| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres in All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% stone boulder |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) .20% boulder |
| 5 | Dumping stone including cost of stones. in Horizontal on level |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 7 | Centring and shuttering including strutting propping etc and removal of form work |
| 8 | Foundations, footings, bases of columns etc. for mass concrete |
| 9 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 10 | Hand packing stones in wire - crates including cost of crates and stones |
| 11 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 900 mm dia. R.C.C. pipe |
| 12 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in theproportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 450 mm dia. R.C.C. pipe |
| 13 | In ordinary soils disposal lead upto 50 m and lift upto 1.5 m |
| 14 | Providing , laying, spreading and compacting crushed stone aggregate of 63 mm to 45 mm sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming of 13.2 mm nominal size (Type - A) screening/binding material as stone dust to fill up interstices of coarse aggregate, watering and compacting to the required density, finished work to be measured including all leads, lifts and carriage of material by MT/ H.L. (conforming to clause 404 of MORT&H specifications). |
| 15 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge |
| 16 | Providing and laying 50 mm thick Bituminous Macadam compacted thickness with bitumen of grade VG-30 @3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity using crushed stone agg. of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment & rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density including tack coat @ 0.75 kg/sqm complete as per specifications and directions of Engineer-in-Charge. |
| 17 | Providing and laying 25 mm Thick Semi- Dense Bituminous Concrete compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification including tack coat @ 0.50 kg/sqm on BT surface complete and as per directions of Engineer-in-Charge. |
| 18 | Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work. |
| 19 | carriages of materials by mechinical transport incl. loading, unloading and stacking complete. |
| 20 | Sand avg lead of 22 km |
| 21 | stone agg below 40 mm nominal size for an lead of 22 kms |
| 22 | stone agg above 40 mm nominal size for an lead of 22 kms |
| 23 | Stone boulder average lead of 6 km |
| 24 | Disposal of Surplus for an lead of 1 kms Please Enable Macros to View BoQ information |