|
| 1 | Geophysical survey charges |
| 2 | Labour Charges for erection of Horizontalshaft, centrifugal pumpset (Coupled/Monoblock) in bore well/Open well includingfixing of suction pipe and foot valve upto amaximum depth of 7 metres and deliverypipes to the required length with valves,pressure gauges upto the exterior wall ofpump room and erection of panel boardconsisting of TPIC switches starter, Voltmeter,Ammeter, Capacitor single phasing preventorand laying and jointing the cables and twinearthing as per IE rules including providingbed blocks etc., complete and operating thepumps and trial run for 10 days includingsigning of completion of reports as requiredby EB authorities. |
| 3 | Supply and fixing of 180 mm dia PVC casing pipe |
| 4 | Labour charges for inserting PVC casing pipes assembly in the drilled hole including jointing pipe etc. competed as directed by the Departmental officer |
| 5 | Earthwork excavation in all soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm. thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification. |
| 6 | Cement concrete with hard broken granite stone jelly using 40mm gauge in cement concrete 1:4:8 (One cement four sand and eight aggregate) for foundation including cost and conveyance of all materials and all other incidental charges etc., complete complying with standard specifications. |
| 7 | Brick work in Cement mortar 1:5 mix (One cement and five sand using lInd class chamber bricks of size 9\\"x 4 3/8 x 2 3/4 including cost of all materials and labour charges etc., complete as per standard specification |
| 8 | Plastering with cement mortar 1:5 (One cement five sand) 12 mm thick includingfinishing the surface cost andconveyance of all materials mixing curing and all other incidental charges etc., complete complying with standard specification |
| 9 | Plastering with cement mortar 1:4 (One cement four sand) 20 mm thick includingfinishing the surface cost andconveyance of all materials mixing curing and all other incidental charges etc., complete complying with standard specification |
| 10 | Dadooing Walls with glazed tiles of size 20Cmx15 Cmx6mm thick laid is cm 1:3 mix 10 mm thick and pointing with white cement 0.40 Kg/M2 including finishing the joints and pointing flush with tiles surface etc., complete as per standard specifications. |
| 11 | Supply and delivery of following GI pipe and specials |
| 12 | Kitty set |
| 13 | Bore cover |
| 14 | 32 Amps Fuse carrier |
| 15 | Main switch |
| 16 | HDPE Tank |
| 17 | 25 mm GI Tee |
| 18 | 25 mm tank nipple |
| 19 | Supply and Fixing of 50mm thick Cudappa Slab |
| 20 | Supply and fixing of 2 HP compressor with motar ISI standard specification including cost of materials and fixing charges etc., |
| 21 | 15 mm GI pipe |
| 22 | 25 mm GI pipe |
| 23 | 32 mm dia GI pipe |
| 24 | 32 mm HDPE hose pipe |
| 25 | 4 x 4 sq mm flat cable |
| 26 | 32 mm dia GI elbow |
| 27 | 32 mm dia GI union |
| 28 | 32 mm brass valve |
| 29 | 25 mm GI elbow |
| 30 | 25 x 20 mm GI elbow |
| 31 | 20 mm brass valve |
| 32 | 20 mm hex nipple |
| 33 | 32 mm hex nipple |
| 34 | Nylon rope |
| 35 | 25 mm HDPE hose |
| 36 | 20mm HDPE hose |
| 37 | 25 mm dia gate valve |
| 38 | 32 mm dia gate valve |
| 39 | 15 mm dia gate valve |
| 40 | 110 mm dia End cap |
| 41 | Supply and delivery of clear water vertical wet type submersible pump conforming to IS8034/2002 and as amended thereafter and BEE 3 Star Rated capable of discharging noted LPM against head of water column due to all causes. The pump shall be with stainless steel shaft and dynamically balanced bronze or Cast SS impeller, brass screws and CI FG 200 grade pump bowl/diffuser with ISI mark. The pump shall be directly coupled to a continuos rated two pole suitable wet type vertical squirrel cage induction motor suitable for operation in AC single phase 230 V+/- 10 %,50 HZ +/-5 % etc complete as directed by departmental officers. Please Enable Macros to View BoQ information |