|
| 1 | Stringing of 11KV, 99sqmm, XLPE covered conductor including fitting of all accessories, providing end terminations, midspan joints, pipe earthing, installing insulated piercing connectors etc. |
| 2 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 3 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 4 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 5 | Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 6 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 7 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 8 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 9 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 10 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 11 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 12 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 13 | Renewal of existing damaged/old 11kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all items and conveyance of all materials. |
| 14 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 15 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 16 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 17 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 18 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 19 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 20 | Erection of suspension clamp for LT ABC of any size |
| 21 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 22 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 23 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. Please Enable Macros to View BoQ information |