| 1 | Repairing the condensate tank pump delivery line of the pan 1 | Fabricate and install 6inch size nipple |
| 2 | Repairing the condensate tank pump delivery line of the pan 2 | Fabricate and install 6inch size flange |
| 3 | Repairing the condensate tank pump delivery line of the pan 3 | Dismantling 6inch size pipeline |
| 4 | Replacing damaged bypass line band flange of melter 1 | Installing 6inch size pipeline and giving satisfactory trial |
| 5 | Replacing damaged bypass line band flange of melter 2 | Fabricate and install 6inch size band |
| 6 | Replacing damaged bypass line band flange of melter 3 | Fabricate and install 6inch size flange |
| 7 | Replace damaged 100 pound 3inch size pipeline from Pan No 1 to Pan No 6 and give satisfactory trial | Replace damaged 100 pound 3inch size pipeline from Pan No 1 to Pan No 6 and give satisfactory trial |
| 8 | Replace the weak vapor pipe from Pan No 1 to 6 size dia 1 150 m length 30 m 1 | Dismantle the weak vapor pipe from Pan No 1 to 6 |
| 9 | Replace the weak vapor pipe from Pan No 1 to 6 size dia 1 150 m length 30 m 2 | Fabricate the weak vapor pipe from Pan No 1 to 6 |
| 10 | Replace main hole dia 600 mm of Pan No 3 Sevual with 10 mm thick plate | Replace main hole dia 600 mm of Pan No 3 Sevual with 10 mm thick plate |
| 11 | Replace damaged overflow pipeline of BH and CL molasses conditioner of 6inch size 1 | Replace damaged overflow pipeline of BH and CL molasses conditioner of 6inch size |
| 12 | Replace damaged overflow pipeline of BH and CL molasses conditioner of 6inch size 2 | Fabricate and install 6inch size band |
| 13 | Replace corroded nipples pipes flanges of 6inch size header on Pan No 5 and 6 install related nipples valves etc and give satisfactory trial | Replace corroded nipples pipes flanges of 6inch size header on Pan No 5 and 6 install related nipples valves etc and give satisfactory trial |
| 14 | Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 1 | Replace 2inch size pipeline |
| 15 | Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 2 | Fabricate and install 2inch size flange |
| 16 | Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 3 | Fabricate and install 2inch size nipple |
| 17 | Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 4 | Fabricate and install 3inch size flange |
| 18 | Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 5 | Fabricate and install 3inch size valve |
| 19 | Cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and install it 1 | Replace and install 6inch size pipeline |
| 20 | Cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and install it 2 | Fabricate and install 6inch size flange |
| 21 | Replace damaged washing pipeline nipple flange band on Pan No 6 1 | Replace 6inch size pipeline of the above |
| 22 | Replace damaged washing pipeline nipple flange band on Pan No 6 2 | Fabricate and install 6inch size flange |
| 23 | Replace damaged washing pipeline nipple flange band on Pan No 6 3 | Fabricate and install 6inch size nipple |
| 24 | Replace damaged washing pipeline nipple flange band on Pan No 6 4 | Fabricate and install 6inch size band |
| 25 | Install valve in steam line at Pan No 2 550 mm 1 | Install valve in steam line at Pan No 2 550 mm |
| 26 | Install valve in steam line at Pan No 2 550 mm 2 | Install flange in steam line at Pan No 2 550 mm |
| 27 | Install valve in steam line at Pan No 2 550 mm 3 | Install nipple in steam line at Pan No 2 550 mm |
| 28 | Install valve in steam line at Pan No 2 550 mm 4 | Fabricate and install catcher element size 75 X 75 X 8 angle on Pan No 4 and 5 |
| 29 | Replace nipple and band of A heavy tank 2 | Replace nipples of the above tank |
| 30 | Replace nipple and band of A heavy tank 3 | Replace bands of the above tank |
| 31 | Replace nipple and band of A heavy tank 4 | Replace partition of syrup tank with 10/12 mm thick plate |
| 32 | Remove clean and reinstall 4inch size syrup line on pan | Remove clean and reinstall 4inch size syrup line on pan |
| 33 | Cut and remove syrup header and fabricate and install new header | Cut and remove syrup header and fabricate and install new header |
| 34 | Replacing the 6inch size glycol washing line fitted on Pan No 1 | Replacing the 6inch size glycol washing line fitted on Pan No 1 |
| 35 | Replacing nipples of different lines of Pan No 6 1 | Replacing nipples of 2inch size line mentioned above |
| 36 | Replacing nipples of different lines of Pan No 6 2 | Replacing nipples of 4inch size line mentioned above |
| 37 | Replacing nipples of different lines of Pan No 6 3 | Replacing nipples of 6inch size line mentioned above |
| 38 | Replacing nipples of different lines of Pan No 6 4 | Replacing nipples of 8inch size line mentioned above |
| 39 | Replacing 10inch size nipples of cut off line of Pan No 6 1 | Replacing 10inch size nipples of cut off line of Pan No 6 |
| 40 | Replacing 10inch size nipples of cut off line of Pan No 6 2 | Replacing 10inch size pipe line |
