| 1 | Part 1.Macadamization of Bhagthalli road from H/o Bodh Raj to H/o Raj Singh Under City and Towns (C&T) Sector Capex Budget 2026-27 |
| 2 | Providing and laying , spreading and compating crushed stone aggegrate of 63mm to 45mm size to WBM specification in uniform thickness, handpicking and rolling with 3wheeled roller/ vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming of 13.2mm nominal size (type-A) screening/binding material as stone dust to fill up interstices of coarse agg., watering and compacting to required density finished work to be measured including all leads and lifts and carriage of material by MT/HL. (conforming to clause 404 of MORT & H Specification) |
| 3 | Providing , laying, spreading and compacting crushed stone aggregate of 53 mm to 22.4 mm sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming of 11.2 mm nominal size (Type - B) screening/binding material as stone dust to fill up interstices of coarse aggregate, watering and compacting to the required density, finished work to be measured including all leads, lifts and carriage of material by MT/ H.L. (conforming to clause 404 of MORT&H specifications). |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On W.B.M. @ 0.75 Kg/sqm. |
| 5 | Providing and laying 50 mm thick bituminous macadam compacted thickness with bitumen of grade [email protected]%(Percentage by weight of total mix) prepared in batch type hot mix plant of 100-120 TPH capacity using crushed stone aggregates of specified grading premixed with with bituminous binder, transported by tippers, laid over a previously prepared surface with paver finished equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density complete as per specifications and directions of Engineer-in-Charge. |
| 6 | Providing and laying 25 mm Thick Semi- Dense Bituminous Concrete compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification complete and as per directions of Engineer-in-Charge. |
| 7 | Providing and fixing inauguration stone (granite of size 3/x 2/) including engraving , polishing etc and const. of pedestal of size 4'-6\\"x 5'-6\\" by way of brick work and plastering, painting incl. all leads , lifts and carriage of material by M .T./H.L. |
| 8 | Part 2. Macadamization of road from Chak Desa Singh to Cremation Ground, Under City andTowns (C&T) Sector Capex Budget 2026-27 |
| 9 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to Wet Mix Macadam ( W M M ) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density complete as per specifications and directions of Engineer-in-Charge. |
| 10 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On W.B.M. @ 0.75 Kg/sqm. |
| 11 | Providing and laying 50 mm thick bituminous macadam compacted thickness with bitumen of grade [email protected]%(Percentage by weight of total mix) prepared in batch type hot mix plant of 100-120 TPH capacity using crushed stone aggregates of specified grading premixed with with bituminous binder, transported by tippers, laid over a previously prepared surface with paver finished equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density complete as per specifications and directions of Engineer-in-Charge. |
| 12 | Providing and laying 25 mm Thick Semi- Dense Bituminous Concrete compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification complete and as per directions of Engineer-in-Charge. |
| 13 | Providing and fixing inauguration stone (granite of size 3/x 2/) including engraving , polishing etc and const. of pedestal of size 4'-6\\"x 5'-6\\" by way of brick work and plastering, painting incl. all leads , lifts and carriage of material by M .T./H.L. |
| 14 | Part 3. Macdamization of ITI road Kathua, Under City and Towns (C&T) Sector Capex Budget 2026-27 |
| 15 | Providing , laying, spreading and compacting crushed stone aggregate of 53 mm to 22.4 mm sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming of 11.2 mm nominal size (Type - B) screening/binding material as stone dust to fill up interstices of coarse aggregate, watering and compacting to the required density, finished work to be measured including all leads, lifts and carriage of material by MT/ H.L. (conforming to clause 404 of MORT&H specifications). |
| 16 | Providing and laying 50 mm thick bituminous macadam compacted thickness with bitumen of grade [email protected]%(Percentage by weight of total mix) prepared in batch type hot mix plant of 100-120 TPH capacity using crushed stone aggregates of specified grading premixed with with bituminous binder, transported by tippers, laid over a previously prepared surface with paver finished equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density complete as per specifications and directions of Engineer-in-Charge. |
| 17 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On W.B.M. @ 0.75 Kg/sqm. |
| 18 | Providing and laying 25 mm Thick Semi- Dense Bituminous Concrete compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification complete and as per directions of Engineer-in-Charge. |
| 19 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On bitumen surface @ 0.50 Kg/sqm. |
| 20 | Providing and fixing inauguration stone (granite of size 3/x 2/) including engraving , polishing etc and const. of pedestal of size 4'-6\\"x 5'-6\\" by way of brick work and plastering, painting incl. all leads , lifts and carriage of material by M .T./H.L. |
| 21 | Part 4. Macadamization of Barrain Pattan link road upto MRF, Under City and Towns (C&T) Sector Capex Budget 2026-27 |
| 22 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to Wet Mix Macadam ( W M M ) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density complete as per specifications and directions of Engineer-in-Charge. |
| 23 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On W.B.M. @ 0.75 Kg/sqm. |
| 24 | Providing and laying 50 mm thick bituminous macadam compacted thickness with bitumen of grade [email protected]%(Percentage by weight of total mix) prepared in batch type hot mix plant of 100-120 TPH capacity using crushed stone aggregates of specified grading premixed with with bituminous binder, transported by tippers, laid over a previously prepared surface with paver finished equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density complete as per specifications and directions of Engineer-in-Charge. |
| 25 | Providing and laying 25 mm Thick Semi- Dense Bituminous Concrete compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification complete and as per directions of Engineer-in-Charge. |
| 26 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On bitumen surface @ 0.50 Kg/sqm. |
| 27 | Providing and fixing inauguration stone (granite of size 3/x 2/) including engraving , polishing etc and const. of pedestal of size 4'-6\\"x 5'-6\\" by way of brick work and plastering, painting incl. all leads , lifts and carriage of material by M .T./H.L. Please Enable Macros to View BoQ information |