Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard 1241 Res Class Of Ships; Individual Repair Case (Irc) For One Time Repairs Of Major Fire Fighting System Fitted Onboard 1241 Res Class Of Sh
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard 1241 Res Class Of Ships; Individual Repair Case (Irc) For One Time Repairs Of Major Fire Fighting System Fitted Onboard 1241 Res Class Of Ships; Service Provider - Retrieval Of Freon 114 B2 Gas Cylinders , Overhaul/Repairs/Refurbishment/Replacement Of Control Air Cylinder Head Assemblies , Repairs Repairs/Refurbishment/Replacement Followed By Pressure Testing/Acoustic Emission Testing Of All System Pipelines Subjected To Air Pressures/Extinguishing Agent. , Overhaul/Repairs/Replacement Of Systems Valves , Overhaul/Repairs/Replacement Of Pressure Reducer , Calibration Of Pressure Gauges , Chemical Cleaning And Pressure Testing Of Freon 114 B2 Containers , Pressure Testing Of Air Bottles , Repairs/Refurbishment/ Calibration Of Instrumentation Associated With Sound And Light Alarm , Overhaul/Repairs/ Replacement / Of Safety Valves , Cleaning And Hydraulic Pressure Testing Of Foam Compound Tanks .Removal And Refilling Of Foam Compound , Calibration Of Pressure Gauges , Pressure Reducers And Safety Valves , Repairs/ Refurbishment/Replacement Of Flexible Hoses , Overhaul Of Hp Air Cylinder Head Assembly , Cleaning/Painting And Pressure Testing Of Hp Air Cylinder , Repairs/ Refurbishment/Renewal Followed By Pressure Testing Of All Associated System Pipelines , Repairs/ Refurbishment/Renewal Of Foam Generated Including Wire Mesh , Renewal Of Hose Reel
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Retrieval of Freon 114 B2 gas cylinders | Retrieval of Freon 114 B2 gas cylinders |
| 2 | Overhaul/repairs/refurbishment/replacement of control air cylinder head assemblies | Overhaul/repairs/refurbishment/replacement of control air cylinder head assemblies |
| 3 | Repairs repairs/refurbishment/replacement followed by pressure testing/acoustic emission testing of all system pipelines subjected to air pressures/extinguishing agent. | Repairs repairs/refurbishment/replacement followed by pressure testing/acoustic emission testing of all system pipelines subjected to air pressures/extinguishing agent. |
| 4 | Overhaul/repairs/replacement of systems valves | Overhaul/repairs/replacement of systems valves |
| 5 | Overhaul/repairs/replacement of pressure reducer | Overhaul/repairs/replacement of pressure reducer |
| 6 | Calibration of pressure gauges | Calibration of pressure gauges |
| 7 | Chemical cleaning and pressure testing of Freon 114 B2 containers | Chemical cleaning and pressure testing of Freon 114 B2 containers |
| 8 | Pressure testing of air bottles | Pressure testing of air bottles |
| 9 | Repairs/refurbishment/ Calibration of instrumentation associated with sound and light alarm | Repairs/refurbishment/ Calibration of instrumentation associated with sound and light alarm |
| 10 | Overhaul/repairs/ replacement / of safety valves | Overhaul/repairs/ replacement / of safety valves |
| 11 | Cleaning and hydraulic pressure testing of foam compound tanks .Removal and refilling of foam compound | Cleaning and hydraulic pressure testing of foam compound tanks .Removal and refilling of foam compound |
| 12 | Calibration of pressure gauges , pressure reducers and safety valves | Calibration of pressure gauges , pressure reducers and safety valves |
| 13 | Repairs/ refurbishment/replacement of flexible hoses | Repairs/ refurbishment/replacement of flexible hoses |
| 14 | Overhaul of HP air cylinder head assembly | Overhaul of HP air cylinder head assembly |
| 15 | Cleaning/Painting and pressure testing of HP air cylinder | Cleaning/Painting and pressure testing of HP air cylinder |
| 16 | Repairs/ refurbishment/renewal followed by pressure testing of all associated system pipelines | Repairs/ refurbishment/renewal followed by pressure testing of all associated system pipelines |
| 17 | Repairs/ refurbishment/renewal of foam generated including wire mesh | Repairs/ refurbishment/renewal of foam generated including wire mesh |
| 18 | Renewal of hose reel | Renewal of hose reel |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender