| 1 | Construction of New Anganwadi Baby Friendly Toilet at Eraiyur-patti Street Anganwadi Centre in Eraiyur panchayat |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 4 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 5 | RCC in 1:1.5:3 mix using 20mm size HBG metal excluding cost of reinforcement and cost of mixing, laying, curing, finishing etc.complete |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 7 | Suppplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams Roof Slabs Stailcase steps bed blocks , critical pier etc |
| 8 | Supply and Fabrication of Steel including cost of steel to site and all labour charges for Straightrnening ,cutting to length to ,bending to shape and tying in position and forming grills for all RCC Work |
| 9 | Towards cost and Supply of jolly includig all Charges etc |
| 10 | Towards cost and Supply of PVC Door including all Charges |
| 11 | Provision For EWC |
| 12 | Provison For RCC Ring and Cover Slab For Leach Pit |
| 13 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete. |
| 14 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with |
| 15 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at th |
| 16 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete). The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2023-24) |
| 17 | Colour washing with best shell lime two coats of approved colour pigment including cost and conveyance etc., complete |
| 18 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |