|
| 1 | Demolishing stone rubble masonry manually/by mechanical meansincluding stacking of serviceable material and disposal of unserviceablematerial within 50 meters lead as per direction of Engineer-in-charge: In cement mortar |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) incl. all leads, lifts & carriage of material by MT/ H.L. |
| 3 | Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level andcuring complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah |
| 4 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete: |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 6 | Hand packing stones in wire crates including the cost of stones and cost of crates. |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including material , labour all leads , lifts and carriage of material by MT/HL. |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 9 | Duping stone including cost of stones in Horizontal on level |
| 10 | Centring and shuttering including strutting propping etc and removal of form work Foundations, footings, bases of columns etc. for mass concrete |
| 11 | JCB engaged for Diverting of water/dewatering/perparing temporary passage. |
| 12 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge |
| 13 | Providing and applying tack coat using hot straight run bitumen ofgrade – VG-30, including heating the bitumen, spraying the bitumenwith mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm. |
| 14 | Providing and applying tack coat using hot straight run bitumen ofgrade – VG-30, including heating the bitumen, spraying the bitumenwith mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.50 Kg/sqm. |
| 15 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen ofgrade VG-30 @ 3.5% (percentage by weight of total mix) prepared inDrum Type Hot Mix Plant of 60-90 TPH capacity |
| 16 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification,complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. |
| 17 | carriages of materials by mechinical trancsport incl. loading, unloading and stacking complete |
| 18 | Sand for a lead of 27 kms. |
| 19 | stone agg below 40mm 35 kms |
| 20 | stone agg 40 mm an above 35 kms |
| 21 | Stone boulder for an avg lead of 25 kms |
| 22 | Disposal of Mulba from site to designated location. In radius of 3 km Please Enable Macros to View BoQ information |