Agriculture Cooperative Closing in 7 days TDR #56196543

Bids Are invited for Boiler House Febrication Work

Issued by Cooperative · Saharanpur, Uttar Pradesh
Tender Value
3.27 Lakhs
Estimated cost
Bid Submission
13 Jul 2026
7 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Saharanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1698

Project Description

Bids Are invited for Boiler House Febrication Work Remove The Worn Out Runners From The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Errect 8X65 10X50 Mm Flat Iron Bars In Their Place Clean The Welded Areas Using A Grinder - Boiler Work , Cut And Remove The Worn Out Bottom Plates Of The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Errect New 6 8 10 Mm - Boiler Work , Cut And Remove The Worn Out Side Plates Of The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Errect 6 8 10 Mm Plates Satisfactory Trial Run - Boiler Work , Cut Out And Remove The Damaged And Weak Sections Of The Main Bagasse Carrier Fabricate And Errect A New Assembly Including The Gear Shaft System Using The Supplied Plate - Boiler Work , Cut Out And Remove The Weak And Corroded Sections Of The Bagasse Feeding Chutes Errected Boilers Fabricate And Replacements Using The Provided Plates And Repair The Associated Shafts And Gears - Boiler Work , The Casings Of The Boiler Id And Fd Fans Have Become Severely Weakened And Damaged The Task Involves Cutting Away And Removing The Weakened Sections Fabricating - Boiler Work , Cut And Remove The Deteriorated Side Bottom And Top Plates Surrounding The Air Heater Of Boiler No. 3 Fabricate And Errect New Plates Using The Specified 6 8 Mm Plate In Their Original Positions - Boiler Work , Fully Strengthen The Air Heater Plates And Conduct A Satisfactory Trial. - Boiler Work , Dismantling The Old Air Heater Tubes Of Boiler No. 01 Size 63.5 Mm Od X 2.64 Mm Thickness Fabricating And Errecting New Tubes In Accordance With The Drawing - Boiler Work , Dismantling The Old Air Heater Tubes Of Boiler No. 02 Size 63.5 Mm Od X 2.64 Mm Thickness Fabricating And Errecting New Tubes In Accordance With The Drawing - Boiler Work , Dismantling The Old Air Heater Tubes Of Boiler No. 03 Size 63.5 Mm Od X 2.64 Mm Thickness Fabricating And Errecting New Tubes In Accordance With The Drawing - Boiler Work , A. Dismantling Old Columns Beam Channels Etc. B. Manufacturing And Installing New Columns Beam Channels - Boiler Work , Installing 16 Inch 18 Inch Manholes With Blinds - Boiler Work , Constructing A Bed For The Pump Fitting The Pump And Motor And Conducting A Trial Run Of Up To Twenty Hp - Boiler Work , Dismantling Fabricating And Erecting Weak Corroded Pipe Lines Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting Weak Corroded Tees Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting Weak Corroded Nipples Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Throated Cross Member Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Throated Band Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Throated Flange Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Sloping Reducer Up To 12 And Providing A Satisfactory Leak Proof Trial. - Boiler Work , Removing The Old Corroded Platform And Replacing It With A New One - Boiler Work Total Quantity : 1698

BOQ

Sl. No. Item TitleItem Description
1Remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier errect 8x65 10x50 mm flat iron bars in their place clean the welded areas using a grinderBoiler Work
2Cut and remove the worn out bottom plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect new 6 8 10 mmBoiler Work
3Cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect 6 8 10 mm plates satisfactory trial runBoiler Work
4Cut out and remove the damaged and weak sections of the main bagasse carrier fabricate and errect a new assembly including the gear shaft system using the supplied plateBoiler Work
5Cut out and remove the weak and corroded sections of the bagasse feeding chutes errected boilers fabricate and replacements using the provided plates and repair the associated shafts and gearsBoiler Work
6The casings of the boiler ID and FD fans have become severely weakened and damaged The task involves cutting away and removing the weakened sections fabricatingBoiler Work
7Cut and remove the deteriorated side bottom and top plates surrounding the air heater of Boiler No. 3 fabricate and errect new plates using the specified 6 8 mm plate in their original positionsBoiler Work
8Fully strengthen the air heater plates and conduct a satisfactory trial.Boiler Work
9Dismantling the old air heater tubes of Boiler No. 01 size 63.5 mm OD x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawingBoiler Work
10Dismantling the old air heater tubes of Boiler No. 02 size 63.5 mm OD x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawingBoiler Work
11Dismantling the old air heater tubes of Boiler No. 03 size 63.5 mm OD x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawingBoiler Work
12a. Dismantling old columns beam channels etc. B. Manufacturing and installing new columns beam channelsBoiler Work
13Installing 16 inch 18 inch manholes with blindsBoiler Work
14Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to Twenty HPBoiler Work
15Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials.Boiler Work
16Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials.Boiler Work
17Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials.Boiler Work
18Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials.Boiler Work
19Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials.Boiler Work
20Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials.Boiler Work
21Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial.Boiler Work
22Removing the old corroded platform and replacing it with a new oneBoiler Work

AI Tender Summary

OUR REF NO 56196543
AUTHORITY Cooperative
TENDER VALUE 3.27 Lakhs
LAST DATE 13-07-2026
Authority
Authority Name Uttar Pradesh Cooperative Sugar Factories Federation Limited
Work Description Bids Are invited for Boiler House Febrication Work Remove The Worn Out Runners From The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Errect 8X65 10X50 Mm Flat Iron Bars In Their Place Clean The Welded Areas Using A Grinder - Boiler Work , Cut And Remove The Worn Out Bottom Plates Of The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Errect New 6 8 10 Mm - Boiler Work , Cut And Remove The Worn Out Side Plates Of The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Errect 6 8 10 Mm Plates Satisfactory Trial Run - Boiler Work , Cut Out And Remove The Damaged And Weak Sections Of The Main Bagasse Carrier Fabricate And Errect A New Assembly Including The Gear Shaft System Using The Supplied Plate - Boiler Work , Cut Out And Remove The Weak And Corroded Sections Of The Bagasse Feeding Chutes Errected Boilers Fabricate And Replacements Using The Provided Plates And Repair The Associated Shafts And Gears - Boiler Work , The Casings Of The Boiler Id And Fd Fans Have Become Severely Weakened And Damaged The Task Involves Cutting Away And Removing The Weakened Sections Fabricating - Boiler Work , Cut And Remove The Deteriorated Side Bottom And Top Plates Surrounding The Air Heater Of Boiler No. 3 Fabricate And Errect New Plates Using The Specified 6 8 Mm Plate In Their Original Positions - Boiler Work , Fully Strengthen The Air Heater Plates And Conduct A Satisfactory Trial. - Boiler Work , Dismantling The Old Air Heater Tubes Of Boiler No. 01 Size 63.5 Mm Od X 2.64 Mm Thickness Fabricating And Errecting New Tubes In Accordance With The Drawing - Boiler Work , Dismantling The Old Air Heater Tubes Of Boiler No. 02 Size 63.5 Mm Od X 2.64 Mm Thickness Fabricating And Errecting New Tubes In Accordance With The Drawing - Boiler Work , Dismantling The Old Air Heater Tubes Of Boiler No. 03 Size 63.5 Mm Od X 2.64 Mm Thickness Fabricating And Errecting New Tubes In Accordance With The Drawing - Boiler Work , A. Dismantling Old Columns Beam Channels Etc. B. Manufacturing And Installing New Columns Beam Channels - Boiler Work , Installing 16 Inch 18 Inch Manholes With Blinds - Boiler Work , Constructing A Bed For The Pump Fitting The Pump And Motor And Conducting A Trial Run Of Up To Twenty Hp - Boiler Work , Dismantling Fabricating And Erecting Weak Corroded Pipe Lines Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting Weak Corroded Tees Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting Weak Corroded Nipples Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Throated Cross Member Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Throated Band Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Throated Flange Up To 12 And Providing Satisfactory Leak Proof Trials. - Boiler Work , Dismantling Fabricating And Erecting A Weak Sloping Reducer Up To 12 And Providing A Satisfactory Leak Proof Trial. - Boiler Work , Removing The Old Corroded Platform And Replacing It With A New One - Boiler Work Total Quantity : 1698
Basic Detail
Tender No GEM/2026/B/7719006
Bidding Type Tender
Location
City Saharanpur
State Uttar Pradesh
Key Dates
Publish Date 27 Jun 2026
Submission Date 13 Jul 2026
Open Date 13 Jul 2026
Finance
Tender Value 3.27 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
fc4f69b0-4e0c-46d6-9398-e8c5c0bc312a.pdf
1782576658.xlsx
9529499_Boq_1.xlsx
BOILER_18266596-3fd6-4ff8-b6c71782576812102_bycn2.upcsffl.sre.pdf
boiler_house_2026-06-27-21-34-14_6b08a46a14ed512257690a7010854782.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 27, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Jul 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
pdf

fc4f69b0-4e0c-46d6-9398-e8c5c0bc312a.pdf

xlsx

1782576658.xlsx

xlsx

9529499_Boq_1.xlsx

upcsffl

BOILER_18266596-3fd6-4ff8-b6c71782576812102_bycn2.upcsffl.sre.pdf

pdf

boiler_house_2026-06-27-21-34-14_6b08a46a14ed512257690a7010854782.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders