|
| 1 | Dismantling stone work in cement mortar including stacking of materials as directed by Engineer-in-charge within a distance of 60 M. with proper completion of work. |
| 2 | Earth work in excavation sand stone, lime stone or Other soft rock by pick axes but not required blasting including all lead & lift with proper completion of work. |
| 3 | Supplying and filling coarse sand on bed including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. |
| 4 | Supplying and laying of 150 micron LDPE film including cost of materials, Labour, all lead & lift,T&P etc. required for proper completion of work. |
| 5 | Centering & shuttering for concrete work including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. |
| 6 | Laying C.C. 1:2:4 (with 1 cement :2 Coarse sand FM not less than 2.00, 4 stone ballast size 4.75 to 20mm) including cost of all material, labour, all lead & lift. T&P etc. required for proper completion of work. |
| 7 | Laying C.C. 1:3:6 in foundation (with 1 cement, 3 Coarse sand, 6 stone ballast size 20 to 40mm) including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. |
| 8 | Cutting bending, binding and placing reinforcement in position including cost of all material, labour, T&P binding wire etc. required for proper completion of work. |
| 9 | R.C.C. work in M-20 (1:1.5:3) with 4.75mm to 20mm size graded hard stone grit and coarse sand including cost of material, labour, T & P etc. required for proper completion of work but excluding cost of reinforcement. |
| 10 | Providing and laying sealing compound in R.C.C. Pannel construction groove joint in proper position including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. |
| 11 | C.R. stone masonary with 1:3 (cement :coarse sand) mortor including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. |
| 12 | Providing and fixing 90 mm dia PVC Pipe in drainage spout & weep hole including cost of all materials, labours, all lead & lift,T&P etc, required for proper completion of work. |
| 13 | Providing and Fixing Joint filler board including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. |
| 14 | Cement pointing 1:2 C.M. on stone pitching including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. |
| 15 | Providing and laying graded filter at filling side of protection wall in layers as per drawing including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. |
| 16 | Laying stone (25.00 Kg to 60.00 kg weight) pitching with R.R Stone masonary in 1:4 cement mortor in slope of embankment including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. |
| 17 | Earth work in filling in back side of wall with all lead & lift including cost of all material, labour, all lead & lift. T&P etc. Required for proper completion of work. Please Enable Macros to View BoQ information |