| 41 | Replacing 10inch size nipples of cut off line of Pan No 6 3 | Making and fitting 10inch size flange |
| 42 | Replacing 10inch size nipples of cut off line of Pan No 6 4 | Making and fitting 10inch size band |
| 43 | Replacing corroded hot water pipeline nipples flanges valves in Pan No 4 1 | Making and fitting 8inch size band |
| 44 | Replacing corroded hot water pipeline nipples flanges valves in Pan No 4 2 | Replacing 4inch size pipe line |
| 45 | Replacing corroded hot water pipeline nipples flanges valves in Pan No 4 3 | Making and fitting 4inch size flange |
| 46 | Replacing corroded hot water pipeline nipples flanges valves in Pan No 4 4 | Making and fitting 4inch size valve |
| 47 | Fabricating M S bed for syrup pump and motor fitting and alignment followed by satisfactory trial | Fabricating M S bed for syrup pump and motor fitting and alignment followed by satisfactory trial |
| 48 | Dismantling weak condensate bottle of old set | Dismantling weak condensate bottle of old set vertical line juice heater and quad body No 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial |
| 49 | Replacing weak pipeline flange valve and band of old set vertical juice heater 1 | Replacing 2inch size pipeline |
| 50 | Replacing weak pipeline flange valve and band of old set vertical juice heater 2 | Replacing 6inch size pipeline |
| 51 | Replacing weak pipeline flange valve and band of old set vertical juice heater 3 | Making and fitting 2inch size flange |
| 52 | Replacing weak pipeline flange valve and band of old set vertical juice heater 4 | Making and fitting 6inch size flange |
| 53 | Replacing weak pipeline flange valve and band of old set vertical juice heater 5 | Making and fitting 6inch size band |
| 54 | Replacing weak pipeline of old Quad set No 4 1 | Making and fitting 6inch size valve |
| 55 | Replacing weak pipeline of old Quad set No 4 2 | Replacing 2inch size pipeline |
| 56 | Replacing weak pipeline of old Quad set No 4 3 | Replacing 6inch size pipeline |
| 57 | Replacing weak pipeline of old Quad set No 4 4 | Making and fitting 6inch size band |
| 58 | Replacing weak pipeline of old Quad set No 4 5 | Making and fitting 6inch size flange |
| 59 | Dismantling damaged mesh of section pipe located at Injection No 2 and 3 and making a new one from given M S plate and fitting it | Dismantling damaged mesh of section pipe located at Injection No 2 and 3 and making a new one from given M S plate and fitting it |
| 60 | Cutting and discarding old damaged reducer plate of section pipe located at Injection No 2 and 3 and remaking the same | Cutting and discarding old damaged reducer plate of section pipe located at Injection No 2 and 3 and remaking the same |
| 61 | Fitting water line from overhead to service tank 1 | Fitting mentioned line into service tank |
| 62 | Fitting water line from overhead to service tank 2 | Making and fitting 8inch size band |
| 63 | Details of work of Canti machine No 6 and 7 1 | Making and fitting 8inch size nipple |
| 64 | Details of work of Canti machine No 6 and 7 2 | Dismantling and fitting 6inch size pipeline |
| 65 | Details of work of Canti machine No 6 and 7 3 | Making and fitting 6inch size band |
| 66 | Details of work with new pipes from S Sugarbin 1 | Dismantling resistance box installed on spray making and fitting new one from given M M plate carrying out proper stay fitting and welding and conducting leak proof trial |
| 67 | Details of work with new pipes from S Sugarbin 2 | Dismantling and installing 8inch size pipeline |
| 68 | Details of work with new pipes from S Sugarbin 3 | Fabricating and installing 8inch size bands |
| 69 | Details of work for KCP No 1 and 2 and Canty Machine No 6 and 7 1 | Fabricating and installing 8inch size flanges |
| 70 | Details of work for KCP No 1 and 2 and Canty Machine No 6 and 7 2 | Dismantling and installing 12inch size pipeline |
| 71 | Details of work for KCP No 1 and 2 and Canty Machine No 6 and 7 3 | Fabricating and installing 12inch size bands |
| 72 | Work on hot water line of brown sugar magma 1 | Fabricating and installing 12inch size flanges |
| 73 | Work on hot water line of brown sugar magma 2 | Dismantling and installing 3inch size pipeline |
| 74 | Work on hot water line of brown sugar magma 3 | Manufacturing and installing 3inch size nipples |
| 75 | Work on hot water line of brown sugar magma 4 | Manufacturing and installing 3inch size bands |
| 76 | Cutting and removing damaged monitor casing and ribs | Cutting and removing damaged monitor casing and ribs inside Canty No 1 and 2 and KCP Machine 1 and 2 patching with 10/12 mm MS plate and giving satisfactory trial 1 |
| 77 | Cutting and removing damaged center shaft and arms inside KCP Machines No 1 and 2 bending and fitting new parts with 8 to 10 mm plate | Cutting and removing damaged center shaft and arms inside KCP Machines No 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1 |
| 78 | Dismantling damaged upper cover part of Canty Machine No 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections | Dismantling damaged upper cover part of Canty Machine No 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections |
| 79 | Dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard | Dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard |
| 80 | Dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard | Dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard |
| 81 | Details of work from C magma to melter tank 1 | Modifying sugar chute of grader in dryer house and giving satisfactory trial |
| 82 | Details of work from C magma to melter tank 2 | Dismantling and installing 4inch size pipeline |
| 83 | Details of work from C magma to melter tank 3 | Fabricating and installing 4inch size flanges |
| 84 | Details of work from C magma to melter tank 4 | Manufacturing and installing 4inch size bands |
| 85 | Details of work from C magma to melter tank 5 | Manufacturing and installing 4inch size nipples |
| 86 | Repairing work details of final molasses tank 1 | Removing transit heater installed on C Centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections |
| 87 | Repairing work details of final molasses tank 2 | Dismantling and installing 2inch size pipeline |
| 88 | Repairing work details of final molasses tank 3 | Fabricating and installing 2inch size flanges |
| 89 | Repairing work details of final molasses tank 4 | Manufacturing and installing 2inch size nipples |
| 90 | Repairing work details of final molasses tank 5 | Manufacturing and installing 2inch size valves |
| 91 | Details of work from melter to magma line 1 | Removing old taper of Sugar Hopper No 1 scrapping it fabricating new one from 3/5 mm MS plate installing and giving satisfactory trial |
| 92 | Details of work from melter to magma line 2 | Dismantling and installing 6inch size pipeline |
| 93 | Details of work from melter to magma line 3 | Manufacturing and installing 6inch size bands |
| 94 | Details of work for A magma pump 1 | Manufacturing and installing 2inch size nipples |
| 95 | Details of work for A magma pump 2 | Manufacturing and installing 6inch size bands |
| 96 | Details of work for A magma pump 3 | Manufacturing and installing 6inch size flanges |
| 97 | Details of work for A magma pump 4 | Manufacturing and installing 5inch size flanges |
| 98 | Details of work for A magma pump 5 | Manufacturing and installing 5inch size valves |
| 99 | Details of work at ETP Effluent Treatment Plant1 | Removing damaged/weak top and bottom sugar discharge chute of Canty Machine No 4 including flange scrapping fabricating new parts with 6 mm MS plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial |
| 100 | Details of work at ETP Effluent Treatment Plant2 | Installing 2inch flow meter |
| 101 | Details of work at ETP Effluent Treatment Plant3 | Dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline |
| 102 | Details of work at ETP Effluent Treatment Plant4 | Dismantling and installing 4inch size pipeline |
| 103 | Details of work at ETP Effluent Treatment Plant5 | Installing 4inch size valve/NRV |
| 104 | Details of work at ETP Effluent Treatment Plant6 | Fabricating 4inch size band |
| 105 | Details of work at ETP Effluent Treatment Plant7 | Dismantling and installing 2inch size pipeline |
| 106 | Details of work at ETP Effluent Treatment Plant8 | Fabricating and installing 2inch size flange |
| 107 | Dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard | Dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard |
| 108 | Dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part | Dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part |
| 109 | In Sulfate Removal Plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate | In Sulfate Removal Plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate |
| 110 | Dismantling corroded 2inch size treated water outlet line of ETP and putting in scrap yard and installing new 3inch size line at the same location | Dismantling corroded 2inch size treated water outlet line of ETP and putting in scrap yard and installing new 3inch size line at the same location |
| 111 | Dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard | Dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard |
| 112 | Fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial | Fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial |
| 113 | Fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial | Fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial |
| 114 | Fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into T shape and installing at position and providing satisfactory trial | Fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into T shape and installing at position and providing satisfactory trial |
| 115 | Fabricating work | Fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial |
| 116 | Dismantling weak part of semichemiser 1000 wag meter | Dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial Size dia 3 4 m |
| 117 | Dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial | Dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial |
| 118 | Dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial | Dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial |
| 119 | Dismantling weak part of 6inch size header of all juice heaters condensate and installing new one | Dismantling weak part of 6inch size header of all juice heaters condensate and installing new one |
| 120 | Removing all partition plates | Removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with MS strips as before applying rubber strips and providing satisfactory trial |
| 121 | Cutting out quailons and all related angles | Cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial |
| 122 | Carrying out work on clarifier pipeline 1 | Patching inside clarifier with 6/8 mm MS plate |
| 123 | Carrying out work on clarifier pipeline 2 | Dismantling damaged 8inch size MS pipeline from clarifier clear juice overflow tank to sombox |
| 124 | Carrying out work on clarifier pipeline 3 | Installing 6inch size MS pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial |
| 125 | Carrying out work on clarifier pipeline 4 | Opening 6inch size valve and installing at designated location |
| 126 | Carrying out work on clarifier pipeline 5 | Fabricating 6inch size nipple and installing at designated location |
| 127 | Carrying out work on clarifier pipeline 6 | Fabricating 6inch size flange by cutting plate and dismantling to fit |
| 128 | Carrying out work on clarifier pipeline 7 | Dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard |
| 129 | Carrying out work related to pipeline on big vacuum filter 1 | Installing 4inch size air pipeline above door and providing satisfactory trial |
| 130 | Carrying out work related to pipeline on big vacuum filter 2 | Dismantling 6inch size MS pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard |
| 131 | Carrying out work related to pipeline on big vacuum filter 3 | Fitting and trial of 6inch size MS pipeline overflow line of big vacuum filter mud tank at position |
| 132 | Carrying out work related to pipeline on big vacuum filter 4 | Fabricating 6inch size band |
| 133 | Carrying out work related to pipeline on big vacuum filter 5 | Fabricating 8inch size band |
| 134 | Carrying out work related to pipeline on big vacuum filter 6 | Dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard |
| 135 | Fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position | Fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position |
| 136 | Dismantling 4inch MS pipeline from filter juice header to vibro screen | Dismantling 4inch MS pipeline from filter juice header to vibro screen |
| 137 | Fitting and trial of 4inch MS pipeline from filter juice header to vibro screen at position | Fitting and trial of 4inch MS pipeline from filter juice header to vibro screen at position |
| 138 | Making 4inch size nipple | Making 4inch size nipple |
| 139 | Opening 4inch size valve | Opening 4inch size valve |
| 140 | Installing 4inch size valve at the specified location | Installing 4inch size valve at the specified location |
| 141 | Carrying out work related to small vacuum filter pipelines etc 1 | Cutting 4inch size flange from plate making it and fitting after drilling |
| 142 | Carrying out work related to small vacuum filter pipelines etc 2 | Dismantling 3inch size pipeline |
| 143 | Carrying out work related to small vacuum filter pipelines etc 3 | Installing and fitting 3inch size line at position and giving satisfactory trial |
| 144 | Carrying out work related to small vacuum filter pipelines etc 4 | Making and installing 3inch size T |
| 145 | Carrying out work related to small vacuum filter pipelines etc 5 | Making and installing 3inch size nipple |
| 146 | Carrying out work related to small vacuum filter pipelines etc 6 | Cutting 3inch size flange from plate making it and installing |
| 147 | Carrying out work related to small vacuum filter pipelines etc 7 | Making and installing 3inch size band |
| 148 | Carrying out work related to small vacuum filter pipelines etc 8 | Dismantling 8inch size clear juice overflow pipeline |
| 149 | Carrying out work related to small vacuum filter pipelines etc 9 | Installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial |
| 150 | Carrying out work related to pipeline from juice sulfiter tank to juice tank 1 | Making and installing 3inch size band |
| 151 | Carrying out work related to pipeline from juice sulfiter tank to juice tank 2 | Dismantling 6inch size pipeline |
| 152 | Carrying out work related to pipeline from juice sulfiter tank to juice tank 3 | Installing and fitting 6inch size pipeline at position and giving satisfactory trial |
| 153 | Carrying out work related to pipeline from juice sulfiter tank to juice tank 4 | Making and installing 6inch size band/elbow at specified location |
| 154 | Carrying out work related to pipeline from juice sulfiter tank to juice tank 5 | Making and installing 6inch size T |
| 155 | Carrying out work related to pipeline from juice sulfiter tank to juice tank 6 | Dismantling 4inch size pipeline |
| 156 | Carrying out work related to pipeline from juice sulfiter tank to juice tank 7 | Installing and fitting 4inch size pipeline at position and giving satisfactory trial |
| 157 | Carrying out work related to pipeline from juice sulfiter tank to juice tank 8 | Making and installing 4inch size band |
| 158 | Carrying out work related to pipeline from juice tank to juice sulfiter | Making and installing 4inch size T |
| 159 | Carrying out work related to pipeline from juice tank to juice sulfiter | Dismantling 10inch size pipeline |
| 160 | Carrying out work related to pipeline from juice tank to juice sulfiter | Installing fitting and trial of 10inch size pipeline at position |
| 161 | Carrying out work related to pipeline from juice tank to juice sulfiter | Making and installing 10inch size T |
| 162 | Carrying out work related to pipeline from juice tank to juice sulfiter | Making and installing 10inch size dummy/flange |
| 163 | Carrying out work related to pipeline from juice tank to juice sulfiter | Dismantling 6inch pipeline |
| 164 | Carrying out work related to pipeline from juice tank to juice sulfiter | Installing fitting and trial of 6inch size pipeline at position |
| 165 | Carrying out work related to pipeline from juice tank to juice sulfiter | Making and fitting 6inch size flange |
| 166 | Carrying out work related to pipeline from juice tank to juice sulfiter | Opening and binding 6inch size valve |
| 167 | Carrying out work related to pipeline from juice tank to juice sulfiter | Dismantling 4inch size pipeline |
| 168 | Carrying out work related to pipeline from juice tank to juice sulfiter | Installing fitting and trial of 4inch size pipeline at position |
| 169 | Carrying out work related to pipeline from juice tank to juice sulfiter | Making and installing 8inch and 6inch size cross |
| 170 | Carrying out work related to pipeline from juice tank to juice sulfiter | Dismantling 4inch size ammonia pipeline of semichemiser quad |
| 171 | Carrying out work related to pipeline from juice tank to juice sulfiter | Installing 4inch size ammonia pipeline of semichemiser quad at position |
| 172 | Carrying out work related to pipeline from juice tank to juice sulfiter | Making 4inch size band |
| 173 | Carrying out work related to pipeline from juice tank to juice sulfiter | Making 4inch size T |
| 174 | Carrying out work related to pipeline from juice tank to juice sulfiter | Making 4inch size flange |
| 175 | Carrying out work related to pipeline from juice tank to juice sulfiter | Dismantling 2inch size pipeline |
| 176 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fixing 2inch size pipeline in position |
| 177 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fabricating and installing 2inch size flange |
| 178 | Carrying out work related to pipeline from juice tank to juice sulfiter | Dismantling new Quad No 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing |
| 179 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fabricating and installing 24inch size bends |
| 180 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fabricating and installing 24inch size tees |
| 181 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fabricating and installing 24inch size flange/dummy |
| 182 | Carrying out work related to pipeline from juice tank to juice sulfiter | Dismantling 24inch size pipeline |
| 183 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fitting 24inch size pipeline in position |
| 184 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fabricating and installing 24inch size flange |
| 185 | Carrying out work related to pipeline from juice tank to juice sulfiter | Cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial |
| 186 | Carrying out work related to pipeline from juice tank to juice sulfiter | Dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial |
| 187 | Carrying out work related to pipeline from juice tank to juice sulfiter | Dismantling 6inch condensate header of juice heaters and replacing the weak part |
| 188 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fitting 6inch size pipeline in position and conducting satisfactory trial |
| 189 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fabricating and installing 6inch size flange |
| 190 | Carrying out work related to pipeline from juice tank to juice sulfiter | Fabricating and installing 6inch size nipple |
| 191 | Works related to juice sulfiter gas pipeline | Fabricating and installing 6inch size tees |
| 192 | Works related to juice sulfiter gas pipeline | Dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial |
| 193 | Works related to juice sulfiter gas pipeline | Fabricating and installing 6inch size flange |