Drinking Water Supply and Sanitation Government Departments Closing in 1 days TDR #56212378

Tender For Permanent Restoration Work For Damaged Due To Floods During August / Sepetember 2025 W.R.T Various Water Supply Schemes In Sub Divn. Kandi-Iii Under (Sasci 2026-27)1. Repairing To 50000 Glns Oht At Jallo Chak2. Repairing To 20000 Glns Gsr

Issued by Government Departments · Jammu, Jammu and Kashmir
Tender Value
60.90 Lakhs
Estimated cost
Bid Submission
14 Jul 2026
1 days left
EMD
1.21 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jammu → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Permanent Restoration Work For Damaged Due To Floods During August / Sepetember 2025 W.R.T Various Water Supply Schemes In Sub Divn. Kandi-Iii Under (Sasci 2026-27)1. Repairing To 50000 Glns Oht At Jallo Chak2. Repairing To 20000 Glns Gsr At Ratnu Chak3. Restoration Of R/Main & Distribution Line Of Water Supply Scheme Chatta4. Restoration Of R/Main & Distribution Line Of Water Supply Scheme Kana - Chargal5. Construction Of 10000 Glns Sump Tank / Gsr Incl. Valve Pit And Drain At Chabba (Kana-Chargal)6. Protection To Chabba Dug-Well And Pumping Station Mela At Kana-Chargal (Crate Work)7. Cnstruction Of Compound Wall At Pumping Station Chargal & Mela (Kana-Chargal)

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 04-Jul-2026 clarification for time of completion Other 14-Jul-2026
2 09-Jul-2026 Date Extend Date 14-Jul-2026
3 04-Jul-2026 clarification for time of completion Other 08-Jul-2026

