| 1 | Removal of land slide in hilly area in ordinary rock not requiring blasting by mechnical means including cutting and trimming of slops and disposal of cut material with in all leads, lift and other incidental and as per technical specification 302.3.5 and 1611 and as per direction and entire satisfaction of the Engineer-in Charge.. The rate including octroi, royality, Malkana, toll tax, sale tax,GST or other taxes imposed by the Government |
| 2 | Earth work in excavation in foundation for all types of structures such as retaining walls, breast walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, including saturated soil comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown on the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and obstructions necessary for placing the foundations, trimming, leveling ramming and watering bottom of excavation and back filling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 15cm (fifteen centimeter) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and MORD Technical Specification clause 305.1 and as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. |
| 3 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) for plain cement concrete, in or under water in open foundation for all types of structures, including pumping or bailing out water/ dewatering (surface/sub-soil water) and including removal of slush which may arise at the time of laying under water for all heights/depth and any quantum of water including cost of form work and curing complete as per drawing and MORD technical specification 802, 803, 1202 & 1203 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of material with in all leads lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government. |
| 4 | Providing and laying mechanically mixed and vibrated plain cement concrete pavement work Grade M-20 (Twenty) design mix to obtain the minimum compressive strength of 20 N/mm2 (twenty newton) per square millimeter) with cement contents not less than 320 kg (three hundredtwenty Killogramme) per cubic meter and curing complete excluding the cost of form work and cement concrete work in open foundation to give smooth surface mechanically mixed and vibrated including curring completel within all leads lifts and other incidentals as per approved specification drawing , design and as directed by the Engineer in charge within all leads lifts and other incidentals. The rate inclusive of Malkhana, Royality, Octroi, toll tax,sale tax ,GST and any taxes imposed by the Government. |
| 5 | Providing weep holes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimetres) diameters P.V.C. pipe extending through the full width of the structure with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specifications Clause 614, 709, 1204.3.7 , as per direction of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidental. The rate is including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.. |
| 6 | Construction of embankment with approved materials obtained from borrow pits within all leads and lifts, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 as per MORD technical specification section 400 including hauling of material with in all leads, lifts and other incidentals and as per the entire satisfaction and direction of Engineer-In-Charge. The rate is including Royality, Malkana, Octroi, toll tax, GST or any other taxes imposed by the Government. |
| 7 | Providing and laying of boulder apron laid in wire crates with 5 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301.completel within all leads lifts and other incidentals as per approved specification drawing , design and as directed by the Engineer in charge within all leads lifts and other incidentals. The rate inclusive of Malkhana, Royality, Octroi, toll tax,sale tax ,GST and any taxes imposed by the Government. Please Enable Macros to View BoQ information |