Tender For Providing, Fitting, Installation, Testing And Commissioning Of 20000 Gph X 10-13 Meter Head Submersible Mono Bloc At Channi Mansar Stage-0, Impregnation / Repair / Rewinding Of 50 Hp Motor Alongwith Allied Works At Pumping Station Channi M
Tender Overview
Project Description
Tender for Providing, Fitting, Installation, Testing And Commissioning Of 20000 Gph X 10-13 Meter Head Submersible Mono Bloc At Channi Mansar Stage-0, Impregnation / Repair / Rewinding Of 50 Hp Motor Alongwith Allied Works At Pumping Station Channi Mansar Stage-0,Repair Of 100 Kva And 63 Kva Voltage Stabilizer Alongwith Filling Of T-Oil Channi Mansar Stage-0, Providing And Fitting Of Electro Mechanical Components Cables, Mccb, Valves, Alongwith Allied Works At Channi Mansar Stage-0, 1St And 2Nd , Repair To 250 Kva Electric Transformer Alongwith Allied Works At Channi Mansar Stage-0, Repair To 140 Ere Lt Control Panel Alongwith Allied Works At Channi Mansar Stage-1St
BOQ
| Sl. No. | Item Description |
| 1 | Providing, fitting, installation, testing and commissioning of 20000 GPH x 10-13 meter head submersible mono bloc at Channi Mansar stage-0 |
| 2 | Providing, fitting, installation, testing and commissioning of 20000 GPH x 10-13 MH mono submersible at pumping station Channi Mansar stage 0 new with following specifications:-Pump of genuine make with latest ISI standards)Discharge-20000 GPHHead- 10-13 meter headRPM-2900 Job includes shifting of mono submersible pump set with allied accessories to pumping station. Providing, fabrication, and fitting of suction pipe line 100mm dia approximately upto 10 meters in length with proper laying, flanging and welding from delivery end of submersible pump set using adapter as per size of pump set upto suction pipe line of HC pumping unit. Providing, fitting and laying of 6mm2 submersible copper cable 3 core from panel installed at pump room upto submersible pump set approximately 50 meters in length with proper thimbling and insulation material and thereafter testing the system. Job also includes providing and fitting of MUG starter of suitable rating to run the system. Complete job includes cost of material, labour charges, hire charges of tools and tackles, transportation etc. |
| 3 | Impregnation / repair / rewinding of 50 HP motor alongwith allied works at pumping station Channi Mansar stage-0 |
| 4 | Repair to 50 hp motor burnt at pumping station Channi Mansar stage-0 by way of decoupling of motor from pump, dismantling of motor. Extraction of rotor and side covers from stator and then shifting upto the workshop, repair to rotor shaft by welding, turning and finishing for exact bearing size making keyways. Fabrication and fitting of sleeves to side covers of motor, welding and patching to side covers. Providing and fitting of bearings by replacing damaged bearings. job also includes Complete rewinding of 50 HP high speed motor and then shifting the same back upto the pumping station. Assembling complete motor coupling with pump making proper alignment and then testing at site. Complete job includes cost of material, shifting / transportation loading / unloading and labour charges. |
| 5 | Repair of 100 KVA and 63 KVA voltage stabilizer alongwith filling of T-oil Channi Mansar stage-0, |
| 6 | Repair of 100 kva voltage stabilizer and 63 kva voltage stabilizer alongwith filling of T-oil at pumping station Channi Mansar stage -0 old and new by way of disconnecting all electrical connections and making temporary arrangement for running the system. Dragging the stabilizer outside the pump room by deploying manual labour and with the help of tools tackles. Unfastening of nuts bolts and opening the top cover and then dismantling of complete unit by way of chain pulley block, tripod stand to draw out 02 no. Coils of 100 kva voltage stablizer and 03 no. Of coils of 63 kva voltage stablizer and shifting to workshop. Replacement of damaged coils with new coils of superior quality copper complete with insulation and varnish and shifting back to site. Replacement of voltmeter, amperemetre, and selector switches -03 nos., complete internal wiring along with Bakelite plate for both the voltage stablizers . Lowering the internal assembly inside the chamber and closing the top cover. Making all incoming and outgoing electrical connections. Job also includes providing and fitting of new Rotary switch-01 no in place of old damage one.Job involves filling of T-oil 200 litres approximately for 100 kva voltage stablizer and 150 litres of T-oil for 63 kva voltage stablizer. Testing the stabilizers on no load at least for 6 hours and then on full load. Complete job includes cost of material, labour charges, hire charges of tools and tackles etc. (complete Job).Rebate if any should be quoted separately. |
