|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth,1.5m width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50 m lift upto1.5m,as directed by Engineer-in charge. All kinds of soil |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 5 | 12 mm cement plaster of mix :1:6 (1 cement: 6 coarse sand) |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20cm in trenches,plinth, sides of foundation etc. complete |
| 8 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin-Charge. |
| 9 | S/L of 80mm thick rubber mold interlock tiles at sand base etc all complete. |
| 10 | Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres |
| 11 | S/S of 22.40-53mm gauge hard stone ballast etc all complete. |
| 12 | S/S of 2.80mm gauge stone dust etc all complete. |
| 13 | Consolidation of as above hard stone ballast etc all complete. |
| 14 | Water allowance to be allowed B/W 15th nov to 31st may etc all complete. |
| 15 | P/A tack coat with bitumen pressure distributor @0.35kg/sqm on the prepared bituminous surface clean with mechanical broom . |
| 16 | P/L 20mm thick premixing carpeting including seal coat etc all complete. |
| 17 | P/A thermoplastic paint for road margin etc all complete. |
| 18 | Deduction cost of old material bricks,bats etc all complete.Bricks |
| 19 | S/F of Inagauration name board etc all complete. Please Enable Macros to View BoQ information |