| 1 | Stage Contract for Relcamation/repair of 33kV/11kV Power Transformers & 33kV/0.433 kV Transformers of different ratings in respect of STD Ganderbal for the year 2026-27 OR till next Stage contract is finalized. |
| 2 | Shifting of Transformer (33/0.433 KV) from Sub Station bed to worksite of firm & Viceversa, the job includes loading/unloading/dragging & carriage and installation of the same on site including insurance during transit (of capacity 100 KVA to 2.0 MVA) |
| 3 | Shifting of power Transformer from Sub Station bed to worksite of firm & Viceversa, the job includes loading/unloading/dragging & carriage and installation of the same on site including insurance during transit (3.15 MVA to 5.0 MVA) |
| 4 | Shifting of power Transformer from Sub Station bed to worksite of firm & Viceversa, the job includes loading/unloading/dragging & carriage and installation of the same on site including insurance during transit (6.3 MVA to 10 MVA) |
| 5 | Supply and Fabrication of New HV / LV copper conductor (base rate of copper to be fixed and final rate as per IEEMA will be applicable ) |
| 6 | Insulation of new HV / LV copper conductor |
| 7 | High density parmali wood |
| 8 | Supply and fabrication of New insulating press board |
| 9 | New EHV Grade transformer oil (base rate of oil to be fixed and final rate as per IEEMA will be applicable) |
| 10 | Filtration charges of transformer oil |
| 11 | Supply and installation of New gaskets RC 70 grade |
| 12 | Cleaning & spray painting of tank, radiators, conservator , tap changer, marshalling box etc. with one coat of primer & two coats of approved paint and inside the tank with epoxy paint (33/0.433 KV Transformer of capacity 100 KVA to 2 MVA) |
| 13 | Cleaning & spray painting of tank, radiators, conservator , tap changer, marshalling box etc. with one coat of primer & two coats of approved paint and inside the tank with epoxy paint. (3.15 MVA to 5.0 MVA) |
| 14 | Cleaning & spray painting of tank, radiators, conservator , tap changer, marshalling box etc. with one coat of primer & two coats of approved paint and inside the tank with epoxy paint. (6.3 MVA to 10 MVA) |
| 15 | Providing of sundry items for (33/0.433 KV Transformer of capacity 100 KVA to 2 MVA) |
| 16 | Providing of sundry items for (33/11 KV Transformer of capacity 3.15 MVA to 5.0 MVA) |
| 17 | Providing of sundry items for (33/11 KV Transformer of capacity 6.3 MVA to 10 MVA) |
| 18 | Providing and installation of New Off load Tap Changer |
| 19 | Providing and installation of New ON load Tap Changer |
| 20 | Repair of OFF Load Tap Changer |
| 21 | Repair of ON Load Tap Changer |
| 22 | 20 Paper cover copper flexible wire (25 mm sq. / 40mm sq.) |
| 23 | Providing and installation of 36 KV HV Bushing |
| 24 | Providing and installation of 12 KV/ 0.44 KV LV Bushing |
| 25 | Providing and installation of 36 KV HV Brass Stud with Nuts |
| 26 | Providing and installation of 12 KV/ 0.44 KV LV Brass Stud with Nuts |
| 27 | Providing and installation of C.I clamp for 33 KV Bushing |
| 28 | Providing and installation of C.I clamp for 11 KV/ 0.44 KV Bushing |
| 29 | Providing and installation of Arcing Horn Assembly for 33 KV/ 11KV & 33 KV/ 0.44 KV Bushing |
| 30 | Providing and installation of Copper thimble of sorts |
| 31 | Providing and installation of Phase separator with insulation between coil |
| 32 | Providing and installation of Galvanised H.W. items |
| 33 | Providing and installation of new type Silica gel breather |
| 34 | Providing /replacement of Silica gel |
| 35 | Providing and installation of Buchholz relay (with alarm & trip contact) |
| 36 | Providing and installation of Wheel Valve (Flange Type) 50 mm |
| 37 | Providing and installation of BSP Gun metal wheel valve with cap( 1.5”/2.0”) |
| 38 | Providing and installation of Radiator valve |
| 39 | Providing and installation of Oil level gauge in conservator |
| 40 | Providing and installation of Oil Temperature Indicator (with alarm & trip contact) |
| 41 | Providing and installation of Winding Temperature Indicator (with alarm & trip contact) |
| 42 | Providing and installtion of Oil level indicator |
| 43 | Miscellaneous items like insulating paper, cotton Tap, Weaving Taps,SRBP Tube,Sleeving etc |
| 44 | Repairing of tank by way of complete assessment of all leakages and repair of same by way of welding etc. |
| 45 | Repairing of Radiator |
| 46 | Providing and fitting of marshalling box with 24 No. connectors |
| 47 | Replacement of Gasket with all allied materials of Main tank as per direction of inspection team |
| 48 | Replacement of Gasket with all allied materials of Radiator as per direction of inspection team |
| 49 | Replacement of Gasket with all allied materials of HV Bushing as per direction of inspection team |
| 50 | Replacement of Gasket with all allied materials of LV Bushing as per direction of inspection team |
| 51 | Replacement of Gasket with all allied materials of Conservator Tank as per direction of inspection team |
| 52 | Providing and fixing of Oil filter Valves |
| 53 | Providing and fixing air release plug |
| 54 | Providing and fixing of Oil Drain Valves |
| 55 | Heat Treatment (to be applied till desired values are achieved) |
| 56 | Replacement of burnt out / damaged transformer core with new one (CRGO) |
| 57 | Providing/Installation of 04 core control cable for WTI/ OTI/ Bucholz Termination. |
| 58 | Detanking of whole transformer complete Job including refitting back after repairs 33/0.443 KV (100 KVA To 2 MVA) |
| 59 | Detanking of whole transformer complete Job including refitting back after repairs ( 3.15 MVA to 5MVA) |
| 60 | Detanking of whole transformer complete Job including refitting back after repairs (6.3 MVA to 10 MVA) |
| 61 | Unmounting and draging of existing power Transformer from Sub Station bed to make way for installation of another power tranformer (100 KVA To 2 MVA) ( if need arises) |
| 62 | Unmounting and draging of existing power Transformer from Sub Station bed to make way for installation of another power tranformer (3.15 MVA To 5 MVA) ( if need arises) |
| 63 | Unmounting and draging of existing power Transformer from Sub Station bed to make way for installation of another power tranformer (6.3 MVA To 10 MVA) ( if need arises) |
| 64 | Scrap old copper conductor (base rate of copper to be fixed and final rate as per IEEMA will be applicable) |
| 65 | Scrap old / carbonized transformer oil (base rate of oil to be fixed and final rate as per IEEMA will be applicable) |
| 66 | Scrap Red iron Ms iron and Brass parts |
| 67 | Scrap core material. Please Enable Macros to View BoQ information |