Drinking Water Supply and Sanitation Government Departments Closing in 2 days TDR #56198563

Tender For Permanent Restoration Of Various Water Supply Schemes Of Phe Sub Division Vijaypur Damaged During Flash Floods/Landslides In August & September 2025 Under Sasci

Issued by Government Departments · Samba, Jammu and Kashmir
Tender Value
33.54 Lakhs
Estimated cost
Bid Submission
13 Jul 2026
2 days left
EMD
67080
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Samba → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Permanent Restoration Of Various Water Supply Schemes Of Phe Sub Division Vijaypur Damaged During Flash Floods/Landslides In August & September 2025 Under Sasci

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 10-Jul-2026 Corrigendum Date 13-Jul-2026

BOQ

Name of Work:- Permanent restoration of Various Water Supply Schemes of PHE Sub Division Vijaypur damaged during flash floods/landslides in August & september 2025 Under SASCI
Sl. No. Item Description
1WSS Uetterbehni Section (Revival of Dug well): Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
2Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively ) Wet
3Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil : 3rd lift
44th lift
55th lift
66th lift
7Extra rates for quantities of works executed :In or under water and/ or liquid mud, including pumping out water as required.
8Actual labour engaged for scrapping of walls and identifying sepage spot , clearance and disposal of rubbish
9Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge.
10(Crate) Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge. All kinds of soil :
11Hand-packing stones in wire-crates; excluding cost of crates and stones
12Dumping of stones excluding of stones
13Supply of stones
14Add for monosub pump incl. all necessary
15Add cost of Knitted wire crates
16Carriage of stone from source to site of work avg.20 Km by MT and 50 mtr by head load
17Boundary wall: Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
18Centring and shuttering including strutting, propping etc and removal of form work for foundation, footings, base for columns .
19Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)
20Extra for brick work in super structure above plinth level upto floor V level.
21Half brick masonry with bricks of class designation 75 in foundation and plinth in cement mortar 1:4
22Extra for half brick masonry in super structure above plinth level upto floor V level
2315mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 coarse sand)
24Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
25Carriage of sand and stone aggregate upto 20mm nominal size by Mechanical Transport in all terrains through a lead up to 10 kms including cost of loading, unloading and stacking
26Carriage of brick by Mechanical Transport in all terrains through a lead up to15 kms including cost of loading, unloading and stacking.
27WSS Rarrian :(Crate) Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
28Hand-packing stones in wire-crates; excluding cost of crates and stones
29Supply of stones
30Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, lead upto 50 m and lift upto 1.5 m.
31Add cost of Knitted wire crates
32Carriage of stone from source to site of work avg.15 Km by MT and 50 mtr by head load
33(Track) : Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth inlayers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
34Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
35Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
36Carriage of cement lead upto 10 km by Mechanical Transport and 50 Mtr by head load incl. loading, unloading and stacking
37Carriage of sand upto a lead of 15 km by Mechanical Transport and 50 Mtr by head load incl. loading, unloading and stacking
38Carriage of stone aggregate below 40 mmm nominal size, upto a lead of 15 km by Mechanical Transport and 50 Mtr by head load incl. loading, unloading and stacking
39(Recharge-pit) : Labour engaged for general site clearance
40Earth work in excavation by manual means in trenches for foundation , drains , pipes cables etc (not exceeding 1.5 mtr in width) and for shafts wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils.
41Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
42Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
43Honey-comb brick work 10/11.4 cm thick with common burnt clay (non-modular) bricks of class designation 75 in superstructure above plinth level upto floor five level in cement mortar 1:4 (1 cement : 4 coarse sand) including curing complete
44Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
45Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars
46Filling of Brick bats
47Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
48Add for Geo Textile
49Provision for PVC pipe, PVC bend 110 mm dia, Manhole ring & others
50Provision for C.I.B.
51Carriage of sand , stone aggregate below 40 mmm nominal size, upto a lead of 15 km by Mechanical Transport and 50 Mtr by head load incl. loading, unloading and stacking
52Carriage of brick lead upto 20 km by Mechanical Transport incl. loading, unloading and stacking
53WSS Moutlian Old :(Crate) Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
54Hand-packing stones in wire-crates; excluding cost of crates and stones
55Supply of stones
56Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, lead upto 50 m and lift upto 1.5 m.
57Add cost of Knitted wire crates
58Carriage of stone from source to site of work avg.20 Km by MT
59(Distribution System) : Earth work in excavation by manual means in trenches for foundation , drains , pipes cables etc (not exceeding 1.5 mtr in width) and for shafts wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils.
60Providing and fixing HDPE pipes including pipe specials excluding excavation and refilling into trenches HDPE Pipe 90 mm Ø
61HDPE Pipe 75 mm Ø
62HDPE Pipe 63 mm Ø
63Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, lead upto 50 m and lift upto 1.5 m.
64WSS Chak Medu Basotra :(Crate) Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
65Hand-packing stones in wire-crates; excluding cost of crates and stones
66Supply of stones
67Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, lead upto 50 m and lift upto 1.5 m.
68Add cost of Knitted wire crates
69Carriage of stone from source to site of work avg.15 Km by MT and 50 Mtr by head load Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56198563
AUTHORITY Government Departments
TENDER VALUE 33.54 Lakhs
LAST DATE 13-07-2026
Authority
Authority Name Public Health Engineering Department
Work Description Tender for Permanent Restoration Of Various Water Supply Schemes Of Phe Sub Division Vijaypur Damaged During Flash Floods/Landslides In August & September 2025 Under Sasci
Basic Detail
Tender No e-NIT No.PHES/11 of 2026-27 dated. 27.06.2026
Bidding Type Tender
Location
City Samba
State Jammu and Kashmir
Key Dates
Publish Date 10 Jul 2026
Submission Date 13 Jul 2026
Open Date 13 Jul 2026
Finance
Tender Value 33.54 Lakhs
Tender Fee 1000
EMD 67080
Exemption Not Available
Document List
BOQ_1015997.xls
ee784e70-3eb2-455d-b427-7a6c98c37141.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 13, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 2 days
Jul 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Jul 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1015997.xls

html

ee784e70-3eb2-455d-b427-7a6c98c37141.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders