| 1 | Dewatering of trench by pump including pump operator, fuel, T&P etc. required for proper completion of work.- LDA Approved3 |
| 2 | Cartage of earth 10 km distance from site. DSR 2023/1.1.2- DSR-1.1.2 2023 |
| 3 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level- L.D.A APPRO. |
| 4 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor graded on perpared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratoy roller to achieve the desired density complete as per clause 401. for grading I material (GSB-1) (Sanction rate)-1001 |
| 5 | Providing and laying spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carrige of mixed material by tipper to site, laying in uniform layiers with paver in sub-base / base course one well prepared surface and compacting with vibratory roller to achieve the desired density. (Sanction Rate)- morth -406 (sanctioned rate) |
| 6 | Providing and applying primer coat with bitumen emulsion (slowe setting) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. (Sanction Rate)- MoRTH Based Analysis |
| 7 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.- Tack coat |
| 8 | Providing and laying bituminous macadam (B.M.) with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @3.30%, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (Sanction Rate)-1052 |
| 9 | 25 mm thick Semi-Dense Bituminous Concrete (S.D.B.C.) (Using Water Plastic) providing and laying Semi-Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5 per cent mix to work at site as per MORTH & H specification clause No. 508 complete in all respects(Reducing Bituminous Quantity by 8% and replacing it by Plastic wastage as per IRC : SP: 98-2013) (Sanction Rate)-1054 |
| 10 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered)., Depth exceeding 1.5 m but not exceeding 3 m.DSR 2023- 2.16.2 |
| 11 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil.DSR 2023- 2.8.1 |
| 12 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).DSR 2023- 4.1.8 |
| 13 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)DSR 2023- 5.1.2 |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1DSR 2023- 5.9.1 |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form for :, Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.DSR 2023- 5.9.2 |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form for :, Suspended floors, roofs, landings, balconies and access platformDSR 2023- 5.9.3 |
| 17 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.DSR 2023- 13.80 |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :, same as item 21 above but on new wood surfaceDSR 2023- 13.61.1 |
| 19 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.., Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortarDSR 2023- 15.7.4 |
| 20 | Deduction of saleable Brick bat all complete (Supply Rate+10% in 2020-2021)- supply Rate B/w 20-21 |
| 21 | Deduction of saleable Brick all complete(Supply rate+10%in 2020-21)- deduction B/W 20-21 Please Enable Macros to View BoQ information |