| 7 | Providing and fitting of electro mechanical components cables, MCCB, valves, alongwith allied works at Channi Mnasar stage-0, 1st and 2nd |
| 8 | Providing and fitting of electro mechanical components cables,MCCB, valves, along with allied works by way of shifting panel and voltage stablizer to channi mansar stage -0 new P/stn from Channi Mansar stage -0 old then P/F of 35 mm sq copper cable from motor to panel then panel to voltage stabilizer as per site specifications max upto 130 meters to provide safety to panel and voltage stabilizer in case of flood situation. Job aslo includes replacement of 150 mm sq single core aluminium cable with new one approx 60 meters .job covers P/F of 100 mm cast iron sluice valve 02 nos. At channi mansar stage 0 new and 1st new..job also covers replacement of cast iron foot valve 100 mm along with suction pipe at channi mansar stage 0 old,Job also includes P/F of 25 mm sq copper cable from panel to motor and panel to stabizer then upto main switch 40 meters for 5000 x 175 mh hc pump set and also 40 meters copper cable for 4000 gph x 150 mh hc pumpset and 50 mm sq copper cable from motor to panel as per site specifications upto 36 meters for 10000 gphx 250 mh at channi mansard stage 2nd p/stn.job also includes p/f of 250 amp Mccb 50 ka breaking strength at channi mansar stage 0.job also includes making of interconnection of old channi mansar stage 2nd old manifold with chadwa and mahamyaya mandir rising main by way of providing of pipes as per site requirement or max upto 15 meters with 02 no. cast steel sluice valves. Job further includes providing of 01 no. paper ream A4 size for processing of tender documents. Job covers cost of components, equipments and material, transportation charges, manual carriage charges, labour charges, loading /unloading charges, hire charges of tools, tackles, and material handing equipments etc. |
| 9 | Repair to 250 KVA electric transformer alongwith allied works at Channi Mansar stage-0 |
| 10 | Repair to 250 kva electric transformer along with allied works at channi mansar stage -0 by Disconnecting of distribution transformer from HT links and HT / LT side cables, dismounting from poles / platforms using hydra crane / skilled labour.Manual carriage of the distribution transformer upto the nearest motorable road side and shifting to workshop for repairs by using mechanical transportation, manual labour, tools and tackles.Rewinding of core by providing and fitting of new HV leg copper coil(60 kg),Rewinding of core by providing and fitting of new LV leg copper coil (30 kg),Providing and fitting of new core lamination (55 kg),Providing and fitting of new HV,LV bush 03 no.Providing and fitting of fresh transformer oil for topping (90 litres),Heat treatment of repaired transformer.Re-mounting the transformer on poles / Platform with the help of hydra crane / skilled labour, making of LT side cable connections as well as HT side cable connections and checking the transformer on no load and then on full load conditions . Complete job includes cost of material, labour charges, head load carriage charges, hire charges of tools and tackles etc. |
| 11 | Repair to 140 ampere LT control panel alongwith allied works at Channi Mansar stage-1st |
| 12 | Repair to 140 amp lt control panel along with allied works at Channi mansar stage 1st by dismantling all the incoming and outgoing power cables from the panel and shifting to workshop. The job involves replacement of damaged electronic motor protection relay with inbuilt protection of voltage and current related faults,amperemeter,voltmeter, internal control wiring ,volt selector switch, amp selector switch,CT, 140 amp contactor 01 no.,140 amp contactor kit 01 no.,70 amp contactor kit 01 no.,c opper thimbles with new one. Shifting the panel back to site, fitment and testing of the equipment, without load and thereafter on full load. Job includes the cost of material / labour charges,carriage charges, hire charges of tools and tackles etc. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender