| 1 | Erection and Fabrication Work B 1 | Juice/water scale ke weight channel bed mein se gale/kamzor channel ko kaatkar hatana. poorvanusar naya banakar lagana evam trial dena. |
| 2 | Erection and Fabrication Work B 2 | Juice weighing scale ke filling tank ke rods ki kamzor/gali guides ko naya banakar lagana. |
| 3 | Erection and Fabrication Work B 3 | Juice. maceration water evam final molasses ke weighing scale tank ke gale/kamzor bottom cone ko kaatkar purane anusar naya bottom cone lagana va poorn trial dena. |
| 4 | Erection and Fabrication Work B 4 | Juice weighing system ke measured juice receiving tank ki gali/kamzor bottom evam side plates ko kaatkar hatana evam nirdeshanusar purani/nai plate lagakar leak.proof trial dena. |
| 5 | Erection and Fabrication Work B 5 | Raw juice pump par lage catcher ko kaatkar hatana tatha naya catcher fabricate kar yathasthan lagakar samast connection poorv ki bhanti karna evam leak.proof trial dena. |
| 6 | Erection and Fabrication Work B 6 | Pan. quad body evam vapour line juice heaters ki hydraulic testing ke liye inlet evam outlet ke vapour pipes mein cutting karke plate ke blind weld karna tatha hydraulic uparant blind kaatkar hatana evam vapour pipe ko punah andar va bahar se leak.proof weld karna. |
| 7 | Erection and Fabrication Work B 7 | Semi Kestner. vapour cell. quad body juice heater. vapour line juice heater ke condensate bottles tatha syrup receiving bottles ke cells ko kaatkar ceiling baffle plate ke kamzor hisse. bottom plate ke kamzor hisse athva cell ke kamzor hisse ko badalkar condensate bottles/syrup receiving bottles ki vanchhit marammat kar jal bharav parikshan dena. |
| 8 | Erection and Fabrication Work B 8 | Juice heater mein lage ayatakaar juice entry box ko dismantle karna. gale/kamzor charon nipples badalna. double beat valves ki fitting hetu dono flanges lagana. box ki marammat kar box fit karna evam double beat valve fit karke leak.proof parikshan dena. |
| 9 | Erection and Fabrication Work B 9 | Sabhi juice heaters ki gali hui sampoorn partition plate ko kaatkar bahar nikalna va nai 8/10 mm plate lagakar gili hui ring ko leak.proof welding karna tatha lagi hui tubes ko bachakar santoshjanak trial dena. |
| 10 | Erection and Fabrication Work B 10 | Juice heaters mein dono taraf partition plate ki kamzor M.S. strip ko dismantle karna. kate face par grinding kar nai 25 mm x 5 mm ki M.S. strip banakar lagana evam rubber fit karna. |
| 11 | Erection and Fabrication Work B 11 | Juice sulphiter ke recovery tower ke gale/kamzor bottom cone ko kaatkar 10/12 mm moti M.S. plate se sample anusar naya cone fabricate kar yathasthan fit kar leak.proof welding karna. |
| 12 | Erection and Fabrication Work B 12 | Juice sulphiter ke base ke charon side ke gale/kamzor horizontal beams ki vanchhit strengthening hetu unke andar 12 mm moti plate lagakar majbooti pradan karna. |
| 13 | Erection and Fabrication Work B 13 | Juice/syrup sulphiter ke kamzor bottom cones evam top cones ko dismantle kar sample anusar naya banakar fit karna. tatha andar va bahar se leak.proof welding kar santoshjanak jal bharav evam trial dena. |
| 14 | Erection and Fabrication Work B 14 | Syrup sulphiter ke tower ki gali/kamzor baffle plates/jaliyon ko bahar nikalna. vanchhit marammat kar yathasthan fit kar leak.proof trial dena. |
| 15 | Erection and Fabrication Work B 15 | Syrup pump se syrup sulphiter tak dono pumps ki delivery ki dono lines ko neeche utarkar garam karke. bhali bhanti safai karna. gali hui pipe line badalkar valve. bend. nipple ityadi lagakar punah lines ko fit karna evam leak.proof trial dena. |
| 16 | Erection and Fabrication Work B 16 | Syrup/juice sulphiter ke upar lage recovery tower ko utarkar gali shell ko nirdeshanusar nai/purani plate se shell taiyar kar fit karna evam tower ko punah yathasthan lagakar leak.proof trial dena. |
| 17 | Erection and Fabrication Work B 17 | Juice/syrup sulphiter/clarifier ke kamzor shell ke kamzor bhag ko kaatkar hatana. nirdeshanusar nai/purani 10/12 mm plate se banakar yathasthan lagakar andar va bahar se leak.proof welding kar trial dena. |
| 18 | Erection and Fabrication Work B 18 | Sulphur bhatti (juice/syrup) ke gale/kamzor secondary gas cooler ko kaatkar hatana. 10/12 mm moti plate se purane ke anusar naya cooler fabricate kar yathasthan fit kar samast connection poorv ki bhanti kar leak.proof gas trial dena. |
| 19 | Erection and Fabrication Work B 19 | Sulphur bhatti station par juice/syrup hetu sthapit sulphur bhattiyon ke gas coolers ke gale/kamzor cooling pipes ko kaatkar hatana. purane anusar naye pipes taiyar kar poorv ki bhanti fit kar leak.proof trial dena. |
| 20 | Erection and Fabrication Work B 20 | Sulphur bhattiyon ke gale gas headers ko kaatkar hatana. purane anusar naye headers taiyar kar lagana. |
| 21 | Erection and Fabrication Work B 21 | Sulphur bhattiyon ke gale/kamzor sulphur melters ko dismantle kar hatana. sample anusar naya taiyar kar yathasthan lagana evam samast connection kar santoshjanak leak.proof trial dena. |
| 22 | Erection and Fabrication Work B 22 | Sulphur furnaces ke gale/kamzor after burner ko hatana. sample anusar naya fabricate kar yathasthan erection kar trial dena. |
| 23 | Erection and Fabrication Work B 23 | Sulphur furnace par lagi kamzor/gali water jacket ko repair/badal kar leak.proof water trial dena. |
| 24 | Erection and Fabrication Work B 24 | Juice clarifier ke pratham compartment ki kamzor 10 mm M.S. evam intermediate bottom trough ko kaatkar hatana. kramashah 10 mm M.S. evam 6 mm ki nai plate se segment taiyar kar poorv ki bhanti intermediate bottom fit kar mud boot evam cell ke saath leak.proof weld karna. neeche se T.iron/angle iron se strengthening hetu support lagana evam leak.proof trial dena. |
| 25 | Erection and Fabrication Work B 25 | Juice clarifier ke gale/kamzor juice box ko dismantle kar purane anusar may fabricate kar yathasthan fit karna. valve va spindle ko theek kar lagana evam trial dena. |
| 26 | Erection and Fabrication Work B 26 | Juice clarifier ke purane kamzor mud boots ko kaatkar hatana. naye banakar lagana tatha arms ityadi weld karna. |
| 27 | Erection and Fabrication Work B 27 | Juice clarifier ki bottom plate ko kaatkar hatana. uske sthan par nai 10 mm ki plate se banakar lagana evam bottom ke neeche angle channel lagakar support banakar lagana. |
| 28 | Erection and Fabrication Work B 28 | Clarifier ki coil ko dismantle kar neeche utarna. phir uski safai karna tatha gale huye flange/pipe ko badalkar coil banakar fit karna tatha profile ke anusar hole karna. |
| 29 | Erection and Fabrication Work B 29 | Clarifier mein mud scraper ki gali plate ko kaatkar hatana. nai plate banakar lagana evam scraper ko fit karna tatha trial dena. |
| 30 | Erection and Fabrication Work B 30 | Clarifier mein mud scraper ke kamzor pipe dismantle karke naye pipe lagana aur usmein mud scraper lagana. |
| 31 | Erection and Fabrication Work B 31 | 800/900 mm dia ke rubber seated type angle valve ko nirdeshanusar is mill mein sthapit quad. semi.kestner evam vapour cell ki steam/vapour line mein lagakar fit karna evam leak.proof trial dena. |
| 32 | Erection and Fabrication Work B 32 | Quad body ki complete retubing karne ke liye calandria ke bottom saucer ko kaatkar neeche karna. tubes ke fit ho jaane par calandria ki hydraulic testing ke uparant bottom saucer ko andar aur bahar se leak.proof weld kar water evam vacuum trial dena. |
| 33 | Erection and Fabrication Work B 33 | Semi.kestner/vapour cell/quad body/pans ki gali va kamzor vapour/exhaust steam lines ko dismantle karna. 8.0/10.0 mm moti M.S. plate se purane anusar nai line fabricate kar nai line erection kar leak.proof welding karna. safal water evam steam trial dena. |
| 34 | Erection and Fabrication Work B 34 | Quad bodies mein gale/kamzor juice distributor/down take pipe ko kaatkar hatana tatha naya banakar lagana. |
| 35 | Erection and Fabrication Work B 35 | Pan. door. sulphur furnace. quad bodies cell evam bottom saucer mein lage manholes mein se gale/kamzor manhole ko kaatkar purane anusar naya manhole banakar lagana. |
| 36 | Erection and Fabrication Work B 36 | Semi.kestner/vapour cell/quad bodies evam pans ke gale/kamzor umbrella ko dismantle kar hatana tatha purane anusar naya umbrella fabricate kar avashyak support lagakar umbrella ka erection karna. |
| 37 | Erection and Fabrication Work B 37 | Pan evam quad ke vapour pipes mein bahar se majbooti pradan karne ke liye 900 se 1100 dia ki M.S. plate athva angle iron ki T.rings banakar lagana. |
| 38 | Erection and Fabrication Work B 38 | Quad bodies ki gali/kamzor ammonia gas headers ko kaatkar hatana. naye header taiyar kar erection karna. nipple. valve. flange adi ko lagakar leak.proof trial dena. |
| 39 | Erection and Fabrication Work B 39 | Semi.kestner. vapour cell. quad body ki kamzor shell ko hatana. poorvanusar naya fabricate kar yathasthan erection kar leak.proof trial dena |
| 40 | Erection and Fabrication Work B 40 | Evaporator par quad bodies ke madhya lagi kamzor vapour pipe ko dismantling karke nai/purani plate se nai vapour pipe 600. 700. 800 mm dia ki banakar lagana aur leak.proof welding kar water trial dena. |
| 41 | Erection and Fabrication Work B 41 | Evaporator evam pans ke vapour pipe mein lage leaky/kamzor external catcher ko kaatkar hatana. sample anusar may internals sahit taiyar kar yathasthan fit kar leak.proof welding karna evam safal water filling/vacuum trial dena. |
| 42 | Erection and Fabrication Work B 42 | Evaporator evam pans ke vapour pipe mein lage external catcher mein lagi top plate ko hatakar kamzor internal/cone/shell adi ki vanchhit marammat karna. punah top plate lagana evam leak.proof welding kar safal water filling/vacuum trial dena. |
| 43 | Erection and Fabrication Work B 43 | 10Inch x 20Inch size ke vacuum filter ke gale/kamzor agitator ko kaatkar hatana evam purane anusar naya banakar yathasthan fit karna evam safal trial dena. |
| 44 | Erection and Fabrication Work B 44 | 8Inch x 16Inch size ke vacuum filter ke gale/kamzor agitator ko kaatkar hatana. purane anusar naya banana. yathasthan fit karna evam safal trial dena. |
| 45 | Erection and Fabrication Work B 45 | Vacuum filter ki gali/kamzor mud tray ko kaatkar hatana. nai/purani plate se mud tray taiyar kar yathasthan fit karna. vacuum filter ki side ki gali/kamzor plate badalkar santoshjanak water trial dena. |
| 46 | Erection and Fabrication Work B 46 | 10Inch x 20Inch size ke vacuum filter ke gale/kamzor agitator ke bhag ko kaatkar hatana evam purane anusar vanchhit marammat karna. |
| 47 | Erection and Fabrication Work B 47 | 40 ton kshamata ke pan ke kamzor taper cone ko kaatkar hatana. sample anusar nai 12/16 mm plate se taiyar kar lagana. Samast connection poorv ki bhanti karna evam leak.proof welding karna tatha safal water filling evam vacuum trial dena. |
| 48 | Erection and Fabrication Work B 48 | 8Inch x 16Inch size ke vacuum filter ke gale/kamzor agitator ke bhag ko kaatkar hatana evam purane anusar vanchhit marammat karna. |
| 49 | Erection and Fabrication Work B 49 | Vacuum filter station par sthapit bagassilo cyclone ko dismantle karke gale bhagon ko badalkar vanchhit marammat kar yathasthan fit kar sabhi connection poorv ki bhanti karna. |
| 50 | Erection and Fabrication Work B 50 | Mud mixer ki gali/kamzor shell ko kaatkar hatana evam nai/purani plate se shell fabricate kar yathasthan lagana evam safal trial dena. |
| 51 | Erection and Fabrication Work B 51 | Mud conveyor belts ke discharge end par lage mud discharge chutes mein se gale/kamzor chutes ko kaatkar hatana. purani plate se poorvanusar banakar lagana evam trial dena. |
| 52 | Erection and Fabrication Work B 52 | Vacuum filters ke gale/kamzor condensers bottle ko dismantle kar utarna. sample anusar naya banakar lagana evam safal vacuum trial dena. |
| 53 | Erection and Fabrication Work B 53 | Boiling house mein gale/kamzor pumps ke foundation bolts/bed ko hatakar channel ke naye bed banana. civil dwara diye gaye gaddhon mein naye foundation bolts dalkar channel ke naye bed banana. pump evam motor ko rakhkar sambandhit connection evam alignment kar santoshjanak trial dena. |
| 54 | Erection and Fabrication Work B 54 | SO2 gas lines ko support dene ke liye purane M.S. pipe se support lagana. |