BOQ

Name of Work:- Permanent Restoration work for damaged due to floods during August / Sepetember 2025 w.r.t various water supply schemes in Sub divn. Kandi-III under (SASCI 2026-27)1. Repairing to 50000 Glns OHT at Jallo Chak2. Repairing to 20000 Glns GSR at Ratnu Chak3. Restoration of R/Main & Distribution Line of WSS Chatta4. Restoration of R/Main & Distribution Line of WSS Kana – Chargal5. Construction of 10000 Glns Sump Tank / GSR incl. Valve Pit and Drain at Chabba (Kana-Chargal)6. Protection to Chabba Dug-Well and Pumping Station Mela at Kana-Chargal (Crate Work)7. Cnstruction of Compound Wall at Pumping Station Chargal & Mela (Kana-Chargal)
Sl. No. Item Description
1Demolishing cement concrete manually/by mechanical means includingdisposal of material within 50 meters lead as per direction of Engineer-in-charge: 1:3:6 richer mix
2Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead
3Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides andrammingofbottoms liftupto 1.5m, including getting out excavated earth and disposal of surplus excavatedearthas directed
4Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto1.5m, as directed by Engineer-in-Charge All kinds of soil:
5Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50meters and lift upto 1.5 m,as directed by Engineer-in-Charge.
6Supply of Wire Mesh Crate including carriage from nearest soource of site
7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of Centering & Shuttering (All work upto Plinth Level with 1:4:8 (1 Cement : 4 Sand : 8 Graded stone agg) upto 40 mm
8Providing and laying in position cement concrete of specified grade including curing but excluding the cost of Centering & Shuttering (All work upto Plinth Level with 1:3:6 (1 Cement : 3 Sand : 6 Graded stone agg) upto 20 mm
9Providing and laying in position cement concrete of specified grade including curing but excluding the cost of Centering & Shuttering (All work upto Plinth Level with 1:2:4 (1 Cement : 2 Sand : 4 Graded stone agg) upto 40 mm
10Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level
11Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto floor V Level
12Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiralstair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3(1cement:1½ coarse sand: 3 graded stone aggregate 20mm nominal size)
13Reinforced cement concrete work in arches, arch ribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 1:1½:3(1cement:1½coarsesand:3gradedstoneaggregate20mmnominalsize)
14Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
15Providing & Fixing of G I Mesh (24 Gauge)
16Centring and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
17Extra for Circular Work
18Centring and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
19Extra for Circular Work
20Centering and shuttering including strutting, proppingetc.and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers
21Centering and shuttering including strutting, proppingetc.and removal of form for: Arches, Domes, Vaults upto 6 Mtr Span
22Extrafor arches, domes, vaults exceeding 6mspan
23Brick work with common burnt clay F.P.S. (non-modualar) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement :6 coarse sand)
24Extra for Brick Work with common burnt clay bricks / cement concrete bicks in super-sturcture above plinth level upto floor five level
25Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in: Cement mortar1:4 (1cement:4coarsesand)
26Extra for half Brick masonry in superstructure above plinth level upto floor V level.
2715mm thick Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 coarse sand) .
2812 mm thick Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 coarse sand) .
29Removing mortar from bricks and cleaning bricks including stackingwithinaleadof50m.
30Finishing walls with water proofing cement paint of required shade on Newwork( two or more coats applied @3.84kg /10sqm)
31Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete 40 mm thick with 20 mm nominal size stone agg.
32Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat ofapprovedsteelprimerallcomplete.
33Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mmangle iron and 3mm M.S. gusset plates at the junctions and corners, allnecessary fittings complete, including applying a priming coat of approvedsteelprimer. Using M.S.angles 40x40x6 mm for diagonal braces
34Providing & Fixing G P Sheet Strip Water seal 1.25 mm nominal thick at construction joints incl. Jointing of ends so as to form a continuous barrier stripe area
35Providing & Fixing Plain PVC Bend (ISI) of required degree 110 mm dia (LMR)
36Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes,manually/bymechanicalmeansincludingstackingofpipeswithin50 meters leadas per direction of Engineer-in-charge: 50 mm to 100 mm nominal bore
37Laying and fitting of G.I.pipes (all classes) complete excluding cost of pipes, fittings and Earthwork, refilling. 80mm dia G.I. pipes
38Laying and fitting of G.I.pipes (all classes) complete excluding cost of pipes, fittings and Earthwork, refilling. 50mm dia G.I. pipes
39Providing, Laying and fitting of G.I.pipes (all classes)complete Including cost of pipes, fittings but excluding Earthwork. 100 mm (M)
40Providing, Laying and fitting of G.I.pipes (all classes)complete Including cost of pipes, fittings but excluding Earthwork. 80 mm (M)
41Providing, Laying and fitting of G.I.pipes (all classes)complete Including cost of pipes, fittings but excluding Earthwork. 80 mm (L)
42Providing, Laying and fitting of HDPE Pipe complete Including cost of pipes, fittings but excluding Earthwork. 75 mm
43Providing, Laying and fitting of HDPE Pipe complete Including cost of pipes, fittings but excluding Earthwork. 63 mm
44Providing and fixing of 100 mm dia C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately). Class - II
45Providing and fixing of 80 mm dia C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately). Class - II
46Providing and fixing gun metal non-return valve of approved quality (screwedend) 100mm nominal bore
47Providing and fixing gun metal non-return valve of approved quality (screwedend) 80mm nominal bore
48Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 100 mm Nominal Bore
49Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 80 mm Nominal Bore
50Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 65 mm Nominal Bore
51Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 50 mm Nominal Bore
52Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 40 mm Nominal Bore
53Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete 50 to 80 mm nominal bore
54Welding of Joints by electric arc, welding incl. testing & commissioning of joints
55Filling available excavated earth (excluding rock) intrenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, lead upto 50m and lift upto1.5m.
56Hand-packing stones in wire-crates; excluding cost of crates and stones
57Supply of Soling Stones
58Carriage of Sand and Bazri from nearest source of supply to the site of work below 40mm by M/T 20 km
59Carriage of Sand and Bazri from nearest source of supply to the site of work upto 40mm by M/T 20 km
60Carriage of Sand and Bazri from nearest source of supply to the site of work upto 20mm 10 Km by M/T & 500 Mtr H/Load
61Carriage of Bricks from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 10 km by MT.
62Carriage of boulders average 20 km by Mechanical means
63Carriage of boulders average 10 km by Mechanical means Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56212378
AUTHORITY Government Departments
TENDER VALUE 60.90 Lakhs
LAST DATE 14-07-2026
Authority
Authority Name Public Health Engineering Department
Work Description Tender for Permanent Restoration Work For Damaged Due To Floods During August / Sepetember 2025 W.R.T Various Water Supply Schemes In Sub Divn. Kandi-Iii Under (Sasci 2026-27)1. Repairing To 50000 Glns Oht At Jallo Chak2. Repairing To 20000 Glns Gsr At Ratnu Chak3. Restoration Of R/Main & Distribution Line Of Water Supply Scheme Chatta4. Restoration Of R/Main & Distribution Line Of Water Supply Scheme Kana - Chargal5. Construction Of 10000 Glns Sump Tank / Gsr Incl. Valve Pit And Drain At Chabba (Kana-Chargal)6. Protection To Chabba Dug-Well And Pumping Station Mela At Kana-Chargal (Crate Work)7. Cnstruction Of Compound Wall At Pumping Station Chargal & Mela (Kana-Chargal)
Basic Detail
Tender No e-NIT No. 10 of 2026-27
Bidding Type Tender
Location
City Jammu
State Jammu and Kashmir
Key Dates
Publish Date 04 Jul 2026
Submission Date 14 Jul 2026
Open Date 01 Jan 0001
Finance
Tender Value 60.90 Lakhs
Tender Fee 1000
EMD 1.21 Lakhs
Exemption Not Available
Document List
BOQ_1016378.xls
ecdb85b9-db67-4c31-8ba9-258e892f4a38.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 04, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 14, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 1 day
Jul 14, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 1 day
Jul 08, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 14, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1016378.xls

html

ecdb85b9-db67-4c31-8ba9-258e892f4a38.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders