| 1 | LABOUR |
| 2 | (128) Additional rate for excavation of one Pitfor HT Pole/HT Stay in Hard Laterite. |
| 3 | (127) Additional rate for excavation of one Pitfor HT Pole/HT Stay in Laterite. |
| 4 | (325) Additional rate for reinstalling LT lineon the renewed 11kV pole having bothHT and LT (HT/LT) lines. |
| 5 | (952) Providing concrete muffing of size0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 6 | (703) Labour charges for loading HT A typepole from the stacking place andunloading the same at work site(transportation by any vehicle). |
| 7 | (726) Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4numbers of poles excluding loading&unloading charges. |
| 8 | (113) Fitting and erecting one HT A typeSingle Pole in position, including fittingcross arm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 9 | (116) Fitting and erecting one HT Double PoleStructure using PSC pole in positionincluding fitting 2 channel cross arms,digging and back filling pit in ordinarysoil, drawing sufficient length of GIearthing leads through all cross arms tothe ground for earthing (excludingprovision of earthing). |
| 10 | (117) Fitting and erecting one HT Double Pole including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). Structure using A type pole in position |
| 11 | (163) Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit(0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinarysoil & backfilling. |
| 12 | (167) Fitting one set AB switch on existingDP, giving connection and drawingsufficient length of GI earthing leads tothe ground for earthing, excludingprovision of earthing. |
| 13 | (610) Dismantling one ordinary streetlight/CFL/LED fitting from existing poleand refitting the same on newly erectedpole including disconnecting andreconnecting wires. |
| 14 | (172) Fitting one Additional 2.4/3m Channelcross arm (75x40x6mm), in existing11kV DP including conveyance ofmaterials. |
| 15 | (677) Cutting trees having girth beyond 60cmbut upto and including 120cm (fellingtrees including cutting of trunks andbranches) and removing the rootcompletely and stacking etc. 1 No. |
| 16 | (112) Fitting and erecting one HT PSC SinglePole in position, including fitting crossarm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 17 | (702) Labour charges for loading HT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 18 | (363) Drilling hole of various sizes on existingChannel/Cross Arm. |
| 19 | (365) Cutting Channel/Cross Arm/Angle Ironinto two pieces. |
| 20 | (420) Transferring LT three phase 4/5 wire OHline to newly erected HT/LT poleincluding dismantling existing cross armand insulators, refitting the same on thenew pole, binding etc. complete. |
| 21 | (451) Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 22 | (452) Disconnecting and lowering down thethree phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 23 | (221) Fitting one No. Section fuse on LT linewith dropping cables, crimping sockets,connecting with bolt & nut etc. |
| 24 | (119) Fitting and providing one HT Stay for11kV pole, including digging and backfilling pit in ordinary soil. |
| 25 | (157) Providing one Earth using GI earth pipeof size 38.1mm dia, 2.5m lengthincluding digging separate pit(0.45x0.45x2.5m) at a minimumdistance of 1.5m away from thepole/structure and maintaining standarddistance between different earth pipes inordinary soil & backfilling. |
| 26 | (170) Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single poleincluding conveyance of materials. |
| 27 | (676) Cutting trees having girth beyond 30cmbut upto and including 60cm (fellingtrees including cutting of trunks andbranches) and removing the rootcompletely and stacking etc. 1 No. |
| 28 | (568) Dismantling one section fuse fromstructure and bringing back to sectionstore. |
| 29 | (513) Dismantling (without damage) one km11kV line (three conductors) includingdismantling cross arm, insulators, disc,disconnecting jumper connection, rollingthe conductor and stacking the materials. |
| 30 | (1109) Erection of Anchor clamp / dead endclamp for LT ABC of any size |
| 31 | (1110) Erection of suspension clamp for LTABC of any size |
| 32 | (164) Fitting one set (3No.) 11kV LA andgiving connections excluding earthing. |
| 33 | (125) Insertion of one HT A type pole inexisting OH line including digging &backfilling pit in ordinary soil, fittingcross arm, insulators, binding etc.,drawing sufficient length of GI earthleads to the ground for earthing(excluding provision of earthing). |
| 34 | (503) Dismantling one damaged 11kVPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stackingthe same. |
| 35 | (501) Dismantling one damaged 11kVTW/RSJ/Rail pole after disconnectingstays, strut etc. attached thereon andstacking the same. |
| 36 | (C-202223-5691-4) Stringing of 11KV, 99sqmm, XLPEcovered conductor including fitting of allaccessories, providing end terminations,midspan joints, pipe earthing, installinginsulated piercing connectors etc. |
| 37 | Total of BoQ1 Please Enable Macros to View BoQ information |