Bids Are invited for Boiler House Febrication Work
Tender Overview
Project Description
Bids Are invited for Boiler House Febrication Work Remove The Worn Out Runners From The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Errect 8X65 10X50 Mm Flat Iron Bars In Their Place Clean The Welded Areas Using A Grinder - Boiler Work , Cut And Remove The Worn Out Bottom Plates Of The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Errect New 6 8 10 Mm - Boiler Work , Cut And Remove The Worn Out Side Plates Of The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Errect 6 8 10 Mm Plates Satisfactory Trial Run - Boiler Work , Cut Out And Remove The Damaged And Weak Sections Of The Main Bagasse Carrier Fabricate And Errect A New Assembly Including The Gear Shaft System Using The Supplied Plate - Boiler Work , Cut Out And Remove The Weak And Corroded Sections Of The Bagasse Feeding Chutes Errected Boilers Fabricate And Replacements Using The Provided Plates And Repair The Associated Shafts And Gears - Boiler Work , The Casings Of The Boiler Id And Fd Fans Have Become Severely Weakened And Damaged The Task Involves Cutting Away And Removing The Weakened Sections Fabricating - Boiler Work , Cut And Remove The Deteriorated Side Bottom And Top Plates Surrounding The Air Heater Of Boiler No. 3 Fabricate And Errect New Plates Using The Specified 6 8 Mm Plate In Their Original Positions - Boiler Work , Fully Strengthen The Air Heater Plates And Conduct A Satisfactory Trial. - Boiler Work , Dismantling The Old Air Heater Tubes Of Boiler No. 01 Size 63.5 Mm Od X 2.64 Mm Thickness Fabricating And Errecting New Tubes In Accordance With The Drawing - Boiler Work , Dismantling The Old Air Heater Tubes Of Boiler No. 02 Size 63.5 Mm Od X 2.64 Mm Thickness Fabricating And Errecting New Tubes In Accordance With The Drawing - Boiler Work , Dismantling The Old Air Heater Tubes Of Boiler No. 03 Size 63.5 Mm Od X 2.64 Mm Thickness Fabricating And Errecting New Tubes In Accordance With The Drawing - Boiler Work , A. Dismantling Old Columns Beam Channels Etc. B. Manufacturing And Installing New Columns Beam Channels - Boiler Work , Installing 16 Inch 18 Inch Manholes With Blinds - Boiler Work , Constructing A Bed For The Pump Fitting The Pump And Motor And Conducting A Trial Run Of Up To Twenty Hp - Boiler Work , Dismantling Fabricating And Erecting Weak Corroded Pipe Lines Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting Weak Corroded Tees Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting Weak Corroded Nipples Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Throated Cross Member Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Throated Band Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Throated Flange Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Sloping Reducer Up To 12 And Providing A Satisfactory Leak Proof Trial. - Boiler Work , Removing The Old Corroded Platform And Replacing It With A New One - Boiler Work Total Quantity : 1698
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier errect 8x65 10x50 mm flat iron bars in their place clean the welded areas using a grinder | Boiler Work |
| 2 | Cut and remove the worn out bottom plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect new 6 8 10 mm | Boiler Work |
| 3 | Cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect 6 8 10 mm plates satisfactory trial run | Boiler Work |
| 4 | Cut out and remove the damaged and weak sections of the main bagasse carrier fabricate and errect a new assembly including the gear shaft system using the supplied plate | Boiler Work |
| 5 | Cut out and remove the weak and corroded sections of the bagasse feeding chutes errected boilers fabricate and replacements using the provided plates and repair the associated shafts and gears | Boiler Work |
| 6 | The casings of the boiler ID and FD fans have become severely weakened and damaged The task involves cutting away and removing the weakened sections fabricating | Boiler Work |
| 7 | Cut and remove the deteriorated side bottom and top plates surrounding the air heater of Boiler No. 3 fabricate and errect new plates using the specified 6 8 mm plate in their original positions | Boiler Work |
| 8 | Fully strengthen the air heater plates and conduct a satisfactory trial. | Boiler Work |
| 9 | Dismantling the old air heater tubes of Boiler No. 01 size 63.5 mm OD x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing | Boiler Work |
| 10 | Dismantling the old air heater tubes of Boiler No. 02 size 63.5 mm OD x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing | Boiler Work |
| 11 | Dismantling the old air heater tubes of Boiler No. 03 size 63.5 mm OD x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing | Boiler Work |
| 12 | a. Dismantling old columns beam channels etc. B. Manufacturing and installing new columns beam channels | Boiler Work |
| 13 | Installing 16 inch 18 inch manholes with blinds | Boiler Work |
| 14 | Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to Twenty HP | Boiler Work |
| 15 | Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials. | Boiler Work |
| 16 | Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials. | Boiler Work |
| 17 | Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials. | Boiler Work |
| 18 | Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials. | Boiler Work |
| 19 | Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials. | Boiler Work |
| 20 | Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials. | Boiler Work |
| 21 | Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial. | Boiler Work |
| 22 | Removing the old corroded platform and replacing it with a new one | Boiler Work |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender