| 1 | A)MRL03-T03 Km 8th to Tilsara, JK02-3018 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shaftwells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres |
| 3 | Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 8 | (B)T02-T01 Km 8th to Karapora-chirpora,JK02-3020 |
| 9 | RWall:-Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. |
| 10 | Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) |
| 11 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: 7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 12 | Dry random rubble masonry with hard stone in foundation and plinth source to site of work with all leads, lifts, loading, unloading, and octori.(Finished work to be measured). |
| 13 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 ( Pmgsy 12.10) |
| 14 | Providing PCC M20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification cl 615,710 & 1204.3.11 |
| 15 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) 13.42.1 Flush/Ruled Pointing |
| 16 | Slab of Causeway |
| 17 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 18 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level HYSD |
| 19 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 20 | (C)T01-Kanidajan to Nagam JK02-3008 |
| 21 | PCC WALL |
| 22 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected |
| 23 | Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) |
| 24 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 25 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 26 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 27 | RRM Wall |
| 28 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed |
| 29 | Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) |
| 30 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: 7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 31 | Dry random rubble masonry with hard stone in foundation and plinth source to site of work with all leads, lifts, loading, unloading, and octori.(Finished work to be measured). |
| 32 | Backfilling (Granular Material) behind abutment, wing wall and return wall complete as per drawings & technical specification |
| 33 | Providing PCC M20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification cl 615,710 & 1204.3.11 |
| 34 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) 13.42.1 Flush/Ruled Pointing Please Enable Macros to View BoQ information |