| 1 | Supply of all materials, labour & T&P etc. and construct the following works as per type design and drawings complete |
| 2 | Intake Chamber Cum Roughening Filter ( 600 mm X 600 mm) |
| 3 | Supply, Laying, Jointing, Fixing and Testing of G. I. (M) and MSERW grade Yst 210 pipe with specials and fiting in trenches under ground including cutting,Laying and Jointing by welding etc complete |
| 4 | 15 mm dia |
| 5 | 25 mm dia |
| 6 | 32 mm dia |
| 7 | 40 mm dia |
| 8 | 50 mm dia 4.4 mm Thick MSERW Pipe |
| 9 | Excavation of earth for pipe line in trenches with lift up to 1.50 M. & lead up to 30 M. including refilling, watering, ramming, of excavated earth into the trenches and removal of surplus and removal of surplus earth up to a distance of 60 M. form trenches including supply of labour, T&P etc. all complete (Assuming that 80% pipe line is laid in trenches. It is estimated that 90% excavation will be in soil mixed with shingle bajri & boulders and 10% will be in medium rocks. |
| 10 | Soil mixed with boulders & bajri |
| 11 | Medium rocks |
| 12 | Supply of all meterials, labour, T&P and construct R.C.C. C.W.R. as per drawing including cost of all pipes and fittings all complete |
| 13 | 25.00 KL cap. |
| 14 | 35.00 KL cap. |
| 15 | Supply and fixing of the following fittings including cartage of materials, labour, T&P etc. complete :- |
| 16 | 25 mm dia |
| 17 | 32 mm dia |
| 18 | 40 mm dia |
| 19 | 50 mm dia |
| 20 | AIR VALVE 20 mm dia |
| 21 | Making New House Connection. |
| 22 | Providing and fixing bib cock |
| 23 | Provision for Cutting of road surface for laying of pipe line including supply of all material, labour, T&P etc. complete .average breadth 70 cm. to pay other Deptt. (C.C. Khharinja) |
| 24 | Reinstatement of Road(making payment to PWD/Irrigation and other department) C.C. Khharinja |
| 25 | Supply of all materials, labour, T&P etc. and construct wheel chambers as per type design (0.60x0.60x0.75m) |
| 26 | Supply of all materials, labour, T&P etc. and construct Air valve chambers as per type design (0.45x0.45x0.45m) |
| 27 | Supply of all materials, labour, T&P etc. and construct Febricated Panal Room as per type design (3.00x3.00x3.00m) |
| 28 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. |
| 29 | Hot finished welded type tubes |
| 30 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as requiredcomplete as per the direction of Engineer-in-charge. |
| 31 | Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade |
| 32 | Excavation of earth for foundation of Pillers |
| 33 | P.C.C 1:4:8 with cement and sand , 40mm stone grit including supply all material, labour T&P etc.complete. |
| 34 | Random Rubble stone masonary in 1:6 cement and sand mortar including supply of all materials, labour, T&P etc. complete. |
| 35 | P.C.C 1:2:4 with cement and sand ,20 mm stone grit including supply all material, labour T&P etc.complete. |
| 36 | RR laid dry Stone masonary |
| 37 | Solar Submarsible AC pump set to deliver 100 LPM discharge at 300 Mtrs. Head, 20 HP 380 VAC, 50 Hz, 3 phase with 3 mtrs cable and Controller complete in all respect. ( one set for spare) |
| 38 | Solar pump controller panel ( VFD cum starter) Dual power (Both AC/DC) Suitable for above submersible pump set as following. (One no. as spare at each stage) |
| 39 | Inbuilt MMPT tracking facility ensuing over load, under voltage protection force air cooled inverse exponential shut down at the time of low radiation. |
| 40 | Parameter display facilities. |
| 41 | Dry run protection to avoid dry run of pump set. |
| 42 | Manual / auto run slector switch on panel box |
| 43 | Auto reset after every fault and on / off feature depending of water level in tank by sensor based float switch. |
| 44 | SITC of IOT based intillligent electronic flow meter 50 mm size complete with clamp etc. |
| 45 | Float switch with control wire. ( for tank empty and full) |
| 46 | Supply of solar DC wire 6 sq. mm X 1 core, copper conductor, PVC insulated. |
| 47 | Jointing material and other fittings |
| 48 | Supply of Submersible cable 10 sq. mm X 3 core, copper conductor, PVC insulated |
| 49 | Solar photo voltic mono crystalline solar module/PV Panel array 540/ 550 watt each requried for operatrion of pump. |
| 50 | Hot deep galvanized Pole mounted steel Structure of adequate strength and appropriate design, which can withstand load of modules and high wind velocities up to 150 km per hour and height of the panels from ground level minimum 3 meter. |
| 51 | Construction of CC foundation / base for mounting structure with all consumable material ie. Cement, concret, sand, iron bar etc. |
| 52 | Angle iron frame and wiremess type fencing of SPV Panels complete with C.C foundation. |
| 53 | Lightning arrestor with pole, copper strip, copper plate earthing complete in all respect. |
| 54 | Copper /chemical earthing of all PV modules mounting structures including copper strip, copper plate earthing complete in all respect as per direction engineer incharge. |
| 55 | Pipe fitting with 50 mm dia size GI pipe, Gate valve, Reflex valve, GI union, elbow, nipple, Tee etc complete as required at site. |
| 56 | Installation, testing & commissioning of all above supplied Items |
| 57 | Watch and ward of this solar pumping scheme for 12 months during stabilization Please Enable Macros to View BoQ information |