| 1 | 936-Additional rate for excavating trench on tarred/concrete surface of specified size. |
| 2 | 934-Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. |
| 3 | C-202223-5546-7-50% additional rate at Night time for 'Additional rate for excavating trench on tarred/concrete surface of specified size.' |
| 4 | 931-Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site. |
| 5 | C-202425-5542-1-50% extra for Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification at night |
| 6 | 113-Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 7 | 952-Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 8 | 992-Cost of construction of foundation, base plates, fixing anchor bots, loading & unloading, handling, erection, allignment and allied works for the installation of Data Aquisition compatible Extensible type Ring Main Units with terminal protector boots & extension modules, actuators for remote operatios, communicable FPIs, CTs, PTs & relay contacts for SCADA, giving power & control wiring and connections, providing terminal protector, interconnecting RMU bus bar and control cables, providing metered LT supply from nearest LT pole, providing earth leads, cable mounting & terminations, giving connections after ascertaing proper phase sequence, providing location name & warning boards, burying cables & refilling, conducting all precommissioning tests as required, complete, except cost of conveyance. RMUs with two nos load break switches & one VCB |
| 9 | C-202223-5546-3-While mounting UG Cables on Poles and other structure, for the protection of part of UG Cable exposed to the public, HDPE pipes will be needed. This can be also used for the crossing of canals. |
| 10 | 991-Cost of construction of foundation, base plates, fixing anchor bots, loading & unloading, handling, erection, allignment and allied works for the installation of Data Aquisition compatible Extensible type Ring Main Units with terminal protector boots & extension modules, actuators for remote operatios, communicable FPIs, CTs, PTs & relay contacts for SCADA, giving power & control wiring and connections, providing terminal protector, interconnecting RMU bus bar and control cables, providing metered LT supply from nearest LT pole, providing earth leads, cable mounting & terminations, giving connections after ascertaing proper phase sequence, providing location name & warning boards, burying cables & refilling, conducting all precommissioning tests as required, complete, except cost of conveyance. RMU Bus Couplers / Add-On units with Load Break switch(s) & Earth switch |
| 11 | 994-Coupling of Busbars |
| 12 | 926-Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). |
| 13 | 929-Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. |
| 14 | 726-Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 15 | 703-Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 16 | 933-Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 17 | C-202223-5546-2-For dismantling, shifting and erection of HT Poles, Transformers and RMUs in city especially in congested and crowded areas, in addition to the labors , mobile cranes will be essential. This is for the safety of the public, properties of public and Board and for the employees. |
| 18 | 728-Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units excluding loading& unloading charges. |
| 19 | 157-Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 20 | 26.2-Dismantling two limbed 11kV RMU (CC,gCCg, B/C, R-T, R-C etc) after disconnecting interpanel busbars (if any), disconnecting cables and packing cable for safety (for lifting), removing cable clamps, bottom plate, removing RMU from foundation bolts,lifting RMU from foundation, unloading to ground/loading to vehicle etc (not including transportation cost) |
| 21 | 26.1-Dismantling single limbed 11kV RMU (C,T,etc) after disconnecting interpanel busbars( if any), disconnecting cables and packing cable for safety (for lifting), removing cable clamps, bottom plate, removing RMU from foundation bolts,lifting RMU from foundation, unloading to ground/loading to vehicle etc not including transportation cost) |
| 22 | 1135-Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 23 | 170-Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 24 | 363-Drilling hole of various sizes on existing Channel/Cross Arm. |
| 25 | 27.11-Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 26 | 937-Dismantling the faulty cable end from the structure/pole after disconnecting 11kV jumper connections and mounting the same after redoing End termination and giving jumper connections. (excluding end termination). |
| 27 | 11010-Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 150+ 1 x 120 sqmm with bare insulated Messenger |
| 28 | 11080-Dismantling one suspension clamp from 11 KV ABC |
| 29 | 11070-Dismantling one Anchor clamp /dead end clamp from 11 KV ABC |
| 30 | 501-Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 31 | 503-Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 32 | 505-Dismantling one damaged 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 33 | 516-Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 34 | 519-Dismantling one damaged AB switch from existing structure and bringing back to section store. |
| 35 | 518-Dismantling one HT pin insulator with pin and bring back to section store. |
| 36 | 513-Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 37 | 1107-Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 38 | 1101-Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles Please Enable Macros to View BoQ information |