| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge.All kinds of soil |
| 2 | Ordinary Rock. |
| 3 | Hard Rock blasting prohibited |
| 4 | Providing and Laying of Stone soling in horizantal all Carriage complete job. |
| 5 | Providing and Laying in position Cement concrete of specified grade including curing but excluding the cost of centering and shuttering.All work upto plinth level with 1:3:6 mix.(Nallah). |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level . 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)Nallah. |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth leve.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 9 | Foundations, footings, bases for columns |
| 10 | Providing ,supplying ,lowering,laying Hydraulic testing and commissioning of PE-100 PN-10 HDPE pipe in standard lengths confirming to IS:4984/14151/12786/13488 with necessary jointing material and all kinds of pipe specials including transportation charges,inspection charges loading ,unloading charges joining procedure with all labours as directed by Engineer in charge incl.of all taxes and carriages complete job.110mm dia HDPE pipe. |
| 11 | Carriage of Material by Mech. Transport from source to site of work incl.loading , unloading and stacking of materials at site of work. Cement/Steel avg.lead for 35km. |
| 12 | Sand/agg. avg.lead for 5km |
| 13 | Carriage of Material by Manual means incl.loading , unloading and stacking of materials at site of work.Cement avg.lead for 750mtr. |
| 14 | Steelt avg.lead for 750mtr |
| 15 | Sand/agg. avg.lead for 750mtr. Please Enable Macros to View BoQ information |