| 1 | Dismantling the old Control Board by S/F of New Microprocessor Based full Collective Elevator Control Panels close loop type, with floor position voice announcing system Suitable for V3F Drive control unit. |
| 2 | Nessesary floor sensing reed switches with existing switches on car top With required cam & bracket each floor and U/D Direction and final limit switches with Operating arrangement. |
| 3 | Dismantling the existing wiring with necy. rewiring the same in M/S traffing by PVC Copper wire complete from machine Room to all landing gate ,sensing switches, Push & pit switch etc. incl. proper Earthing. |
| 4 | S/F of Car Operating Panel (COP) With illuminative push button , Large U/D Arrow & Floor Digital Display. |
| 5 | S/F of Hall Button unit incl. Large UP & DOWN Arrow & Floor Position Digital Display. |
| 6 | Supplying & installation VVVF Drive unit With necessary wiring for controlling Speed during starting &stopping. 7.5KW(MONARCH or YASKAWA)Make V3F Drive with D/Braking Resistor. |
| 7 | Supply & installed Automatic Rescue Device (ARD) with necy. wiring and floor sensing system For, In case of a main power supply failure,the lift stopped between two floors is moved to floor level the automatic and passenger are out safely. |
| 8 | Elevator Overlod Measurement System LOAD CELL. Multi Rope Type. Automatic Calibration using the Wire Rope Diameter. ( 1:1 Roped.10 mm. dia, 4 nos. Rope.) |
| 9 | Suspending the cage & Counter Weight for dismantling the damaged Main steel wire rope , supply & fixing Steel wire rope. 35 Mtr. X 4 Length (10mm Dia) (Make Usha Martin)Total= 140Mtr. |
| 10 | Car & landing door unit proper repairing including replacement of necy. Damaged moving Spare & painting the door. Door operating belt in the Car Gate Header replacement etc. (9 Nos gate) |
| 11 | Dismantling out dated machanical Auto door sensor unit and S/F Auto Door photo sensore system. |
| 12 | Dismantling the Main SHEAVE by hydraulic press and S/F New 10mm Rope/ 4 Groove Main SHEAVE (Cast Iron Grade 20, 10HP Machine ) by hydraulic press with proper position.Dismantling the Main SHEAVE by hydraulic press and S/F New 10mm Rope/ 4 Groove Main SHEAVE (Cast Iron Grade 20, 10HP Machine ) by hydraulic press with proper position. |
| 13 | Top up the proper grade synthetic gear oil. |
| 14 | Cleaning & allyning the Guide-bracket for Car & C.W with nessesary additional bracket provide for above guide rail allyinment for proper DBG. |
| 15 | Car body painting and S/F light(6nos. Spot light), incl, repairing flooring & replaceing MS false ceiling. |
| 16 | Testing and commissioning of the whole lift before put into operation. |
| 17 | Less cost for existing Lift Please Enable Macros to View BoQ information |