
1154\\" NB x 4\\" NB x 4\\" NB End thickness to match with pipe wall thickness
1164\\" NB x 4\\" NB x 2\\" NB End thickness to match with pipe wall thickness x Sch.80
117Reducer (A234 Gr. WPHY52, B16.9)Min Thickness 6.4MM
11810\\" NB x 6\\" NB End thickness to match with pipe wall thickness
11910\\" NB x 4\\" NB End thickness to match with pipe wall thickness
1206\\" NB x 4\\" NB End thickness to match with pipe wall thickness
1216\\" NB x 4\\" NB End thickness to match with pipe wall thickness
1224\\" NB x 2\\" NB End thickness to match with pipe wall thickness
123Weldolet and Sockolet Weldolet (A 234 Gr. WPHY52, BW)
12410\\" NB x 4\\" NB Sch. Std.
12510\\" NB x 2\\" NB Sch. Std.
1266\\" NB x 2\\" NB Sch. Std.
1274\\" NB x 2\\" NB Sch. Std.
1286\\" NB x 1\\" NB Sch. Std.
1294\\" NB x 1\\" NB Sch. Std.
1304\\" NB x 3/4\\" NB Sch. Std.
131Butt Weld Disc End Cap (A234 Gr. WPHY52, B16.9)
13210\\" Dia #
1336\\" Dia #
1344\\" Dia #
135Supply of Transition Fittings for 4' CS to 125/90/63 mm MDPE pipeline
136Supply of Nitrogen (With tubings, N2 regulator and fittings etc.)
137N2 Cylinders (7 Cub. Meter)
138Cubic Meters (Liquid Nitrogen)
139PART B
140Technician (Semiskilled)
141Helper (Unskilled) Qualification- 10th & Min Experience of 4 years.
142Maintenance Vehicle-(Steel O&M)The contractor has to provide TATA YODHA or equivalent with CNG/Diesel vehicle for 12 Hrs. per day to MNGL along with Branding & Necessary Modification (Internal & External) to perform O&M activity for round the clock. Model shall be BS VI having running KM not more than 20000 KM with necessary provision to store De-waterig Pump, Portable Generator 5.5 KVA, Tools & Tackles & Consumables etc as per EIC. Contractor has to ensure the compliance with prevailing RTO Regulations. Driver is in the scope of contractor. Average running per month is 3000 KM(GPS Tracking System) and will bereconciled in 12 month and the extra KM can be claimed as per seaprate SOR
143MV For Extra Km
144ConsumableAnchor Fastner,Grease, Paint, Painting, Hyd. Oil, Cotton, Nut-bolts, Petrol for Generator, Stationary items, Tools-tackles-mechine etc.,which is required to perform the daily job and not covered in reguler SOR, etc. as per the tender documents and satisfactory of EIC.
145NOTES: 1) PLEASE ENTER SERVICE CHARGES FOR ITEM NO. 15 and 15.1 AND ENTER UNIT RATE FOR Remaining all items. 2) Please note that rate fixed for SOR item No. 15.3. Hence, service charge or rate on SOR item No. 15.2 is not considering for evaluation. 3) Service charge per man-month:This covers revision in statutory & DA, appointment of coordinator, mobilization of excavation labour as per site requirement , supply of tools, equipment, consumables etc. like squeezer, chuna etc. for each site, manpower management, office logistics, GPS/VTS tracking system, app handling, site coordination, communication, coordination with third party & authorities etc. which require to execute the contract, prevention of site, emergency handling and coronation etc. Service Charge inclusive of all taxes & duties except Goods & Service Tax (in Rs.) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56213738
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 21-07-2026
Authority
Authority Name Maharashtra Natural Gas Ltd
Work Description Tender for Tender For Rate Contract For The Period Of Two Years For Steel Pipeline Network Rerouting, Diversion And Maintenance Of Pipeline Network Assets For Cgd Network Of Mngl Nashik
Basic Detail
Tender No MNGL/CP/2026-27/58
Bidding Type Tender
Location
City Nashik
State Maharashtra
Key Dates
Publish Date 29 Jun 2026
Submission Date 21 Jul 2026
Open Date 22 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 2 Lakhs
Exemption Available
Document List
Annexure1Drawing.pdf
BOQ_329324.xls
e7348c8f-a707-49d4-8c94-b5bc5085ead3.html
TENDER58Final.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 29, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Jul 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
pdf

Annexure1Drawing.pdf

xls

BOQ_329324.xls

html

e7348c8f-a707-49d4-8c94-b5bc5085ead3.html

pdf

TENDER58Final.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender