| 1 | Removal and disposal of over burden of hard soil mixed with boulder including all lead, with proper disposal, labour charges and T&P required for proper completion of work |
| 2 | (a)-Removing boulder from canal bed which have fallen during overburden removal from R/B & L/B of canal during execution of work including all lead and lift with proper completion of work as per the direction of Engineer in Charge. |
| 3 | (b)-Earth work in excavation in sand stone,lime stone or other soft rock mixed with boulder by pick axe including all lead and lift with proper completion of work. |
| 4 | Providing and laying Coarse sand in filling for lining work including cost of all materials, labour charges & T&P etc. required for proper completion of work. |
| 5 | Supplying and laying of 150 micron LDPE film in bed before laying of concrete in lining including cost of all material, labour, T&P etc. required for proper completion of work. |
| 6 | Centering & shuttering for C.C work including cost of all material, labour, T&P etc. required for proper completion of work. |
| 7 | Laying P.C.C. 1:3:6 ( with 1 cement :3 coarse sand FM not less than 2.00, 6 stone ballast size 20 to 40 mm) including cost of all material, labour, T&P etc. with all lead and lift required for proper completion of work. |
| 8 | Laying C.C. 1:2:4 in bed (with cement, coarse sand of FM. not less than 2.0 and hard stone grit 4.75 mm to 20. mm size) including cost of all material, labour, T&P etc. with all lead and lift required for proper completion of work. |
| 9 | C.R. stone masonry with 1:3 cement coarse mortar including cost of material, T&P etc. required for proper completion of work. |
| 10 | Cement plaster 1:3 C.M. on stone masonry including cost of all materials,T&P etc required for proper completion of work.(20 mm thick) |
| 11 | 100 mm thick coping with cement concrete 1:2:4 for top of stone masonry wall finished with floating coat of neat cement. |
| 12 | Construction groove filling with sealing compound including cost of all materials, fuel for heating labour, T & P etc. required for proper completion of work. |
| 13 | Back filling in compacted C.R. Stone masonry wall with all lead & lift including cost of all material, labour, T&P etc. required for proper completion of work. Please Enable Macros to View BoQ information |